ProgrammableMarketing/edgerun.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 12
  • Big bets · 4
  • Wildcards · 2
  • How we can help
Generated Nov 10, 2026 1 view
  1. Programmable
  2. Playbooks
  3. Edgerun Industries
Edgerun Industries logo

growth playbook · Nov 10, 2026

edgerun.com (opens in a new tab)

Edgerun Industries growth playbook

Diagnosis

Edgerun launched on August 25, 2026, as a Y Combinator Summer 2026 company with a clear product (a sub-10 lb powered hip exoskeleton), more than 100 field tests with Ukrainian soldiers, a Kyiv field office, a D.C. government affairs office, an armor-maker integration partner and a SAM.gov registration.

Hiring is all engineering and supply chain, including production-scale factories and device-to-cloud telemetry, so the company is moving from prototype to production. The website has not caught up: four pages, no buyer path, no contact form, no spec sheet, no press or proof pages, and a 'third-party verification underway' footnote with nowhere to publish the result.

This playbook first gives units and program offices a way in (evaluation page, capability statement, press kit), then builds proof that defense evaluators trust (a published test protocol, mission pages tied to Army task lists, kit and battery compatibility, field reports, telemetry reports), then turns proof into paid pilots, a US evaluation, sustainment revenue and the dual-use markets the mission page already names.

Growth Score

6/10

Biggest Opportunity

Turn 100+ field tests and launch press into a credible, contractable buyer path: published protocol, independent results and a single place for units and program offices to ask for an evaluation.

Biggest Risk

Military exoskeletons have a long history of programs that stalled on weight, endurance and field reliability, so buyers will discount internal test numbers until independent verification is public.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Give units and program offices a way to ask for an evaluation: today every button on edgerun.com leads to the mission essay or careers

    Write the six form fields and the government-buyer block, and add an 'Request an evaluation' button to the homepage hero.

    High impact First result in 2 weeks
  2. 2

    Publish a one-page capability statement with the CAGE code, NAICS codes and the D.C. contact

    Fill the template from the SAM.gov record and the homepage specs.

    Medium impact First result in 2 weeks
  3. 3

    Add a press kit: specs, photos, founder bio and approved facts for the reporters already writing about Edgerun

    List the ten facts every story should get right.

    Medium impact First result in 1 month

02

Your idea portfolio

24 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 7 ideas are marked Unexpected: plays you are unlikely to have tried.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 2Big bets · 11Fill-ins · 6Reconsider · 5
Effort →

Showing 24 of 24 ideas

This week 6

Quick wins with a clear first action.

  • 01

    The homepage makes specific, buyer-grade claims (under 10 lb, 12+ hours on field-swappable drone batteries, 30-45% less effort per step, on in under 5 seconds) and lists a D.C. office for government affairs. But its only calls to action go to the Mission essay and Careers. The contact page has no form, just one email address for "all other inquiries". The sitemap has four pages and none is for buyers: no spec sheet, no evaluation request, no registration details, even though Edgerun has been active on SAM.gov with CAGE code 198E0 since June 2026. Launch coverage is sending defense readers to a site that only lets them read the essay or apply for a job.

    High impactLow effort First result in 2 weeks Government Affairs Lead

    First action

    Write the six form fields and the government-buyer block, and add an 'Request an evaluation' button to the homepage hero.

    How to measure it

    Evaluation requests from units, program offices and labs

    Now
    –
    Target
    10 qualified requests
    By
    90 days

    Steps

    1. 1

      Define the fields

      Organisation type, country, mission, soldiers, load, timeline.

      Government Affairs Lead (D.C. office) 1 day

    2. 2

      Write the spec sheet

      One page that matches the homepage numbers, with test conditions and the verification status.

      Founder & CEO 2 days

    3. 3

      Add the buyer block

      Legal name, CAGE, UEI, NAICS and the D.C. contact.

      Government Affairs Lead (D.C. office) 2 hours

    4. 4

      Build the page

      /evaluate in the existing Next.js site, linked from the hero, nav and contact page; add it to the sitemap.

      Software Engineer 3 days

    5. 5

      Set routing

      Government requests go to D.C., in-theatre requests to Kyiv; reply within one business day.

      Government Affairs Lead (D.C. office) 1 day

    6. 6

      Point press at it

      Send the page to the outlets that covered the launch and use it in outreach.

      Founder & CEO 1 day

    7. 7

      Review monthly

      Requests by type and country, time to reply, and conversions to evaluations.

      Founder & CEO monthly

    First result
    2 weeks
    Cost
    Staff time only
    Owner
    Government Affairs Lead (D.C. office)

    Smallest test

    Add a 'Request an evaluation' button that opens a five-field form, and count requests for 30 days.

    Why it works

    Add one page, /evaluate, and link it from the homepage hero, the navigation and the contact page. It holds: (1) a short request form with organisation type (unit, program office, research lab, integrator, other), country, mission type using the homepage's own five (assault, CASEVAC, ascent, patrol, resupply), number of soldiers, typical carried load and timeline; (2) a one-page spec sheet PDF matching the homepage numbers, with the test conditions behind the 30-45% figure; (3) a 'for government buyers' block with the legal name, CAGE code, UEI and NAICS codes, naming the D.C. office as the contact; (4) the Ukrainian Air Assault Forces quote and the Balistyka integration as proof. Route US and allied government requests to D.C. within one business day and in-theatre requests to the Kyiv field team. Keep the contact email for everything else.

    Defense buyers and innovation cells screen suppliers quietly before they write to anyone. A page with the right fields does three things at once: it qualifies the request, shows the company can be contracted, and replaces a cold email with an evaluation request the team can act on. Launch press is already sending readers to the site.

    Ready to use

    ChecklistEvaluation page launch list

    [ ] 'Request an evaluation' button in the homepage hero and nav
    [ ] Form: organisation type, country, mission, soldiers, load, timeline
    [ ] One-page spec sheet PDF with test conditions
    [ ] Government buyer block: legal name, CAGE, UEI, NAICS, D.C. contact
    [ ] Proof: unit quote and Balistyka integration
    [ ] Routing: D.C. for government, Kyiv for in-theatre requests
    [ ] /evaluate added to the sitemap
    [ ] Contact page links to /evaluate

    Risks and how to handle them

    • Spam or unqualified requests

      Require organisation type and country, and screen before replying.

    • Sharing too much detail publicly

      Keep the spec sheet to the numbers already on the homepage; share more only under NDA after screening.

    Evidence

    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
    • Your websiteContact page: no form or fields; office clocks for Palo Alto, DC and Kyiv, a link to Careers, and one email address for "all other inquiries". There is no route for a unit, program office, partner or journalist to ask for an evaluation, a spec sheet or a briefing.Source
    • Your websiteSitemap (checked November 9, 2026): four URLs (home, mission, careers, contact), all with the same lastmod of October 19, 2026, listed on the bare edgerun.com host while the site serves from www.edgerun.com; no product, specs, test, press or news pages. An automated crawl read the navigation link text as spaced letters ("M i s s i o n", "C a r e e r s", "C o n t a c t").Source
    • Public recordsSAM.gov registration: Edgerun Industries, Inc., active since June 5, 2026 (to June 5, 2027) for all awards, CAGE 198E0; primary NAICS 541715 (engineering R&D), also 333998, 336413, 336999, 339113 and 541330; a manufacturer of goods incorporated in Delaware.Source
    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
  • 02

    Edgerun is registered on SAM.gov for all awards, with a CAGE code and six NAICS codes from R&D to manufacturing, and has a D.C. government affairs office. None of this is on the website, and there is no document a contracting officer or innovation office can file.

    Medium impactLow effort First result in 2 weeks Government Affairs Lead

    First action

    Fill the template from the SAM.gov record and the homepage specs.

    How to measure it

    Downloads leading to a meeting

    Now
    –
    Target
    5 meetings
    By
    90 days

    Steps

    1. 1

      Gather data

      UEI, CAGE, NAICS and legal name from SAM.gov.

      Government Affairs Lead (D.C. office) 1 hour

    2. 2

      Write the page

      Capability, differentiators, past performance and contact.

