ProgrammableMarketing/icminc.net (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 9
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Oct 21, 2026
  1. Programmable
  2. Playbooks
  3. ICM (Industrial Constructors/Managers, Inc.)
ICM (Industrial Constructors/Managers, Inc.) logo

growth playbook · Oct 21, 2026

icminc.net (opens in a new tab)

ICM (Industrial Constructors/Managers, Inc.) growth playbook

Diagnosis

ICM has 40+ years of industrial work, strong safety awards, a new Thornton shop and, since July, one of only three PCI precast erector certifications in Colorado.

Its site undersells all of it: precast is never mentioned outside a news post, data centers and mining have no pages, the projects page shows four items, news stories are duplicated, and the quote form cannot take a bid package.

It is hiring a Business Development Representative and estimators. This playbook puts precast on the site and in front of producers first, adds a bid upload, tidies the archive and address, then builds data center, project, safety and government proof for the new BDR, maintenance agreements and a regional push.

Growth Score

6/10

Biggest Opportunity

Turn the PCI certification and the Thornton shop into a visible precast plus steel offer for data centers, warehouses and public projects across Colorado, New Mexico and Arizona.

Biggest Risk

Competitors with clearer websites and easier bid intake get invited first, and the certification goes unnoticed by the agencies and producers who specify it.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Give the PCI certification a precast erection page, because buyers search for it and the site never says "precast"

    Write the page from the PCI announcement and add "Precast Erection" to the services menu.

    High impact First result in 1 month
  2. 2

    Call the precast producers who asked for a certified erector, and get on their lists

    Write the list of producers who contacted ICM about erection.

    High impact First result in 1 month
  3. 3

    Let GCs send a bid package from the website: plans upload, location and bid date on the quote form

    Add file upload and bid date fields to the existing Gravity Forms quote form.

    High impact First result in 2 weeks

02

Your idea portfolio

21 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 6 ideas are marked Unexpected: plays you are unlikely to have tried.

    2 of these are things Programmable can build and run for you.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 3Big bets · 7Fill-ins · 7Reconsider · 4
Effort →

Showing 21 of 21 ideas

This week 6

Quick wins with a clear first action.

  • 01

    ICM is one of only three PCI-certified precast erectors in Colorado, and its own announcement says public agencies and developers increasingly specify PCI-certified erectors and precast producers are already asking for them. But the homepage and services page never mention precast: the certification lives only in a July news post. An engineer, GC or precast plant searching "PCI certified erector Colorado" finds nothing from ICM to land on.

    High impactLow effort First result in 1 month Marketing Coordinator

    First action

    Write the page from the PCI announcement and add "Precast Erection" to the services menu.

    How to measure it

    Precast bid invites

    Now
    –
    Target
    10 in the first quarter
    By
    1 quarter

    Steps

    1. 1

      Draft the page

      Certification, scope, region, one-stop steel plus precast.

      Marketing Coordinator 2 days

    2. 2

      Add proof

      Crew experience, cranes, safety record and certifications.

      QA/QC Director 2 days

    3. 3

      Publish and link

      Services menu, homepage, What We Do and the PCI post.

      Website partner 1 day

    4. 4

      Title for search

      "PCI Certified Precast Erector in Colorado".

      Website partner 1 hour

    5. 5

      Send it out

      To precast producers and GCs who asked about erection.

      Business Development Representative 1 week

    6. 6

      Track

      Bid invites and calls that mention precast.

      Estimating Manager monthly

    First result
    1 month
    Cost
    $0 to $500
    Owner
    Marketing Coordinator

    Smallest test

    Add one paragraph and a menu link this week, then build the full page.

    Why it works

    Publish a "Precast & Prestressed Erection" service page and add it to the services menu: the PCI certification (one of three in Colorado), the categories ICM erects, the structural steel plus precast "one-stop" pitch, the region (Colorado, New Mexico, Arizona), crane and rigging capability, safety record and a "send us your bid package" button. Link it from the homepage slider and the PCI post, and add precast to the homepage and What We Do service lists.

    A certification only wins work when the people specifying it can find it. A dedicated page ranks for the exact term in bid specs, gives the new Business Development Representative something to send, and shows precast producers ICM is ready.

    Ready to use

    ChecklistPrecast erection page

    [ ] H1: PCI Certified Precast & Prestressed Erection
    [ ] "One of only three PCI-certified erectors in Colorado"
    [ ] Structure types: parking, warehouses, data centers, bridges, utilities
    [ ] Steel plus precast from one crew and one contract
    [ ] Region: Colorado, New Mexico, Arizona
    [ ] Safety awards and certifications (AISC, AWS, ASME S, NBIC R)
    [ ] Bid package upload button
    [ ] Link from services menu and homepage

    Risks and how to handle them

    • No precast project photos yet

      Use the certification audit and steel erection photos until the first job is done.

    • Overstating experience

      Describe what the certification covers and add projects as they finish.

    Evidence

    • Your websiteNews post, July 22, 2026: ICM earned Precast/Prestressed Concrete Institute (PCI) certification, "making it one of only three PCI-certified erectors in Colorado". It "opens the door" to transportation infrastructure, bridges, parking structures, warehouses, utility projects "and the rapidly expanding data center market", across Colorado, New Mexico and Arizona; "ICM has been approached by numerous precast concrete industry leaders regarding the growing need for certified erection companies", and "public agencies, municipalities and private developers increasingly specify PCI-certified erectors".Source
    • Your websiteHomepage and What We Do page (checked October 20, 2026): the services menu lists Steel Erection, Pipe Fabrication, Steel Fabrication, Plant Shutdown & Relocation, Equipment Installation, Millwright, Concrete, Process Piping and Pre-Engineered Metal Buildings ("ICM is an approved partner with Varco-Pruden"). The word "precast" does not appear on either page; the certification exists only as a news post.Source
    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
  • 02

    ICM's own PCI post says "numerous precast concrete industry leaders" approached it about the need for certified erection companies. Precast plants choose or recommend erectors on many jobs, so each producer relationship can bring a stream of bids.