      Government Affairs Lead (D.C. office) 1 day

    3. 3

      Check claims

      Every number matches the homepage and the test notes.

      Founder & CEO 2 hours

    4. 4

      Design

      One page in the site's look, as a PDF.

      Software Engineer 1 day

    5. 5

      Host

      Link it from /evaluate and the footer.

      Software Engineer 1 hour

    6. 6

      Update quarterly

      Add new evaluations and verification results.

      Government Affairs Lead (D.C. office) quarterly

    First result
    2 weeks
    Cost
    $0
    Owner
    Government Affairs Lead (D.C. office)

    Smallest test

    Email the PDF to three existing defense contacts this week.

    Why it works

    Write the standard one-page capability statement: core capability (powered load-carriage exoskeleton), differentiators (weight, runtime, battery commonality, field-tested), past performance (100+ field tests with Ukrainian units, the Balistyka integration), company data (UEI, CAGE, NAICS) and the D.C. point of contact. Host it on /evaluate and bring it to every meeting.

    Government buyers expect this format. It answers the 'can we contract them?' question in seconds and travels by email inside the buyer's organisation.

    Risks and how to handle them

    • Claims outrun verification

      Label internal numbers as internal until independent results are in.

    Builds on

    Evidence

    • Public recordsSAM.gov registration: Edgerun Industries, Inc., active since June 5, 2026 (to June 5, 2027) for all awards, CAGE 198E0; primary NAICS 541715 (engineering R&D), also 333998, 336413, 336999, 339113 and 541330; a manufacturer of goods incorporated in Delaware.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 03

    Runtime Wire and Exoskeleton Report covered the launch, using the founder's launch post and the accelerator listing. The site has no press or news page, so reporters fill gaps from third-party listings and repeat the performance figures as unverified company claims.

    Medium impactLow effort First result in 1 month Founder & CEO

    First action

    List the ten facts every story should get right.

    How to measure it

    New articles citing the press page

    Now
    –
    Target
    5
    By
    90 days

    Steps

    1. 1

      Write the fact sheet

      Ten approved facts with sources.

      Founder & CEO 1 day

    2. 2

      Clear photos

      OPSEC review of field images: no faces, unit markings or locations without consent.

      Senior Field Engineer (Kyiv) 2 days

    3. 3

      Build /press

      Facts, photos, bio, logos and coverage.

      Software Engineer 1 day

    4. 4

      Add a contact

      A press address routed to the founder.

      Founder & CEO 1 hour

    5. 5

      Tell outlets

      Send the page to the reporters who covered the launch.

      Founder & CEO 1 day

    6. 6

      Keep it current

      Update after each milestone.

      Founder & CEO monthly

    First result
    1 month
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Publish the fact sheet alone and send it to one outlet.

    Why it works

    Add /press with the approved fact sheet (weight, runtime, assist with test conditions, field test count, offices, partners), high-resolution photos cleared for OPSEC, the founder bio, logos, coverage so far and a press contact. Link it in the footer.

    Reporters copy what is easiest to find. One official source keeps numbers consistent and makes the next story easier to write.

    Risks and how to handle them

    • Field photos reveal too much

      Review every image with the field team before it goes up.

    Evidence

    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
    • PressExoskeleton Report (week 35 newsletter, August 30, 2026): an item titled "The 10 lb Military Exoskeleton" on a Y Combinator Summer 2026 company aiming to "add torque to every step under combat load"; the same issue covers consumer launches from Hypershell and others.Source
    • Your websiteSitemap (checked November 9, 2026): four URLs (home, mission, careers, contact), all with the same lastmod of October 19, 2026, listed on the bare edgerun.com host while the site serves from www.edgerun.com; no product, specs, test, press or news pages. An automated crawl read the navigation link text as spaced letters ("M i s s i o n", "C a r e e r s", "C o n t a c t").Source
  • 04

    The nav and footer links render with letter spacing that an automated crawl reads as "M i s s i o n", "C a r e e r s" and "C o n t a c t": separate letters, not words. Screen readers and some search and AI crawlers can read the same thing. The sitemap lists the bare edgerun.com host while the site serves from www.edgerun.com, and all four pages share one lastmod date. PageSpeed also flags contrast, ARIA and heading-order problems.

    Medium impactLow effort First result in 1 week Software Engineer

    First action

    Check the rendered nav HTML and swap spaced characters for CSS letter-spacing.

    How to measure it

    PageSpeed accessibility score

    Now
    –
    Target
    100
    By
    30 days

    Steps

    1. 1

      Inspect the nav

      Confirm how the spacing is produced.

      Software Engineer 1 hour

    2. 2

      Fix link text

      Real words with CSS letter-spacing, or aria-labels.

      Software Engineer 2 hours

    3. 3

      Fix the sitemap

      www host and true lastmod per page.

      Software Engineer 1 hour

    4. 4

      Fix accessibility

      Contrast, ARIA attributes and heading order.

      Software Engineer half a day

    5. 5

      Submit

      Resubmit the sitemap in Search Console.

      Software Engineer 15 minutes

    6. 6

      Retest

      PageSpeed and a screen-reader pass.

      Software Engineer 1 hour

    First result
    1 week
    Cost
    $0
    Owner
    Software Engineer

    Smallest test

    Fix the nav text on one link and run a screen reader over it.

    Why it works

    Use CSS letter-spacing on real words rather than spaced characters (or add aria-labels), generate the sitemap on the www host with true per-page dates, and fix the three accessibility issues. Add the new pages (evaluate, press) as they ship.

    On a four-page site every link counts. Clean link text and a correct sitemap help search engines, AI assistants and screen-reader users understand and reach each page.

    Risks and how to handle them

    • Visual style changes

      Letter-spacing in CSS keeps the same look.

    Evidence

    • Your websiteSitemap (checked November 9, 2026): four URLs (home, mission, careers, contact), all with the same lastmod of October 19, 2026, listed on the bare edgerun.com host while the site serves from www.edgerun.com; no product, specs, test, press or news pages. An automated crawl read the navigation link text as spaced letters ("M i s s i o n", "C a r e e r s", "C o n t a c t").Source
    • PageSpeedPageSpeed (November 9, 2026): mobile score 63, desktop 96. Real visitors pass Core Web Vitals (75th-percentile LCP 1.7s, INP 72ms, CLS 0), though field LCP is trending slower. In the mobile lab test the main content appears at 8.1s; the homepage downloads 9.2 MB, about 8 MB of it in 14 requests from the Sanity image CDN; better image delivery would save 540 KB. Accessibility scores 89, with contrast, ARIA and heading-order issues.Source
  • 05

    Real visitors pass Core Web Vitals today, but field LCP is trending slower. In Google's mobile test the main content takes 8.1s and the homepage downloads 9.2 MB, about 8 MB of it from the image CDN. Part of Edgerun's audience is in Kyiv and in the field, often on mobile or constrained connections.

    Medium impactLow effort First result in 1 week Software Engineer

    First action

    List the 14 CDN requests by size and find the largest three.

    How to measure it

    Homepage transfer size on mobile

    Now
    –
    Target
    under 2 MB
    By
    30 days

    Steps

    1. 1

      Profile

      The CDN requests by size.

      Software Engineer 1 hour

    2. 2

      Resize media

      Responsive sizes and modern formats from the image CDN.

      Software Engineer 1 day

    3. 3

      Lighten video

      Poster frame or shorter clip on mobile.

      Software Engineer half a day

    4. 4

      Lazy-load

      Carousel images below the fold.

      Software Engineer 2 hours

    5. 5

      Trim JavaScript

      Remove unused code (about 170 KB).

      Software Engineer half a day

    6. 6

      Set a budget

      Fail builds above 2 MB.

      Software Engineer 2 hours

    First result
    1 week
    Cost
    $0
    Owner
    Software Engineer

    Smallest test

    Compress the single largest asset and rerun PageSpeed.

    Why it works

    Serve hero and carousel media at the size each device needs (responsive images, modern formats, a lighter video or poster frame on mobile), lazy-load the mission carousel, and remove about 170 KB of unused JavaScript. Set a page-weight budget of 2 MB for the homepage.

    A lighter page loads reliably on weak connections and keeps the trend from turning into a Core Web Vitals failure.

    Risks and how to handle them

    • Lower visual quality

      Keep full quality on desktop; compress only mobile sizes.

    Evidence

    • PageSpeedPageSpeed (November 9, 2026): mobile score 63, desktop 96. Real visitors pass Core Web Vitals (75th-percentile LCP 1.7s, INP 72ms, CLS 0), though field LCP is trending slower. In the mobile lab test the main content appears at 8.1s; the homepage downloads 9.2 MB, about 8 MB of it in 14 requests from the Sanity image CDN; better image delivery would save 540 KB. Accessibility scores 89, with contrast, ARIA and heading-order issues.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 06

    The site has no newsletter, blog or news page, and the YouTube channel has 21 subscribers and one video. Everyone who reads the launch coverage (a buyer, a partner, an engineer, a reporter) leaves with no way to hear about the next milestone except following social accounts.

    Medium impactLow effort First result in 1 month Founder & CEO

    First action

    Add the email field with four interest options.

    How to measure it

    Update-list subscribers

    Now
    –
    Target
    500
    By
    90 days

    Steps

    1. 1

      Pick a tool

      A simple email tool connected to the site.

      Software Engineer 2 hours

    2. 2

      Add the field

      Homepage, mission and careers pages.

      Software Engineer half a day

    3. 3

      Write update one

      Launch recap and what is next.

      Founder & CEO 2 hours

    4. 4

      Promote

      Link from X, LinkedIn and the founder's essay.

      Founder & CEO 1 hour

    5. 5

      Send monthly

      Milestones only, short.

      Founder & CEO monthly

    6. 6

      Route interest

      Buyers to D.C., candidates to hiring.

      Government Affairs Lead (D.C. office) ongoing

    First result
    1 month
    Cost
    Under $50 a month
    Owner
    Founder & CEO

    Smallest test

    Add the field to the mission page only and count sign-ups for two weeks.

    Why it works

    Add one email field ('Get Edgerun updates') to the homepage, mission and careers pages, with a choice of interest: buying, partnering, joining or press. Send a short update every month or at each milestone: verification results, field test counts, new partners, open roles.

    Defense sales cycles are long. A list keeps early interest warm until there is something to buy, and it also feeds hiring.

    Risks and how to handle them

    • Sharing sensitive progress

      Review each update for OPSEC before sending.

    Evidence

    • Your channelsChannels: the YouTube channel has 21 subscribers, one video and 1,340 views; the site links X, Instagram and LinkedIn but has no blog, newsletter or news page.Source
    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source

This quarter 12

The core plays for the next three months.

  • 07

    The homepage's headline number, 30-45% assist, carries the footnote "Internal test data. Third-party verification underway." Press repeats it as a company claim. The category's reputation problem is weight, endurance and field reliability, so buyers will discount internal numbers until they can see how they were measured.

    High impactMedium effort First result in 6 weeks Founder & CEO

    First action

    Write up the protocol the third-party tester is using.

    How to measure it

    Evaluation requests citing the proof page

    Now
    –
    Target
    50% of requests
    By
    2 quarters

    Steps

    1. 1

      Document the protocol

      Load, speed, terrain, measures and subjects.

      Principal Engineer, Embedded Systems 1 week

    2. 2

      Agree publication

      Confirm with the independent tester what can be shared.

      Founder & CEO 1 week

    3. 3

      Add field reliability

      Hours, failures and fixes from field tests.

      Senior Field Engineer (Kyiv) 2 weeks

    4. 4

      Publish stage one

      /proof with the protocol and reliability data.

      Software Engineer 2 days

    5. 5

      Publish results

      Full third-party report when ready, whatever the result.

      Founder & CEO when ready

    6. 6

      Update the homepage

      Replace the footnote with a link to the results.

      Software Engineer 1 hour

    First result
    6 weeks
    Cost
    Staff time; the verification is already underway
    Owner
    Founder & CEO

    Smallest test

    Add a one-paragraph 'how we measured this' note under the homepage specs.

    Why it works

    Publish a /proof page in two stages. Now: the protocol (load carried, speed, terrain, duration, how effort is measured, number of subjects, who the independent tester is). Later: the third-party results with the full report. Add field reliability data from the 100+ field tests: hours run, failures and fixes.

    Publishing the method before the result shows confidence, and it lets evaluators compare Edgerun's numbers with their own protocols instead of ignoring them.

    Risks and how to handle them

    • Independent results come in below 30%

      Publish the conditions in which each level was achieved; honesty builds more trust than a range.

    • Protocol reveals sensitive details

      Publish method and outcomes, not design internals.

    Evidence

    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
  • 08

    The homepage names five missions (assault, CASEVAC, ascent, patrol, resupply) as one-word carousel cards. A US Army request for information on exoskeletons listed concrete tasks: tactical movement with 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags, dragging a 270 lb casualty 45 ft. It also asked for demonstrated safety, kit integration, energy efficiency and readiness data. Edgerun's mission words do not yet connect to those tasks.

    High impactMedium effort First result in 1 month Government Affairs Lead

    First action

    Map each homepage mission to the closest tasks in published Army requests.

    How to measure it

    Requests that select a mission page

    Now
    –
    Target
    60%
    By
    2 quarters

    Steps

    1. 1

      Map tasks

      Five missions to published task lists.

      Government Affairs Lead (D.C. office) 2 days

    2. 2

      Gather field data

      Per-mission observations from Kyiv.

      Senior Field Engineer (Kyiv) 2 weeks

    3. 3

      Write pages

      Task, load, results, battery, kit, limits.

      Founder & CEO 1 week

    4. 4

      OPSEC review

      No unit, place or tactic details.

      Senior Field Engineer (Kyiv) 2 days

    5. 5

      Publish

      Link from the carousel cards and /evaluate.

      Software Engineer 2 days

    6. 6

      Refresh

      Add verified results as they arrive.

      Government Affairs Lead (D.C. office) quarterly

    First result
    1 month
    Cost
    Staff time only
    Owner
    Government Affairs Lead (D.C. office)

    Smallest test

    Publish the CASEVAC page first and share it with two evaluators.

    Why it works

    Write one page per mission: the task and load, what the exoskeleton does in it, what was observed in field tests, battery life in that mission, how it works with the kit worn, and limits. Use the language evaluators use for tasks, loads and distances.

    Evaluators score against task lists. Pages built on the same structure are easier to shortlist and easier to quote in internal memos.

    Risks and how to handle them

    • Overclaiming in combat roles

      State tested conditions and limits on every page.

    Builds on

    Evidence

    • Industry researchJanes (March 2022): a US Army request for information on powered and unpowered exoskeletons listed tasks such as tactical movement carrying 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags and dragging a 270 lb casualty 45 ft, and asked for demonstrated safety, integration with clothing and mission equipment, energy efficiency and readiness information.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 09

    The homepage promises it "Directly integrates with the kit you already wear", and the Army's request listed integration with clothing and mission equipment as a requirement. But a buyer cannot see which belts, carriers or packs have actually been tested, apart from the Balistyka partnership.

    High impactMedium effort First result in 6 weeks Mechanical Engineer

    First action

    Ask the Kyiv team for the ten kit setups they meet most often.

    How to measure it

    Tested kit setups on the list

    Now
    –
    Target
    20
    By
    2 quarters

    Steps

    1. 1

      List kit

      Ten most common setups seen in the field.

      Senior Field Engineer (Kyiv) 1 week

    2. 2

      Fit test

      Each setup with load and movement.

      Mechanical Prototyper (Kyiv) 3 weeks

    3. 3

      Design adapters

      For near-misses.

      Mechanical Engineer 3 weeks

    4. 4

      Publish the table

      Status, notes and photos.

      Software Engineer 2 days

    5. 5

      Add fit checks

      Request form for unlisted kit.

      Software Engineer 1 day

    6. 6

      Extend

      Add US and NATO kit before US evaluations.