    High impactLow effort First result in 1 month Business Development Represen…

    First action

    Write the list of producers who contacted ICM about erection.

    How to measure it

    Producer relationships

    Now
    –
    Target
    5 producers
    By
    1 quarter

    Steps

    1. 1

      Build the list

      Producers in CO, NM and AZ.

      Business Development Representative 3 days

    2. 2

      Check PCI listing

      Confirm ICM shows as a certified erector.

      QA/QC Director 1 day

    3. 3

      Make the sheet

      One page: certification, crews, cranes, region.

      Marketing Coordinator 2 days

    4. 4

      Call and visit

      Starting with producers who reached out.

      Business Development Representative 1 month

    5. 5

      Host a shop visit

      Thornton or Pueblo.

      President 1 day

    6. 6

      Log bids

      Producer-referred bids in the CRM or a sheet.

      Estimating Manager monthly

    First result
    1 month
    Cost
    Staff time and travel
    Owner
    Business Development Representative

    Smallest test

    Call three producers this week.

    Why it works

    List every precast producer serving Colorado, New Mexico and Arizona, starting with those who already approached ICM. Send the new precast page and a one-page capability sheet, ask to be added to their erector list, and offer a site visit to the Thornton or Pueblo shops. Make sure ICM appears in PCI's public list of certified erectors.

    Producers need certified erectors to sell their jobs, and there are only three in Colorado. Being their first call is the fastest way to turn the certificate into revenue.

    Risks and how to handle them

    • Producers already have favorites

      Offer to take overflow and short-notice jobs first.

    Evidence

    • Your websiteNews post, July 22, 2026: ICM earned Precast/Prestressed Concrete Institute (PCI) certification, "making it one of only three PCI-certified erectors in Colorado". It "opens the door" to transportation infrastructure, bridges, parking structures, warehouses, utility projects "and the rapidly expanding data center market", across Colorado, New Mexico and Arizona; "ICM has been approached by numerous precast concrete industry leaders regarding the growing need for certified erection companies", and "public agencies, municipalities and private developers increasingly specify PCI-certified erectors".Source
    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
    • News coverageDenver Business Journal (April 2026, reposted on ICM's site): ICM "has nearly doubled its footprint through a move to a new facility situated north of Denver"; Bisnow reported the Thornton site includes a 40,000-square-foot steel fabrication shop that also takes overflow from the Pueblo steel fabrication and pipefitting shops.Source
  • 03

    ICM's quote form asks only for name, email, a subject and a message. A competitor's homepage asks for "drawings, specs, addenda, location, and bid date" up front. Industrial and precast bids arrive as plan sets with deadlines; a form that cannot take them pushes estimators to email or another sub.

    High impactLow effort First result in 2 weeks Marketing Coordinator

    First action

    Add file upload and bid date fields to the existing Gravity Forms quote form.

    How to measure it

    Website bid packages

    Now
    –
    Target
    8 a month
    By
    1 quarter

    Steps

    1. 1

      Design fields

      Upload, location, bid date, scope boxes, source.

      Estimating Manager 1 day

    2. 2

      Build the form

      In the current form plugin.

      Website partner 1 day

    3. 3

      Route

      To estimating with an alert.

      Website partner 2 hours

    4. 4

      Auto-reply

      Confirms receipt and the reviewer.

      Estimating Manager 1 hour

    5. 5

      Link it

      Every "Get a Quote" button.

      Website partner 1 hour

    6. 6

      Review

      Bids by scope and source.

      Estimating Manager monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Marketing Coordinator

    Smallest test

    Add the upload field this week and watch the next ten requests.

    Why it works

    Add a "Request a Bid" form with file upload (or a link field for plan rooms), project location, bid date, scope checkboxes (steel, precast, piping, millwright, concrete, shutdown) and how they heard of ICM. Route it to the estimating team with an auto-reply that confirms who will review it and when.

    Making it easy to send a bid package is the cheapest way to get invited to more bids, and the scope boxes tell the estimating team where demand is coming from.

    Risks and how to handle them

    • Large files

      Accept plan-room links as well as uploads.

    Evidence

    • Your websiteContact page: the form asks for company, name, email, a subject (Quote Request, General Questions, Other) and a message, with no file upload, project location or bid date. Every page footer still says "We are moving! Our Denver office is moving to a new location" (471 E. 124th Ave., Thornton).Source
    • Competitor researchRivals' own homepages: Flawless Steel Welding (Denver, AISC certified, Ironworkers Local 24) asks visitors to "Send drawings, specs, addenda, location, and bid date" with "AI-assisted intake" and publishes "30-50 tons/week" shop throughput; Cutting Edge Steel (Dacono) sells itself as a "one stop solution for data center fabrication" (racks, server racks, skids).Source
    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
  • 04

    Every page footer still says the Denver office "is moving", although ICM announced the move north of Denver in April. Mixed addresses confuse map listings, bid systems and drivers delivering steel.

    Medium impactLow effort First result in 2 weeks Marketing Coordinator

    First action

    Delete the banner and update the Google Business Profile.

    How to measure it

    Listings updated

    Now
    –
    Target
    100%
    By
    1 month

    Steps

    1. 1

      Remove banner

      Show both offices.

      Website partner 1 hour

    2. 2

      Google profile

      Thornton address and photos of the new shop.

      Marketing Coordinator 1 day

    3. 3

      Social and directories

      LinkedIn, Facebook, AGC, AISC.

      Marketing Coordinator 1 day

    4. 4

      Bid platforms

      Update company profiles.

      Estimating Manager 1 day

    5. 5

      Structured data

      Both locations.

      Website partner 2 hours

    6. 6

      Check

      Search "ICM Thornton".