      Mechanical Engineer quarterly

    First result
    6 weeks
    Cost
    Kit samples, a few thousand dollars
    Owner
    Mechanical Engineer

    Smallest test

    Publish the three setups already tested in the field.

    Why it works

    Test fit with the most common belt, plate carrier and pack systems the field team sees, and publish a compatibility table: fit status (tested, works with adapter, not compatible), notes and photos. Add a 'request a fit check' option for unlisted kit.

    Fit with existing kit is a go/no-go question for logisticians. A list answers it before the meeting and shows real integration work.

    Risks and how to handle them

    • Naming third-party kit

      Describe fit factually and avoid implying endorsement.

    Evidence

    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
    • Industry researchJanes (March 2022): a US Army request for information on powered and unpowered exoskeletons listed tasks such as tactical movement carrying 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags and dragging a 270 lb casualty 45 ft, and asked for demonstrated safety, integration with clothing and mission equipment, energy efficiency and readiness information.Source
    • HiringCareers page: nine open roles, six in Palo Alto (Principal Engineer, Embedded Systems; Mechanical, Electrical, Firmware and Software Engineers; Supply Chain Engineer) and three in Kyiv (Senior Field Engineer, Mechanical Prototyper, Software Engineer), posted September 11 to October 25, 2026; each Apply button opens a Notion page; "We are looking for world-class talent ready to tackle challenging projects that remove civilization-level constraints limiting the human body."Source
  • 10

    Balistyka, a Kyiv body-armor and tactical-equipment maker founded in 2014, is named on the homepage as an integration partner, but there is no page, joint spec or way to buy the combination. An armor maker's existing customers already buy load-bearing kit.

    High impactMedium effort First result in 1 quarter Founder & CEO

    First action

    Agree with Balistyka what the joint configuration is and who sells it.

    How to measure it

    Partner-sourced evaluation requests

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      Define the package

      Configuration and spec sheet.

      Mechanical Engineer 2 weeks

    2. 2

      Agree terms

      Referral and support split.

      Founder & CEO 2 weeks

    3. 3

      Build pages

      Joint page on both sites.

      Software Engineer 1 week

    4. 4

      Train partner sales

      Demo kit and talk track.

      Senior Field Engineer (Kyiv) 1 week

    5. 5

      Track

      Requests and evaluations from the partner.

      Government Affairs Lead (D.C. office) monthly

    6. 6

      Repeat

      One more kit maker.

      Founder & CEO next quarter

    First result
    1 quarter
    Cost
    Demo units and staff time
    Owner
    Founder & CEO

    Smallest test

    One joint demo for a unit that already uses Balistyka kit.

    Why it works

    Agree a joint package with Balistyka: a tested carrier-plus-exoskeleton configuration, a shared spec sheet, a co-branded page on both sites and a referral arrangement so Balistyka's sales team can offer evaluations. Use the same model for one or two more kit makers.

    A partner's sales team reaches buyers who already trust them, and a tested configuration removes an integration question.

    Risks and how to handle them

    • Dependence on one partner

      Add a second kit maker within two quarters.

    Builds on

    Evidence

    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 11

    The homepage says the exoskeleton "runs on drone batteries, field-swappable" for 12+ hours, but it does not say which ones. Units that fly drones already stock, charge and move those batteries, so an exoskeleton that shares them adds no new logistics. That advantage is invisible unless it is specific.

    Medium impactMedium effort First result in 1 quarter Electrical Engineer

    First action

    List the battery types tested so far and the runtime on each.

    How to measure it

    Published compatible battery types

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      List batteries

      Types tested and runtimes.

      Electrical Engineer 1 week

    2. 2

      Survey the field

      Which packs units actually stock.

      Senior Field Engineer (Kyiv) 2 weeks

    3. 3

      Test

      Runtime and safety on each type.

      Electrical Engineer 4 weeks

    4. 4

      Publish

      Table on the spec sheet and site.

      Software Engineer 2 days

    5. 5

      Approach makers

      Compatibility listing and data sharing.

      Founder & CEO 1 month

    6. 6

      Feature it

      Lead with commonality in buyer materials.

      Government Affairs Lead (D.C. office) 1 day

    First result
    1 quarter
    Cost
    Battery samples and test time
    Owner
    Electrical Engineer

    Smallest test

    Add a 'Runs on' line with the tested pack types to the spec sheet.

    Why it works

    Publish the supported battery types and runtime per type, test the most common packs used by drone operators, and approach one or two battery makers for a 'certified compatible' listing and shared field data. Use battery commonality as a headline benefit in buyer materials.

    Logistics burden is a common reason powered kit gets rejected. Showing that no new battery enters the supply chain answers that objection directly.

    Risks and how to handle them

    • Battery safety on untested packs

      List only tested packs and lock out unknown ones in firmware.

    Evidence

    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
    • Industry researchJanes (March 2022): a US Army request for information on powered and unpowered exoskeletons listed tasks such as tactical movement carrying 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags and dragging a 270 lb casualty 45 ft, and asked for demonstrated safety, integration with clothing and mission equipment, energy efficiency and readiness information.Source
  • 12

    Edgerun's YouTube channel has one video, 21 subscribers and 1,340 views, yet the company has run more than 100 field tests. The claim is physical (less effort per step under load), and physical claims are most convincing on video.

    Medium impactMedium effort First result in 1 month Founder & CEO

    First action

    Film one side-by-side march at the Palo Alto site.

    How to measure it

    Channel views

    Now
    –
    Target
    50,000
    By
    2 quarters

    Steps

    1. 1

      Plan the series

      Five videos, one claim each.

      Founder & CEO 2 days

    2. 2

      Set the rules

      OPSEC checklist; no operational footage.

      Senior Field Engineer (Kyiv) 1 day

    3. 3

      Film

      Side-by-side marches with data overlays.

      Software Engineer 2 weeks

    4. 4

      Edit and cut

      Long version plus short clips.

      Founder & CEO 1 week

    5. 5

      Publish

      YouTube and social; embed on mission pages.

      Founder & CEO weekly

    6. 6

      Measure

      Views and requests that mention video.

      Government Affairs Lead (D.C. office) monthly

    First result
    1 month
    Cost
    A few thousand dollars in filming
    Owner
    Founder & CEO

    Smallest test

    One 60-second side-by-side clip posted to X and LinkedIn.

    Why it works

    Produce a short series: the same marcher with and without the exoskeleton over the same route and load, heart rate and time on screen; a five-second don/doff clip; a battery swap; a CASEVAC drag. Film in Palo Alto or on training ground, never in operational areas. Cut each into short clips for X, Instagram and LinkedIn.

    Evaluators and reporters share video that shows the claim. Side-by-side tests are easy to understand and hard to fake.

    Risks and how to handle them

    • Footage reveals sensitive details

      Film only in controlled locations and review every frame.

    Evidence

    • Your channelsChannels: the YouTube channel has 21 subscribers, one video and 1,340 views; the site links X, Instagram and LinkedIn but has no blog, newsletter or news page.Source
    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
  • 13

    Edgerun has a Kyiv field office, more than 100 field tests and is hiring a Senior Field Engineer, a Mechanical Prototyper and a Software Engineer there. Its mission line is "Built in Silicon Valley, with feedback from the front line", but none of that feedback is published.

    Medium impactLow effort First result in 1 month Senior Field Engineer

    First action

    Write the October report from existing test notes.

    How to measure it

    Monthly report opens

    Now
    –
    Target
    1,000
    By
    2 quarters

    Steps

    1. 1

      Set the template

      Tests, hours, issues, fixes, requests.

      Senior Field Engineer (Kyiv) 1 day

    2. 2

      Pull data

      From the test and log database.

      Software Engineer (Kyiv) 2 hours

    3. 3

      Write

      One page.

      Senior Field Engineer (Kyiv) 2 hours

    4. 4

      Review

      OPSEC and accuracy.

      Founder & CEO 1 hour

    5. 5

      Publish

      Site, updates list and LinkedIn.

      Founder & CEO 1 hour

    6. 6

      Repeat

      Every month.

      Senior Field Engineer (Kyiv) monthly

    First result
    1 month
    Cost
    $0
    Owner
    Senior Field Engineer (Kyiv)

    Smallest test

    Post one field report on LinkedIn and watch the response.

    Why it works

    Publish a short monthly report: tests run, hours logged, top three issues and the fix shipped, and one change requested by users. Keep it free of unit, location and tactic detail. Send it to the updates list and post a summary on LinkedIn.

    Showing the iteration loop is the best evidence against the category's reputation for unreliable hardware, and it attracts engineers who want field-tested work.

    Risks and how to handle them

    • Admitting failures

      Pair each issue with the fix; that is the point.

    Builds on

    Evidence

    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
    • HiringCareers page: nine open roles, six in Palo Alto (Principal Engineer, Embedded Systems; Mechanical, Electrical, Firmware and Software Engineers; Supply Chain Engineer) and three in Kyiv (Senior Field Engineer, Mechanical Prototyper, Software Engineer), posted September 11 to October 25, 2026; each Apply button opens a Notion page; "We are looking for world-class talent ready to tackle challenging projects that remove civilization-level constraints limiting the human body."Source
    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
  • 14

    Edgerun's SAM.gov registration covers all awards, with R&D (541715) as its primary NAICS code, and it has a D.C. government affairs office. Its field record is all in Ukraine so far. The US Army has asked industry about exoskeletons for load carriage before, so US research and innovation programs are a natural first door.

    High impactMedium effort First result in 2 quarters Government Affairs Lead

    First action

    List every currently open topic that mentions exoskeletons, load carriage or soldier physical performance.

    How to measure it

    US R&D proposals submitted

    Now
    –
    Target
    3
    By
    2 quarters

    Steps

    1. 1

      Scan topics

      Open US defense research topics on load and human performance.

      Government Affairs Lead (D.C. office) 1 week

    2. 2

      Build the pack

      Technical summary, data, protocol and capability statement.

      Principal Engineer, Embedded Systems 2 weeks

    3. 3

      Find a sponsor

      A US unit or lab willing to back the work.

      Government Affairs Lead (D.C. office) 1 month

    4. 4

      Submit

      Two or three best-fit proposals.

      Founder & CEO per deadline

    5. 5

      Track

      Status and feedback for each.

      Government Affairs Lead (D.C. office) monthly

    6. 6

      Reuse

      Improve the pack from reviewer feedback.

      Government Affairs Lead (D.C. office) quarterly

    First result
    2 quarters
    Cost
    Staff time; some proposal support if needed
    Owner
    Government Affairs Lead (D.C. office)

    Smallest test

    Submit one proposal to the best-fitting open topic.

    Why it works

    Keep a tracked list of US defense innovation and research funding channels and open topics relevant to soldier load carriage and human performance. Prepare a reusable proposal pack (technical summary, field data, test protocol, capability statement) and submit to the best two or three fits each quarter.

    Small R&D awards are the usual route from foreign field trials to a US evaluation. They pay for testing and create a US customer reference.

    Risks and how to handle them

    • Proposal work distracts engineers

      Reuse one pack and cap engineering time per proposal.

    Builds on

    Evidence

    • Public recordsSAM.gov registration: Edgerun Industries, Inc., active since June 5, 2026 (to June 5, 2027) for all awards, CAGE 198E0; primary NAICS 541715 (engineering R&D), also 333998, 336413, 336999, 339113 and 541330; a manufacturer of goods incorporated in Delaware.Source
    • Industry researchJanes (March 2022): a US Army request for information on powered and unpowered exoskeletons listed tasks such as tactical movement carrying 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags and dragging a 270 lb casualty 45 ft, and asked for demonstrated safety, integration with clothing and mission equipment, energy efficiency and readiness information.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 15

    Edgerun is hiring a Supply Chain Engineer to build production-scale manufacturing, and a Senior Field Engineer in Kyiv. Moving from free field tests to production needs paying customers, but the site offers no defined way to buy anything.

    High impactMedium effort First result in 1 quarter Founder & CEO

    First action

    Cost 10 units plus support for 60 days and set a price.

    How to measure it

    Paid pilots

    Now
    –
    Target
    3
    By
    2 quarters

    Steps

    1. 1

      Cost it

      Units, spares, travel and support.

      Supply Chain Engineer 1 week

    2. 2

      Define deliverables

      Training, support and closing report.

      Senior Field Engineer (Kyiv) 1 week

    3. 3

      Set the price

      With credit toward follow-on orders.

      Founder & CEO 2 days

    4. 4

      Write the offer

      One page on /evaluate.

      Government Affairs Lead (D.C. office) 2 days

    5. 5

      Offer it

      To current test units and new requests.

      Founder & CEO ongoing

    6. 6

      Report

      Closing report for every pilot.

      Senior Field Engineer (Kyiv) per pilot

    First result
    1 quarter
    Cost
    Built units and field engineer time
    Owner
    Founder & CEO

    Smallest test

    Offer the pilot to one unit already testing.

    Why it works

    Define a fixed-price pilot: 10 devices, spare batteries and parts, two days of training, a field engineer on call, and a closing report built from device data (hours, distance, issues, user feedback). Credit the pilot price against a follow-on order. Offer it on /evaluate.

    A defined, small purchase is easier to approve than an open-ended discussion, and it turns field tests into revenue and reference data.

    Risks and how to handle them

    • Production can't meet pilot demand

      Cap pilots per quarter to what supply chain can build.

    Builds on

    Evidence

    • HiringSupply Chain Engineer (Palo Alto): qualify partners for metal 3D printing, short-batch PCBA and CNC machining for prototypes, and build out production-scale factories for aluminum, titanium, mass CNC, SMT, composites and soft goods; qualifying US factories is preferred.Source
    • HiringCareers page: nine open roles, six in Palo Alto (Principal Engineer, Embedded Systems; Mechanical, Electrical, Firmware and Software Engineers; Supply Chain Engineer) and three in Kyiv (Senior Field Engineer, Mechanical Prototyper, Software Engineer), posted September 11 to October 25, 2026; each Apply button opens a Notion page; "We are looking for world-class talent ready to tackle challenging projects that remove civilization-level constraints limiting the human body."Source
    • Your websiteContact page: no form or fields; office clocks for Palo Alto, DC and Kyiv, a link to Careers, and one email address for "all other inquiries". There is no route for a unit, program office, partner or journalist to ask for an evaluation, a spec sheet or a briefing.Source
  • 16

    For a small hardware company, hiring is the growth constraint: nine open roles across Palo Alto and Kyiv. The careers page is one sentence and nine links that open Notion pages. Machine readers see little there, so the posts are unlikely to appear in job search. Meanwhile the founder's own hiring post gave salary and equity ranges and said hardware is already on real users in the field, which is the strongest pitch Edgerun has.

    High impactLow effort First result in 1 month Founder & CEO

    First action

    Move the Principal Engineer, Embedded Systems role onto the site with its pay range.

    How to measure it

    Qualified applicants per role

    Now
    –
    Target
    2x
    By
    90 days

    Steps

    1. 1

      Template

      Owns, shipped, pay, equity, travel, apply.

      Founder & CEO 1 day

    2. 2

      Write roles

      All nine roles.

      Founder & CEO 3 days

    3. 3

      Build pages

      On the Next.js site, with structured data.

      Software Engineer 2 days

    4. 4

      Add culture

      Field photos and mission.

      Founder & CEO 1 day

    5. 5

      Submit

      Sitemap and Search Console.

      Software Engineer 1 hour

    6. 6

      Track

      Applicants by source.

      Founder & CEO monthly

    First result
    1 month
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Move one role on-site and compare applicants with its Notion version.

    Why it works

    Move each role onto an edgerun.com page with what the role owns, what was shipped last month, pay and equity ranges, field travel (Kyiv), and how to apply. Add job-posting structured data so roles appear in job search. Add a short 'what working here is like' section with field photos and the mission.

    Engineers choose hardware startups on mission, pay and proof of real users. Indexed roles reach passive candidates who will never see a Notion link.

    Risks and how to handle them

    • Publishing pay ranges

      Use bands, as the founder's own hiring post already did.