      Marketing Coordinator 1 week

    First result
    2 weeks
    Cost
    $0
    Owner
    Marketing Coordinator

    Smallest test

    Remove the banner today.

    Why it works

    Replace the banner with the two current addresses, update the Google Business Profile, LinkedIn, Facebook, SAM.gov, bid platforms and association directories to the Thornton address, and add LocalBusiness structured data for both offices.

    Consistent addresses help ICM show up in map searches near the new shop and avoid bounced deliveries and lost bid invitations.

    Risks and how to handle them

    • Old listings persist

      Recheck quarterly.

    Evidence

    • Your websiteContact page: the form asks for company, name, email, a subject (Quote Request, General Questions, Other) and a message, with no file upload, project location or bid date. Every page footer still says "We are moving! Our Denver office is moving to a new location" (471 E. 124th Ave., Thornton).Source
    • News coverageDenver Business Journal (April 2026, reposted on ICM's site): ICM "has nearly doubled its footprint through a move to a new facility situated north of Denver"; Bisnow reported the Thornton site includes a 40,000-square-foot steel fabrication shop that also takes overflow from the Pueblo steel fabrication and pipefitting shops.Source
    • Public recordsSAM.gov: Industrial Constructors/Managers, Inc. has an active registration for all awards (renewed July 2026, expires July 2027), Pueblo, CO, primary NAICS 236210 (industrial building construction) plus 236220, 237110, 237990, 238110, 238120 and 332312.Source
  • 05

    The Projects page shows four items, the newest from 2022, while the news archive covers the O'Hare baggage system with Daifuku, Denver International Airport Concourse A, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren AFB facility and the Pueblo Chemical Agent Destruction Pilot Plant. Owners and GCs judge a contractor by its project list.

    High impactMedium effort First result in 1 month Marketing Coordinator

    First action

    Pick the ten strongest projects from the news archive.

    How to measure it

    Project pages

    Now
    –
    Target
    10
    By
    1 quarter

    Steps

    1. 1

      Pick projects

      Ten across industries.

      President 1 day

    2. 2

      Collect facts

      Scope, trades, schedule, safety.

      Project Manager III 2 weeks

    3. 3

      Photos

      From project files.

      Project Manager III 2 weeks

    4. 4

      Write pages

      One per project.

      Marketing Coordinator 2 weeks

    5. 5

      Build the gallery

      Filters by industry and service.

      Website partner 1 week

    6. 6

      Cross-link

      From industry and service pages.

      Website partner 1 day

    First result
    1 month
    Cost
    Writing time
    Owner
    Marketing Coordinator

    Smallest test

    Publish the O'Hare project page first.

    Why it works

    Build a filterable project gallery (industry, service, location) with one page per notable project: client type, scope, trades self-performed, schedule, safety result and photos. Start with ten projects already covered in news posts and link each from the matching industry page.

    Project pages are the proof buyers ask for in prequalification, and they rank for searches like "baggage handling system installer" or "brewery equipment installation Colorado".

    Risks and how to handle them

    • Client confidentiality

      Use client names only where already public or approved.

    Evidence

    • Your websiteProjects page: four entries (a 2022 J.M. Smucker plant contract, the Molson Coors G150 facility, a Pueblo water project and an article on material price fluctuations). It says ICM is "a Union shop, multi-craft industrial, licensed general contractor" founded in 1983 that self-performs most major trades.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
  • 06

    ICM's news sitemap has 178 posts, but the Smucker contract appears under five URLs, the Molson Coors G150 facility under four, the 40-year anniversary under three and the "nation's safest" awards under six, many ending in "-2". Duplicates split search credit and make the archive look cluttered.

    Medium impactLow effort First result in 1 month Website partner

    First action

    List every duplicate group in a spreadsheet.

    How to measure it

    Duplicates removed

    Now
    –
    Target
    All groups
    By
    1 month

    Steps

    1. 1

      List groups

      By title and topic.

      Website partner 1 day

    2. 2

      Pick keepers

      Most complete version.

      Marketing Coordinator 1 day

    3. 3

      Redirect

      301 the rest.

      Website partner 1 day

    4. 4

      Tidy

      Dates and summaries.

      Marketing Coordinator 1 week

    5. 5

      Categorize

      Projects, awards, people, guidance.

      Website partner 2 days

    6. 6

      Resubmit sitemap

      In Search Console.

      Website partner 1 hour

    First result
    1 month
    Cost
    $0
    Owner
    Website partner

    Smallest test

    Merge the five Smucker posts this week.

    Why it works

    Keep the best version of each story, redirect the others to it, add dates and a short summary to every kept post, and group the archive by category (projects, awards, people, guidance).

    Cleaner archives rank better and make the strongest stories easier for buyers and AI assistants to find.

    Risks and how to handle them

    • Losing a link someone shared

      Redirects keep old links working.

    Evidence

    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source

This quarter 9

The core plays for the next three months.

  • 07

    ICM lists Electronics/Data Centers in its menu, but it only jumps to one sentence. Its PCI post names "the rapidly expanding data center market" as a target, the Thornton facility nearly doubled ICM's footprint, and a Dacono competitor markets itself as a "one stop solution for data center fabrication".

    High impactMedium effort First result in 1 quarter Business Development Represen…

    First action

    List five data center GCs building in Colorado and Arizona.

    How to measure it

    Data center bid invitations

    Now
    –
    Target
    6
    By
    2 quarters

    Steps

    1. 1

      Write the page

      Scopes, shops, safety.

      Marketing Coordinator 2 weeks

    2. 2

      Add proof

      Any electronics or raised-floor projects.

      Project Manager III 1 week

    3. 3

      Build the list

      GCs and developers.

      Business Development Representative 2 weeks

    4. 4

      Prequalify

      Submit to their vendor portals.

      Estimating Manager 1 month

    5. 5

      Meet

      Lunch-and-learns with GC preconstruction teams.

      Business Development Representative monthly

    6. 6

      Track

      Bids and wins.