    Evidence

    • HiringCareers page: nine open roles, six in Palo Alto (Principal Engineer, Embedded Systems; Mechanical, Electrical, Firmware and Software Engineers; Supply Chain Engineer) and three in Kyiv (Senior Field Engineer, Mechanical Prototyper, Software Engineer), posted September 11 to October 25, 2026; each Apply button opens a Notion page; "We are looking for world-class talent ready to tackle challenging projects that remove civilization-level constraints limiting the human body."Source
    • HiringFounder's hiring post for principal engineers (YC S26): a wearable that reduces the effort of carrying heavy loads over distance, already with hardware on real users in the field; the software principal owns device-to-cloud telemetry, test and log databases, data pipelines and user applications, and firmware covers OTA updates; $200K–$250K salary plus equity, onsite in Palo Alto.Source
  • 17

    Edgerun's software principal owns device-to-cloud telemetry, test and log databases and user applications, and the firmware supports OTA updates. That data shows what the exoskeleton did in the field: hours worn, distance, assist delivered, battery swaps, faults. Today it serves engineering only.

    High impactMedium effort First result in 1 quarter Software Engineer

    First action

    Define the eight numbers a commander would want on one page.

    How to measure it

    Pilots converting to follow-on orders

    Now
    –
    Target
    50%
    By
    3 quarters

    Steps

    1. 1

      Define the numbers

      Eight metrics; no locations.

      Senior Field Engineer (Kyiv) 2 days

    2. 2

      Build the pipeline

      From the log database to a report.

      Software Engineer 3 weeks

    3. 3

      Design the page

      One printable page.

      Software Engineer 1 week

    4. 4

      Privacy review

      Strip location and identity data.

      Principal Engineer, Embedded Systems 1 week

    5. 5

      Pilot it

      With one current test unit.

      Senior Field Engineer (Kyiv) 1 month

    6. 6

      Roll out

      Every pilot and customer.

      Software Engineer ongoing

    First result
    1 quarter
    Cost
    Engineering time
    Owner
    Software Engineer

    Smallest test

    Hand-build one report from existing logs for a current test unit.

    Why it works

    Build a unit-level report from telemetry: total hours and distance under load, average assist, battery swaps, uptime, faults and fixes, plus user feedback. Deliver it at the end of every pilot and monthly to customers, with no location data. Use aggregate numbers (with permission) on the proof page.

    Commanders and program offices need evidence to justify the next purchase. A report from real use is that evidence, and it makes the device hard to replace.

    Risks and how to handle them

    • Telemetry raises security concerns

      Offer an offline export mode and no location capture.

    Builds on

    Evidence

    • HiringFounder's hiring post for principal engineers (YC S26): a wearable that reduces the effort of carrying heavy loads over distance, already with hardware on real users in the field; the software principal owns device-to-cloud telemetry, test and log databases, data pipelines and user applications, and firmware covers OTA updates; $200K–$250K salary plus equity, onsite in Palo Alto.Source
    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
  • 18

    Edgerun's field work runs through a small Kyiv team, and it is hiring a Senior Field Engineer there. As pilots multiply, one field team cannot train every soldier, and kit that soldiers are not trained on tends to be left behind.

    Medium impactMedium effort First result in 1 quarter Senior Field Engineer

    First action

    Write the fitting and fault checklist the field team already uses.

    How to measure it

    Weekly hours worn per device in trained units

    Now
    –
    Target
    +30%
    By
    2 quarters

    Steps

    1. 1

      Write the course

      Fit, don and doff, batteries, faults, care.

      Senior Field Engineer (Kyiv) 2 weeks

    2. 2

      Make the guide

      Pocket card in Ukrainian and English.

      Mechanical Prototyper (Kyiv) 1 week

    3. 3

      Pilot

      Certify trainers in one unit.

      Senior Field Engineer (Kyiv) 2 days

    4. 4

      Support line

      Direct contact to the field team.

      Software Engineer (Kyiv) 1 week

    5. 5

      Track usage

      From telemetry, trained versus untrained.

      Software Engineer monthly

    6. 6

      Scale

      Include in every pilot package.

      Founder & CEO ongoing

    First result
    1 quarter
    Cost
    Field team time
    Owner
    Senior Field Engineer (Kyiv)

    Smallest test

    Certify one trainer in one unit and compare usage.

    Why it works

    Create a two-day train-the-trainer course: fitting, the under-5-second don and doff, battery swaps, basic faults and care. Certify one or two soldiers per unit, give them a pocket guide and a direct line to the field team, and track usage by trained unit.

    Unit trainers keep the device in use after the vendor leaves, which drives follow-on orders and lowers support cost.

    Risks and how to handle them

    • Trainers rotate out

      Certify two per unit and refresh each rotation.

    Builds on

    Evidence

    • HiringCareers page: nine open roles, six in Palo Alto (Principal Engineer, Embedded Systems; Mechanical, Electrical, Firmware and Software Engineers; Supply Chain Engineer) and three in Kyiv (Senior Field Engineer, Mechanical Prototyper, Software Engineer), posted September 11 to October 25, 2026; each Apply button opens a Notion page; "We are looking for world-class talent ready to tackle challenging projects that remove civilization-level constraints limiting the human body."Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source

Big bets 4

Larger plays that can change the trajectory.

  • 19

    Edgerun's field record is all in Ukraine, but its headquarters, D.C. office and SAM.gov registration point at US customers, and its Supply Chain Engineer post prefers experience qualifying US factories. The US Army has asked industry before for exoskeletons that meet specific load tasks.

    High impactHigh effort First result in 3 quarters Government Affairs Lead

    First action

    List three US units or labs that study soldier load and ask each what an evaluation would require.

    How to measure it

    US evaluation completed

    Now
    –
    Target
    1
    By
    3 quarters

    Steps

    1. 1

      Shortlist sponsors

      Units and labs that study load carriage.

      Government Affairs Lead (D.C. office) 1 month

    2. 2

      Agree the protocol

      Their task list and measures.

      Principal Engineer, Embedded Systems 1 month

    3. 3

      Prepare devices

      10-20 units, spares and training.

      Supply Chain Engineer 2 months

    4. 4

      Run it

      Field engineer on site.

      Senior Field Engineer (Kyiv) 2 months

    5. 5

      Report

      Independent, joint, published where allowed.

      Founder & CEO 1 month

    6. 6

      Follow on

      Next contract or wider trial.

      Government Affairs Lead (D.C. office) ongoing

    First result
    3 quarters
    Cost
    Devices, travel and staff; ideally funded through an R&D award
    Owner
    Government Affairs Lead (D.C. office)

    Smallest test

    A one-day demonstration with a US unit using the field engineer and five devices.

    Why it works

    Secure one US unit or Army research lab to run a structured evaluation against its own task list: agreed protocol, 10-20 devices, a field engineer on site, independent measurement and a joint report. Build the device and documentation to US expectations (US-made parts where it matters, training material, safety data).

    One US evaluation with an independent report changes the conversation with every other US buyer and is the usual step toward a program of record.

    Risks and how to handle them

    • Slow procurement cycles

      Run alongside allied evaluations so revenue doesn't wait on one buyer.

    Builds on

    Evidence

    • Public recordsSAM.gov registration: Edgerun Industries, Inc., active since June 5, 2026 (to June 5, 2027) for all awards, CAGE 198E0; primary NAICS 541715 (engineering R&D), also 333998, 336413, 336999, 339113 and 541330; a manufacturer of goods incorporated in Delaware.Source
    • HiringSupply Chain Engineer (Palo Alto): qualify partners for metal 3D printing, short-batch PCBA and CNC machining for prototypes, and build out production-scale factories for aluminum, titanium, mass CNC, SMT, composites and soft goods; qualifying US factories is preferred.Source
    • Industry researchJanes (March 2022): a US Army request for information on powered and unpowered exoskeletons listed tasks such as tactical movement carrying 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags and dragging a 270 lb casualty 45 ft, and asked for demonstrated safety, integration with clothing and mission equipment, energy efficiency and readiness information.Source
  • 20

    Edgerun's mission page says it will expand from soldier load carriage into energy, mining, construction, firefighting and rescue. Consumer rival Hypershell already lists a 'Rescue, Inspection, Security' use case. Wildland firefighters and mountain rescue teams also carry heavy loads over rough ground, and their procurement is often faster than defense procurement.

    High impactHigh effort First result in 2 quarters Founder & CEO

    First action

    Contact two wildland fire or rescue teams near Palo Alto about a 30-day trial.

    How to measure it

    Civil pilot reports

    Now
    –
    Target
    2
    By
    3 quarters

    Steps

    1. 1

      Pick the segment

      Wildland fire or mountain rescue.

      Founder & CEO 2 weeks

    2. 2

      Adapt the spec

      Civil loads, terrain and safety.

      Mechanical Engineer 1 month

    3. 3

      Check certification

      What civil safety standards apply.

      Electrical Engineer 1 month

    4. 4

      Run the pilot

      30-60 days with a field engineer.

      Senior Field Engineer (Kyiv) 2 months

    5. 5

      Publish

      Joint report and video.

      Founder & CEO 1 month

    6. 6

      Decide

      Product line or not.

      Founder & CEO 1 day

    First result
    2 quarters
    Cost
    Devices and staff time
    Owner
    Founder & CEO

    Smallest test

    One-day trial with a local rescue team on a training hike.

    Why it works

    Run one pilot with a firefighting or search-and-rescue team: the same device, a civil spec sheet, the mission-page task approach adapted to hose packs, rescue loads and ascent, and a joint report. Use it to test civil pricing and certification needs before committing to a product line.

    A civil customer diversifies revenue, gives publishable results without OPSEC limits and starts the dual-use path the mission already promises.

    Risks and how to handle them

    • Distraction from the core defense market

      Limit to one pilot until defense pilots are paid.

    Evidence

    • Your websiteMission page, "Upgrade the Human" by the founder and CEO (August 25, 2026): start with soldier load carriage, then expand into respiration, pressure and thermal control for energy, mining, construction, firefighting and rescue, then life support for space; the section heading is "The human is the bottleneck".Source
    • Competitor researchRivals' own homepages: Hypershell sells consumer hip exoskeletons at $999–$1,999 (about 2.5 kg each), says it is the only consumer exoskeleton brand certified by TÜV Rheinland and SGS, and lists a "Rescue, Inspection, Security" use case; Dephy sells the Sidekick, a powered ankle wearable, with a 60-second quiz and free consultation booking.Source
  • 21

    Edgerun's device has field-swappable batteries, OTA firmware updates and a field engineering team, and its hiring builds the telemetry and production base to support fleets. Each of those is a recurring need for any unit that adopts the device, yet the only offer today is the hardware.

    High impactHigh effort First result in 3 quarters Founder & CEO

    First action

    Estimate yearly wear parts, battery replacement and support hours per device from field data.

    How to measure it

    Share of fielded devices under contract

    Now
    –
    Target
    70%
    By
    4 quarters

    Steps

    1. 1

      Estimate wear

      Parts and batteries per device per year.

      Senior Field Engineer (Kyiv) 1 month

    2. 2

      Define tiers

      Parts only, or parts plus field support.

      Founder & CEO 2 weeks

    3. 3

      Plan supply

      Spares stock and lead times.

      Supply Chain Engineer 1 month

    4. 4

      Price

      Share of unit cost.

      Founder & CEO 1 week

    5. 5

      Bundle

      First year with pilot conversions.

      Government Affairs Lead (D.C. office) ongoing

    6. 6

      Report

      Telemetry reports under contract.

      Software Engineer monthly

    First result
    3 quarters
    Cost
    Spares inventory
    Owner
    Founder & CEO

    Smallest test

    Quote a sustainment add-on on the next pilot conversion.

    Why it works

    Design a per-device annual sustainment contract: spare batteries and wear parts, firmware updates, telemetry reports, field engineer visits and repair turnaround times. Price it as a share of unit cost and include the first year with every pilot conversion.

    Recurring sustainment revenue smooths lumpy hardware orders, and buyers value predictable support for new kit.

    Risks and how to handle them

    • Support costs exceed price

      Price from measured field wear, and review after two quarters.

    Builds on

    Evidence

    • HiringFounder's hiring post for principal engineers (YC S26): a wearable that reduces the effort of carrying heavy loads over distance, already with hardware on real users in the field; the software principal owns device-to-cloud telemetry, test and log databases, data pipelines and user applications, and firmware covers OTA updates; $200K–$250K salary plus equity, onsite in Palo Alto.Source
    • HiringSupply Chain Engineer (Palo Alto): qualify partners for metal 3D printing, short-batch PCBA and CNC machining for prototypes, and build out production-scale factories for aluminum, titanium, mass CNC, SMT, composites and soft goods; qualifying US factories is preferred.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 22

    Edgerun's 100+ field tests and published unit quote come from Ukraine, which is now one of the most watched places for combat-tested equipment. Allied defense ministries and units look for exactly this kind of field record, but Edgerun has no package to take it to them.

    High impactHigh effort First result in 3 quarters Founder & CEO

    First action

    Pick two allied countries and identify who evaluates soldier equipment in each.

    How to measure it

    Allied-country pilots

    Now
    –
    Target
    2
    By
    4 quarters

    Steps

    1. 1

      Pick countries

      Two with active soldier-load interest.

      Founder & CEO 2 weeks

    2. 2

      Check export rules

      What can be shipped and shared, with counsel.

      Government Affairs Lead (D.C. office) 1 month

    3. 3

      Build the kit

      Record, protocol, results, compatibility, offer.

      Government Affairs Lead (D.C. office) 1 month

    4. 4

      Translate

      Summaries in local languages.

      Founder & CEO 2 weeks

    5. 5

      Approach

      Evaluation offices and units.

      Founder & CEO 1 quarter

    6. 6

      Run pilots

      Paid pilot model with a field engineer.

      Senior Field Engineer (Kyiv) 2 quarters

    First result
    3 quarters
    Cost
    Travel, translation and legal review
    Owner
    Founder & CEO

    Smallest test

    Send the evaluation kit to one allied evaluation office.

    Why it works

    Build an allied evaluation kit: the field record (what can be shared), the test protocol and independent results, the kit compatibility list, a pilot offer and translated summaries. Pick two allied countries whose buyers are already evaluating soldier-load equipment and run the paid pilot model there.

    A combat-tested record travels well among allies, and the same paid-pilot package can be reused country by country.

    Risks and how to handle them

    • Export control limits

      Get counsel's view before any shipment or data sharing.

    Builds on

    Evidence

    • PressRuntime Wire: launched August 25, 2026; about 10 pounds; claims 30-45% less metabolic effort and 12 hours of runtime; more than 100 field tests with Ukrainian soldiers since May; Y Combinator-backed. The article frames the bet as whether lighter components can revive a military exoskeleton category that has struggled with weight, endurance and field reliability.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source

Wildcards 2

Unexpected experiments, each with a cheap way to test it.

  • 23

    Exoskeleton claims are hard to compare: Edgerun cites 30-45% less effort per step under load from internal data, while consumer makers like Hypershell lean on certifications and awards. Each uses its own conditions. The Army's request listed concrete tasks and loads, but there is no public, shared benchmark.

    Medium impactMedium effort First result in 2 quarters Principal Engineer

    First action

    Draft the benchmark from the test protocol in idea 7.

    How to measure it

    Labs or makers publishing benchmark results

    Now
    –
    Target
    3
    By
    4 quarters

    Steps

    1. 1

      Draft

      Loads, speeds, terrain, measures.

      Principal Engineer, Embedded Systems 1 month

    2. 2

      Review

      With an independent lab.

      Principal Engineer, Embedded Systems 1 month

    3. 3

      Run it

      Edgerun's own results.

      Senior Field Engineer (Kyiv) 1 month

    4. 4

      Publish

      Benchmark and results page.

      Software Engineer 1 week

    5. 5

      Invite

      Labs, makers and trade press.

      Founder & CEO 1 month

    6. 6

      Maintain

      Versioned updates.