      Estimating Manager monthly

    First result
    1 quarter
    Cost
    Staff time
    Owner
    Business Development Representative

    Smallest test

    Publish the page and send it to one GC.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Publish a data center page covering structural steel, precast erection, equipment setting, process and cooling piping, prefabricated skids and supports from the Thornton shop, and shutdown-free tie-ins. Then build a list of data center GCs and developers active on the Front Range and in Arizona for the BDR.

    Data centers combine every trade ICM self-performs, and owners favor contractors who can deliver several scopes with one safety program.

    Risks and how to handle them

    • Crowded market

      Lead with precast plus steel from one crew.

    Evidence

    • Your websitePage sitemap (28 pages): industry pages exist for aerospace, pharmaceutical, government, manufacturing, food and beverage, airports and baggage handling, energy and education. "Electronics/Data Centers", "Mining & Mineral" and "Pre-Engineered Metal Buildings" are menu items that jump to a short paragraph on /what-we-do; the data center text is one sentence ("heavy specialized rigging, raised floors, equipment installations, structural steel components").Source
    • Your websiteNews post, July 22, 2026: ICM earned Precast/Prestressed Concrete Institute (PCI) certification, "making it one of only three PCI-certified erectors in Colorado". It "opens the door" to transportation infrastructure, bridges, parking structures, warehouses, utility projects "and the rapidly expanding data center market", across Colorado, New Mexico and Arizona; "ICM has been approached by numerous precast concrete industry leaders regarding the growing need for certified erection companies", and "public agencies, municipalities and private developers increasingly specify PCI-certified erectors".Source
    • News coverageDenver Business Journal (April 2026, reposted on ICM's site): ICM "has nearly doubled its footprint through a move to a new facility situated north of Denver"; Bisnow reported the Thornton site includes a 40,000-square-foot steel fabrication shop that also takes overflow from the Pueblo steel fabrication and pipefitting shops.Source
    • Competitor researchRivals' own homepages: Flawless Steel Welding (Denver, AISC certified, Ironworkers Local 24) asks visitors to "Send drawings, specs, addenda, location, and bid date" with "AI-assisted intake" and publishes "30-50 tons/week" shop throughput; Cutting Edge Steel (Dacono) sells itself as a "one stop solution for data center fabrication" (racks, server racks, skids).Source
  • 08

    Mining & Mineral and Pre-Engineered Metal Buildings are menu items with no page of their own, though ICM is an approved Varco-Pruden partner and lists gold and molybdenum work. Every other industry has a page.

    Medium impactMedium effort First result in 1 quarter Marketing Coordinator

    First action

    Draft the Varco-Pruden page.

    How to measure it

    Leads from new pages

    Now
    –
    Target
    4 a quarter
    By
    2 quarters

    Steps

    1. 1

      Draft mining page

      Scopes and projects.

      Marketing Coordinator 1 week

    2. 2

      Draft metal buildings page

      Partnership and building types.

      Marketing Coordinator 1 week

    3. 3

      Review

      Operations check.

      Operations Manager 2 days

    4. 4

      Publish

      Update menu links.

      Website partner 1 day

    5. 5

      Ask Varco-Pruden

      To list ICM on its builder locator.

      Business Development Representative 2 weeks

    6. 6

      Measure

      Search impressions and leads.

      Website partner monthly

    First result
    1 quarter
    Cost
    Writing time
    Owner
    Marketing Coordinator

    Smallest test

    Publish the metal buildings page first.

    Why it works

    Write a mining page (heavy industrial steel, conveyors, crushing and screening installation, shutdowns) and a metal buildings page (Varco-Pruden partnership, design-build, typical building types), each with two projects and a quote button.

    Each page targets searches buyers actually run, such as "Varco-Pruden builder Colorado", and completes the menu.

    Risks and how to handle them

    • Thin pages

      Include real projects and photos.

    Evidence

    • Your websitePage sitemap (28 pages): industry pages exist for aerospace, pharmaceutical, government, manufacturing, food and beverage, airports and baggage handling, energy and education. "Electronics/Data Centers", "Mining & Mineral" and "Pre-Engineered Metal Buildings" are menu items that jump to a short paragraph on /what-we-do; the data center text is one sentence ("heavy specialized rigging, raised floors, equipment installations, structural steel components").Source
    • Your websiteHomepage and What We Do page (checked October 20, 2026): the services menu lists Steel Erection, Pipe Fabrication, Steel Fabrication, Plant Shutdown & Relocation, Equipment Installation, Millwright, Concrete, Process Piping and Pre-Engineered Metal Buildings ("ICM is an approved partner with Varco-Pruden"). The word "precast" does not appear on either page; the certification exists only as a news post.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
  • 09

    Google's test scores the homepage 47 on mobile and 22 on desktop, with 1 second of blocking time on desktop and 4.2 MB downloaded. Real visitors' loading time is 2.52s, just over Google's 2.5s limit, so a modest fix moves it into "good".

    Medium impactMedium effort First result in 1 month Website partner

    First action

    Run the PageSpeed report and list the unused scripts.

    How to measure it

    LCP at the 75th percentile

    Now
    –
    Target
    Under 2.5s
    By
    2 months

    Steps

    1. 1

      Audit scripts

      Which pages use what.

      Website partner 1 day

    2. 2

      Remove unused

      Slider and plugin scripts.

      Website partner 2 days

    3. 3

      Delay tags

      Analytics after interaction.

      Website partner 1 day

    4. 4

      Images

      Compress and resize hero images.

      Website partner 1 day

    5. 5

      Retest

      PageSpeed lab and field.

      Website partner weekly

    6. 6

      Monitor

      Search Console Core Web Vitals.

      Website partner monthly

    First result
    1 month
    Cost
    Website partner time
    Owner
    Website partner

    Smallest test

    Remove one unused library and retest.

    Why it works

    Remove unused slider and script libraries, delay the tag manager and fonts, compress the hero images and load only the scripts each page uses. Retest after each change.

    Faster pages help on the job site and in search, and a fix this small brings real visitors under Google's limit.

    Risks and how to handle them

    • Breaking a page

      Test on staging first.

    Evidence

    • Google PageSpeedHomepage: mobile score 47 and desktop 22. In the lab the main content takes 17.5s to appear on a phone and 3.2s on desktop, with 1,009 ms of blocking time on desktop; the page downloads 4.2 MB, including 832 KB of unused JavaScript (about 5.9s of savings) and 1,081 KB from Google's CDN. Real visitors: loading at the 75th percentile is 2.52s, just over Google's 2.5s "good" limit; responsiveness (54 ms) and layout (0.01) are good. The homepage has no social share image.Source
  • 10

    The homepage has no social share image, so links shared on LinkedIn and Facebook show a blank or random preview. ICM's news is exactly the kind of content GCs and recruits see on LinkedIn.

    Medium impactLow effort First result in 2 weeks Marketing Coordinator

    First action

    Upload a default share image in the SEO plugin.

    How to measure it

    Social clicks

    Now
    –
    Target
    +30%
    By
    1 quarter

    Steps

    1. 1

      Pick images

      Crew and shop photos.

      Marketing Coordinator 1 day

    2. 2

      Set default

      In the SEO plugin.

      Website partner 1 hour

    3. 3

      Post images

      Top 30 posts.

      Marketing Coordinator 1 week

    4. 4

      Check previews

      LinkedIn post inspector.

      Marketing Coordinator 1 hour

    5. 5

      Post weekly

      One project or people story.

      Marketing Coordinator weekly

    6. 6

      Measure

      Clicks per post.

      Marketing Coordinator monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Marketing Coordinator

    Smallest test

    Set the default image today.

    Why it works

    Set a default share image (shop or crew photo with logo), add a featured image to each news and project post, and check previews before posting.

    Good previews get more clicks for the same posts, for buyers and for job seekers.

    Risks and how to handle them

    • Low-quality photos

      Take ten new shop photos.

    Evidence

    • Google PageSpeedHomepage: mobile score 47 and desktop 22. In the lab the main content takes 17.5s to appear on a phone and 3.2s on desktop, with 1,009 ms of blocking time on desktop; the page downloads 4.2 MB, including 832 KB of unused JavaScript (about 5.9s of savings) and 1,081 KB from Google's CDN. Real visitors: loading at the 75th percentile is 2.52s, just over Google's 2.5s "good" limit; responsiveness (54 ms) and layout (0.01) are good. The homepage has no social share image.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
  • 11

    ICM is hiring a Business Development Representative in Pueblo, plus an Estimating Manager and a Steel Fabrication Estimator in Thornton. New sellers ramp faster with a defined list, a story and a way to measure meetings.

    High impactMedium effort First result in 1 quarter Business Development Represen…

    First action

    Write the first list of 50 plants within 100 miles of Pueblo and Thornton.

    How to measure it

    BDR meetings

    Now
    –
    Target
    12 a month
    By
    2 quarters

    Steps

    1. 1

      Build lists

      Three segments.

      Business Development Representative 2 weeks

    2. 2

      Write scripts

      One per segment.

      President 1 week

    3. 3

      Link proof

      Project and service pages.

      Marketing Coordinator 1 week

    4. 4

      Set targets

      Calls, meetings, bids.

      President 1 day

    5. 5

      Run

      Weekly cadence.

      Business Development Representative weekly

    6. 6

      Review

      Bid invites from outreach.

      Estimating Manager monthly

    First result
    1 quarter
    Cost
    Salary already budgeted
    Owner
    Business Development Representative

    Smallest test

    Book five plant visits in the first month.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Define three target lists: plant and maintenance managers at Front Range manufacturers, breweries, food plants and mines; precast producers and GCs for precast and steel; and federal and airport facility teams. Give each a short email and call script tied to a project page, and track meetings and bid invites.

    A focused list beats a general pitch, and linking each list to proof pages makes the first conversation easier.

    Risks and how to handle them

    • Too broad

      Start with one segment.

    Evidence

    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
    • Your websiteNews post, July 22, 2026: ICM earned Precast/Prestressed Concrete Institute (PCI) certification, "making it one of only three PCI-certified erectors in Colorado". It "opens the door" to transportation infrastructure, bridges, parking structures, warehouses, utility projects "and the rapidly expanding data center market", across Colorado, New Mexico and Arizona; "ICM has been approached by numerous precast concrete industry leaders regarding the growing need for certified erection companies", and "public agencies, municipalities and private developers increasingly specify PCI-certified erectors".Source
  • 12

    ICM's homepage mentions on-call airport maintenance and supplemental plant maintenance, and its millwrights keep conveyors, turbines and baggage systems running. Plants that hired ICM once for a project often need help every month.

    High impactMedium effort First result in 1 quarter Operations Manager

    First action

    List clients with work in the last three years.

    How to measure it

    Agreements

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      List clients

      Last three years.

      Operations Manager 1 week

    2. 2

      Design tiers

      Hours, response, inspections.

      Operations Manager 2 weeks

    3. 3

      Price

      Margin and crew availability.

      Estimating Manager 1 week

    4. 4

      Pitch

      In person to plant managers.

      Business Development Representative 1 quarter

    5. 5

      Deliver

      Monthly reports to the client.

      Project Manager III monthly

    6. 6

      Renew

      Review at month 10.

      Operations Manager yearly

    First result
    1 quarter
    Cost
    Staff time
    Owner
    Operations Manager

    Smallest test

    Offer one agreement to a brewery or food plant client.

    Why it works

    Package a maintenance agreement: priority response, a set number of crew hours, planned shutdown support, and quarterly inspections. Offer it to past project clients first and track renewal.

    Recurring work smooths crew schedules between big projects and keeps ICM inside the fence when the next capital project comes up.

    Risks and how to handle them

    • Crews pulled to big projects

      Reserve a small maintenance crew.

    Evidence

    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
    • Your websiteExisting guidance posts include "How to prepare for planned and unplanned outages", "Benefits of outsourced repairs", "How prefabrication benefits contractors more than ever before" and "Tips for building a younger talent pipeline"; the president partners with Careers in Construction Colorado.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
  • 13

    ICM has an active SAM.gov registration with seven NAICS codes, a Government industry page, and news on the Cheyenne Mountain Space Force Station, F.E. Warren AFB and the Pueblo Chemical Agent Destruction Pilot Plant. Federal buyers and primes look for a one-page capability statement.

    Medium impactMedium effort First result in 1 quarter Estimating Manager

    First action

    Draft the capability statement from SAM.gov data and news posts.

    How to measure it

    Federal invitations

    Now
    –
    Target
    4 a quarter
    By
    2 quarters

    Steps

    1. 1

      Gather data

      SAM, NAICS, certifications.

      Estimating Manager 2 days

    2. 2

      Write

      One page.

      Marketing Coordinator 2 days

    3. 3

      Publish

      Government page PDF.

      Website partner 1 hour

    4. 4

      Send

      Primes and base facility teams.

      Business Development Representative 1 month

    5. 5

      Attend

      Industry days.

      Business Development Representative quarterly

    6. 6

      Track

      Invitations and awards.

      Estimating Manager quarterly

    First result
    1 quarter
    Cost
    Staff time
    Owner
    Estimating Manager

    Smallest test

    Publish the statement on the Government page.

    Why it works

    Write a capability statement (NAICS codes, CAGE, certifications, safety, past federal projects), publish it on the Government page as a PDF, and send it to the primes and base facility teams in the region.

    Primes and contracting officers shortlist subcontractors from capability statements and past performance; ICM already has both.

    Risks and how to handle them

    • Controlled information

      Only include public project details.

    Evidence

    • Public recordsSAM.gov: Industrial Constructors/Managers, Inc. has an active registration for all awards (renewed July 2026, expires July 2027), Pueblo, CO, primary NAICS 236210 (industrial building construction) plus 236220, 237110, 237990, 238110, 238120 and 332312.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
  • 14

    ICM has won AGC safety awards for several years and the new Safety Manager role is open. Owners and GCs ask for EMR, recordable rates and programs in every prequalification form.

    Medium impactLow effort First result in 1 month Safety Manager

    First action

    Gather the last three years of EMR and recordable rates.

    How to measure it

    Prequal packet requests

    Now
    –
    Target
    10 a quarter
    By
    2 quarters

    Steps

    1. 1

      Gather data

      Three years.

      Safety Manager 1 week

    2. 2

      Write page

      Numbers, awards, programs.

      Marketing Coordinator 1 week

    3. 3

      Packet

      Downloadable PDF.

      Marketing Coordinator 2 days

    4. 4

      Publish

      Link from homepage.

      Website partner 1 hour

    5. 5

      Use in bids

      Attach to every bid.

      Estimating Manager ongoing

    6. 6

      Update

      Yearly.

      Safety Manager yearly

    First result
    1 month
    Cost
    $0
    Owner
    Safety Manager

    Smallest test

    Add EMR to the existing safety section.

    Why it works

    Create a safety page with the current EMR, recordable and lost-time rates, years of awards, training programs and the accident-prevention policy, plus a downloadable safety packet.

    Answering prequalification questions before they are asked shortens the vendor approval process.

    Risks and how to handle them

    • A bad year

      Show the trend and the actions taken.

    Evidence

    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
  • 15

    ICM is hiring carpenters and project managers, has a careers page that sends applicants to Indeed, and the president partners with Careers in Construction Colorado. The skilled labor shortage is a growth limit for every industrial contractor.

    Medium impactMedium effort First result in 1 quarter HR Manager

    First action

    Write the carpenter page for the open roles.

    How to measure it

    Applications per opening

    Now
    –
    Target
    +50%
    By
    2 quarters

    Steps

    1. 1

      Craft pages

      Four trades.

      HR Manager 1 month

    2. 2

      Crew stories

      Short videos.

      Marketing Coordinator 1 month

    3. 3

      Apprenticeship

      Union routes explained.

      HR Manager 2 weeks

    4. 4

      School outreach

      With Careers in Construction Colorado.

      President quarterly

    5. 5

      Track

      Applicants by source.

      HR Manager monthly

    6. 6

      Improve

      Update pages with questions asked.

      HR Manager quarterly

    First result
    1 quarter
    Cost
    Staff time
    Owner
    HR Manager

    Smallest test

    Publish the carpenter page.

    Why it works

    Add one page per craft (ironworker, pipefitter, millwright, carpenter) with pay ranges, union apprenticeship routes, a day-in-the-field story and an apply button; promote it at schools and through Careers in Construction Colorado.

    Crews are capacity, and a contractor that recruits well can bid more work.

    Risks and how to handle them

    • Union rules

      Describe routes accurately with the locals.

    Evidence

    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
    • Your websiteExisting guidance posts include "How to prepare for planned and unplanned outages", "Benefits of outsourced repairs", "How prefabrication benefits contractors more than ever before" and "Tips for building a younger talent pipeline"; the president partners with Careers in Construction Colorado.Source

Big bets 3

Larger plays that can change the trajectory.

  • 16

    The PCI post names Colorado, New Mexico and Arizona as the precast market ICM can now pursue, and ICM already has published experience on Arizona tribal lands. Few contractors offer certified precast erection and steel together.

    High impactHigh effort First result in 3 quarters President

    First action

    Pick the two metros with the most precast work.

    How to measure it

    Regional wins

    Now
    –
    Target
    2
    By
    4 quarters

    Steps

    1. 1

      Size markets

      Precast and steel bid volume.

      Estimating Manager 1 month

    2. 2

      Register

      Agencies and GC portals.

      Estimating Manager 1 month

    3. 3

      Region pages

      Two metros.

      Marketing Coordinator 2 weeks

    4. 4

      Assign estimator

      Regional bids.

      Estimating Manager 1 quarter

    5. 5

      Bid five jobs

      Precast or steel.

      Estimating Manager 2 quarters

    6. 6

      Decide

      Crew base or travel crews.

      President 1 month

    First result
    3 quarters
    Cost
    Travel and estimating time
    Owner
    President

    Smallest test

    Bid one Arizona precast job.

    Why it works

    Pick two target metros, register with their public agencies and largest GCs, publish region pages, hire or assign one estimator to the region, and bid five precast or steel jobs before committing a crew base.

    A distinctive offer travels better than general industrial work, and the certification is the reason to be considered.

    Risks and how to handle them

    • Thin margins away from home

      Bid only where travel costs are covered.

    Evidence

    • Your websiteNews post, July 22, 2026: ICM earned Precast/Prestressed Concrete Institute (PCI) certification, "making it one of only three PCI-certified erectors in Colorado". It "opens the door" to transportation infrastructure, bridges, parking structures, warehouses, utility projects "and the rapidly expanding data center market", across Colorado, New Mexico and Arizona; "ICM has been approached by numerous precast concrete industry leaders regarding the growing need for certified erection companies", and "public agencies, municipalities and private developers increasingly specify PCI-certified erectors".Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
    • Your websiteCareers page, "Current Openings": Pueblo: Project Manager III, Safety Manager, Business Development Representative; Thornton: Project Manager II, Project Manager III, Steel Fabrication Estimator, Estimating Manager, Carpenter Journeyman, Carpenter Foreman. Each links to an Indeed post.Source
  • 17

    ICM's pipe and steel shops prefabricate assemblies, skids and spools, and the new Thornton shop added a 40,000-square-foot fabrication space. Data center, pharmaceutical and food plants want modules that arrive ready to set.

    High impactHigh effort First result in 3 quarters Operations Manager

    First action

    List the five assemblies the shops built most often.

    How to measure it

    Third-party shop orders

    Now
    –
    Target
    10% of shop hours
    By
    4 quarters

    Steps

    1. 1

      List assemblies

      Most frequent five.

      Operations Manager 2 weeks

    2. 2

      Standardize

      Drawings and lead times.

      Steel Fabrication Estimator 1 quarter

    3. 3

      Catalog page

      With quote form.

      Marketing Coordinator 1 month

    4. 4

      Sell

      To mechanical contractors.

      Business Development Representative 2 quarters

    5. 5

      Capacity plan

      Shop schedule.

      Operations Manager monthly

    6. 6

      Review

      Margins.

      Estimating Manager quarterly

    First result
    3 quarters
    Cost
    Engineering time
    Owner
    Operations Manager

    Smallest test

    Quote one skid package to a mechanical contractor.

    Why it works

    Define a small catalog of standard prefabricated products (pipe racks, pump skids, equipment platforms, cable tray supports) with lead times and a quote form, and sell them to GCs and mechanical contractors who do not have shops.

    Products sell beyond the projects ICM erects itself and keep the shops full between big jobs.

    Risks and how to handle them

    • Shop overload

      Cap third-party hours.

    Evidence

    • News coverageDenver Business Journal (April 2026, reposted on ICM's site): ICM "has nearly doubled its footprint through a move to a new facility situated north of Denver"; Bisnow reported the Thornton site includes a 40,000-square-foot steel fabrication shop that also takes overflow from the Pueblo steel fabrication and pipefitting shops.Source
    • Your websiteExisting guidance posts include "How to prepare for planned and unplanned outages", "Benefits of outsourced repairs", "How prefabrication benefits contractors more than ever before" and "Tips for building a younger talent pipeline"; the president partners with Careers in Construction Colorado.Source
    • Your websitePage sitemap (28 pages): industry pages exist for aerospace, pharmaceutical, government, manufacturing, food and beverage, airports and baggage handling, energy and education. "Electronics/Data Centers", "Mining & Mineral" and "Pre-Engineered Metal Buildings" are menu items that jump to a short paragraph on /what-we-do; the data center text is one sentence ("heavy specialized rigging, raised floors, equipment installations, structural steel components").Source
  • 18

    ICM has written about price fluctuations, outages and prefabrication, ranks among western specialty contractors, and its leaders appear on business power lists. A yearly outlook gives the BDR and president a reason to meet owners.

    High impactMedium effort First result in 3 quarters President

    First action

    Pick five questions plant managers ask most.

    How to measure it

    Outlook breakfast attendees

    Now
    –
    Target
    60
    By
    3 quarters

    Steps

    1. 1

      Pick questions

      Five.

      President 1 week

    2. 2

      Pull data

      Bids and costs.

      Estimating Manager 1 month

    3. 3

      Write

      Short report.

      Marketing Coordinator 1 month

    4. 4

      Event

      Breakfast in Denver and Pueblo.

      Business Development Representative 1 month

    5. 5

      Press

      Business journals.

      Marketing Coordinator 2 weeks

    6. 6

      Follow up

      Meetings with attendees.

      Business Development Representative ongoing

    First result
    3 quarters
    Cost
    Event costs
    Owner
    President

    Smallest test

    Write a one-page version for the newsletter.

    Why it works

    Publish a short annual report: steel and labor price trends, which industries are building, shutdown timing, prefab adoption and safety lessons, from ICM's bid data. Present it at a breakfast for plant managers and GCs.

    Original, local data earns press and invitations and positions ICM as the contractor that understands the market.

    Risks and how to handle them

    • Revealing pricing

      Use ranges and trends.

    Evidence

    • Your websiteExisting guidance posts include "How to prepare for planned and unplanned outages", "Benefits of outsourced repairs", "How prefabrication benefits contractors more than ever before" and "Tips for building a younger talent pipeline"; the president partners with Careers in Construction Colorado.Source
    • Your websiteNews sitemap: 178 posts. Many stories appear under several URLs: five for the J.M. Smucker contract, four for the Molson Coors G150 facility, three for the 40-year anniversary, six for "nation's safest construction companies", several ending in "-2". Project stories include the O'Hare baggage system upgrade with Daifuku, the Denver International Airport Concourse A baggage system, the Cheyenne Mountain Space Force Station chilled water line, an F.E. Warren Air Force Base helicopter facility, the Pueblo Chemical Agent Destruction Pilot Plant and an Evraz car shredder overhaul; rankings include ENR Top 600 specialty contractors.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 19

    ICM already wrote "How to prepare for planned and unplanned outages" and sells multi-trade shutdown support. Plant managers plan shutdowns months ahead and look for checklists.

    Medium impactLow effort First result in 1 quarter Marketing Coordinator

    First action

    Turn the post into a one-page checklist.

    How to measure it

    Downloads

    Now
    –
    Target
    50
    By
    2 quarters

    Steps

    1. 1

      Write checklist

      From the post.

      Operations Manager 1 week

    2. 2

      Design

      Printable PDF.

      Marketing Coordinator 1 week

    3. 3

      Offer

      On the shutdown page.

      Website partner 1 day

    4. 4

      Promote

      Newsletter and LinkedIn.

      Marketing Coordinator monthly

    5. 5

      Follow up

      Planning calls.

      Business Development Representative ongoing

    6. 6

      Measure

      Downloads to bids.

      Estimating Manager quarterly

    First result
    1 quarter
    Cost
    $0
    Owner
    Marketing Coordinator

    Smallest test

    Publish the checklist as a page first.

    Why it works

    Make a printable shutdown planning checklist and timeline, offer it on the shutdown page in exchange for an email, and follow up with a planning call before each plant's shutdown season.

    It reaches plant managers before they pick a contractor, which is when ICM should be in the conversation.

    Risks and how to handle them

    • Few downloads

      Hand it out at plant visits too.

    Evidence

    • Your websiteExisting guidance posts include "How to prepare for planned and unplanned outages", "Benefits of outsourced repairs", "How prefabrication benefits contractors more than ever before" and "Tips for building a younger talent pipeline"; the president partners with Careers in Construction Colorado.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source
  • 20

    icminc.net's email policy is set to monitor only (DMARC "p=none"), so messages pretending to come from ICM are not blocked. Construction firms are common targets for fake invoice and payment-change emails sent to clients and suppliers.

    Medium impactLow effort First result in 1 month IT Manager

    First action

    Turn on DMARC reporting and review a month of reports.

    How to measure it

    Policy

    Now
    –
    Target
    Quarantine or reject
    By
    2 months

    Steps

    1. 1

      Collect reports

      One month.

      IT Manager 1 month

    2. 2

      List senders

      Email, newsletter, forms.

      IT Manager 1 week

    3. 3

      Fix records

      Authorize senders.

      IT Manager 1 week

    4. 4

      Quarantine

      Then monitor.

      IT Manager 1 month

    5. 5

      Reject

      When clean.

      IT Manager 1 day

    6. 6

      Tell clients

      Payment-change process.

      Controller 1 week

    First result
    1 month
    Cost
    $0
    Owner
    IT Manager

    Smallest test

    Review the current DNS records.

    Why it works

    Review the DMARC reports, make sure every service that sends as icminc.net is authorized, then move the policy to quarantine and later reject. Tell clients and suppliers how ICM confirms payment changes.

    It protects clients' trust and ICM's cash, and it improves delivery of bids and newsletters.

    Risks and how to handle them

    • Blocking real email

      Move step by step with reports.

    Evidence

    • DNS checkicminc.net publishes an SPF record ending "~all" and a DMARC policy of "p=none" (monitoring only).Source
  • 21

    Buyers now ask AI assistants questions such as "Who are PCI-certified precast erectors in Colorado?" or "Who installs baggage handling systems in Denver?". Assistants answer from pages that state the facts clearly.

    Medium impactLow effort First result in 1 quarter Marketing Coordinator

    First action

    Ask three assistants about PCI erectors in Colorado and note the answers.

    How to measure it

    Assistant answers naming ICM

    Now
    –
    Target
    3 of 5 test questions
    By
    2 quarters

    Steps

    1. 1

      Test questions

      Five buyer questions.

      Marketing Coordinator 1 day

    2. 2

      Write FAQs

      Service and industry pages.

      Marketing Coordinator 2 weeks

    3. 3

      Company facts

      One consistent block.

      Marketing Coordinator 1 day

    4. 4

      Structured data

      Organization and services.

      Website partner 1 day

    5. 5

      Retest

      Monthly.

      Marketing Coordinator monthly

    6. 6

      Update

      New certifications and projects.

      Marketing Coordinator quarterly

    First result
    1 quarter
    Cost
    $0
    Owner
    Marketing Coordinator

    Smallest test

    Add an FAQ to the new precast page.

    Why it works

    Add a short FAQ to each service and industry page (certifications, region, crew size, union status, typical project size), use consistent company facts on every page, and check monthly what assistants say about ICM.

    Clear, consistent facts make ICM easier to recommend, by people and by assistants.

    Risks and how to handle them

    • Answers change often

      Track trends, not single answers.

    Evidence

    • Your websiteNews post, July 22, 2026: ICM earned Precast/Prestressed Concrete Institute (PCI) certification, "making it one of only three PCI-certified erectors in Colorado". It "opens the door" to transportation infrastructure, bridges, parking structures, warehouses, utility projects "and the rapidly expanding data center market", across Colorado, New Mexico and Arizona; "ICM has been approached by numerous precast concrete industry leaders regarding the growing need for certified erection companies", and "public agencies, municipalities and private developers increasingly specify PCI-certified erectors".Source
    • Your websiteProjects page: four entries (a 2022 J.