      Principal Engineer, Embedded Systems yearly

    First result
    2 quarters
    Cost
    Engineering and lab time
    Owner
    Principal Engineer, Embedded Systems

    Smallest test

    Publish the protocol as 'v0.1' and ask two researchers for comments.

    Why it works

    Publish an open benchmark: standard loads, speeds, terrain, durations and measures, based on published military task lists, plus Edgerun's own results under it. Invite labs and other makers to run it. Host results on the site.

    Whoever defines the benchmark shapes how buyers compare products, and it earns links and citations from researchers and press.

    Risks and how to handle them

    • Seen as self-serving

      Co-author with an independent lab and publish all results.

    Builds on

    Evidence

    • Competitor researchRivals' own homepages: Hypershell sells consumer hip exoskeletons at $999–$1,999 (about 2.5 kg each), says it is the only consumer exoskeleton brand certified by TÜV Rheinland and SGS, and lists a "Rescue, Inspection, Security" use case; Dephy sells the Sidekick, a powered ankle wearable, with a 60-second quiz and free consultation booking.Source
    • Industry researchJanes (March 2022): a US Army request for information on powered and unpowered exoskeletons listed tasks such as tactical movement carrying 99-136 lb, bounding rushes with a 75-90 lb fighting load, filling sandbags and dragging a 270 lb casualty 45 ft, and asked for demonstrated safety, integration with clothing and mission equipment, energy efficiency and readiness information.Source
    • Your websiteHomepage: headline "MILITARY EXOSKELETONS"; specs "<10 lb" with batteries, "12+ hr" on "drone batteries, field-swappable", "30-45%*" assist ("less effort per step under load") and "<5 SEC" to put on, footnoted "Internal test data. Third-party verification underway."; missions ASSAULT, CASEVAC, ASCENT, PATROL and RESUPPLY; "Directly integrates with the kit you already wear"; offices in Palo Alto (headquarters), D.C. ("Government affairs") and Kyiv ("Field office"); a quote from the Head of Innovation Centre, 7th Rapid Response Corps, Ukrainian Air Assault Forces; integration partner Balistyka, a Kyiv body-armor maker founded in 2014; the only calls to action go to the Mission and Careers pages.Source
  • 24

    Edgerun's claim is about carrying load over distance, and its video channel and social presence are tiny. Consumer rival Hypershell sells hip exoskeletons to hikers and outdoor users directly. Veteran-led rucking events and long load marches gather the exact people who understand Edgerun's claim and who talk to serving soldiers.

    Medium impactMedium effort First result in 1 quarter Founder & CEO

    First action

    Find two veteran-led rucking events near Palo Alto in the next quarter.

    How to measure it

    Event trial participants

    Now
    –
    Target
    100
    By
    2 quarters

    Steps

    1. 1

      Pick events

      Two veteran-led rucking events.

      Founder & CEO 2 weeks

    2. 2

      Agree terms

      With organisers, including safety.

      Founder & CEO 2 weeks

    3. 3

      Prepare fleet

      Units, batteries and spares.

      Mechanical Engineer 1 week

    4. 4

      Run trials

      Measured stretch, with and without.

      Senior Field Engineer (Kyiv) per event

    5. 5

      Capture content

      Video and quotes with consent.

      Software Engineer per event

    6. 6

      Follow up

      Updates list and referrals to units.

      Government Affairs Lead (D.C. office) 1 week

    First result
    1 quarter
    Cost
    Travel and event fees
    Owner
    Founder & CEO

    Smallest test

    One local veteran group ruck with five devices.

    Why it works

    Bring a small fleet of units to two veteran-led rucking or load-march events: participants carry the same load with and without the device over a measured stretch, with heart rate and time recorded. Collect feedback and video with consent, and invite interested participants to the updates list.

    Veterans are credible messengers to units and procurement staff, and public trials produce content and word of mouth that a four-page site cannot.

    Risks and how to handle them

    • Device failure in public

      Bring spares and a field engineer; publish what happened either way.

    Builds on

    Evidence

    • Your channelsChannels: the YouTube channel has 21 subscribers, one video and 1,340 views; the site links X, Instagram and LinkedIn but has no blog, newsletter or news page.Source
    • Competitor researchRivals' own homepages: Hypershell sells consumer hip exoskeletons at $999–$1,999 (about 2.5 kg each), says it is the only consumer exoskeleton brand certified by TÜV Rheinland and SGS, and lists a "Rescue, Inspection, Security" use case; Dephy sells the Sidekick, a powered ankle wearable, with a 60-second quiz and free consultation booking.Source
    • PressExoskeleton Report (week 35 newsletter, August 30, 2026): an item titled "The 10 lb Military Exoskeleton" on a Y Combinator Summer 2026 company aiming to "add torque to every step under combat load"; the same issue covers consumer launches from Hypershell and others.Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

ProgrammableDigital

Show it, don't just describe it

These ideas need something to show: a demo, a video, an animation, graphics or a deck. Digital turns screenshots or the site into all of them, in the company's own brand.

Make a demo (opens programmable.digital in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Optro growth strategyThe GRC Intelligence Platform (formerly AuditBoard): software and AI agents for internal audit, SOX, risk, compliance, infosec…21 growth ideas
  • Landor growth strategyA global brand consultancy, part of WPP, covering strategy, design, experience, culture and brand performance, with sister companies amp…21 growth ideas
  • Addepar growth strategyA data and AI platform for investment professionals that unifies portfolio, market and client data, with reporting, alternatives…22 growth ideas
  • Brandlight growth strategyAn enterprise AI visibility platform that measures and improves how brands appear in AI answers, with impact tracking, content…21 growth ideas
  • Helios growth strategyHelios Intelligence is building an at-home blood test that reads more than 1,000 biomarkers from a single drop of blood, plus a model of…22 growth ideas
  • Sixtyfour growth strategyAI research that start from one identifier (an email, name, phone, username or company) and return source-cited findings on people and…24 growth ideas
  • OneCrew growth strategyAn all-in-one platform for paving contractors: CRM, mapping and estimating, proposals, scheduling, field management, job costing…21 growth ideas
  • Sofar Ocean growth strategyAn ocean intelligence company: the Spotter sensor network (buoys, Scout USV, A-Size floats), marine weather forecasts built on its own…23 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on November 10, 2026, and cites them throughout. Edgerun Industries did not commission, review or endorse it, and Programmable is not affiliated with Edgerun Industries. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Edgerun Industries runs its business.

Something wrong, or do you represent Edgerun Industries? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 306 ideas

    Open the front door: the evaluation request page, a capability statement, a press kit, an updates list, and fixes to the sitemap, navigation text and page weight.

  2. Days 31 to 6012 ideas

    Build proof evaluators trust: the test protocol, mission pages, kit and battery compatibility, the Balistyka integration, field video and reports, the US innovation-program pipeline, a paid pilot package, careers, the telemetry report and the trainer program.

  3. Days 61 to 906 ideas

    Commit to the big bets (a US unit evaluation, a rescue-and-industry pilot, sustainment contracts, allied-nation expansion) and test the two wildcards.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value built for the soldier, not the training ground. The most cited problem: loads keep getting heavier.

  • Light weight and fast to put on and take off
  • Fatigue and injury on long movements under load
  • In their words: “combat load”

Market

Competitive landscape

3 competitors compared: Hypershell, Dephy and Legacy defense exoskeleton programs.

  • Gap to exploit: A sub-10 lb powered exoskeleton with public, independent test data
  • Hypershell: Not built around military kit or combat loads
  • Dephy: Wellness focus, no military offer

Hiring signals

Every open role at Edgerun is engineering, supply chain or field work, which shows the move from prototype to production.

  • Supply Chain Engineer (Palo Alto): Production-scale factories and US supplier qualification. Ideas 15, 19, 21.
  • Principal Engineer, Embedded Systems (Palo Alto): Owns the core electronics; leads the test protocol and benchmark. Ideas 7, 23.
  • Software Engineer (Palo Alto): Device-to-cloud telemetry and user applications. Ideas 4, 5, 17.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks first (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence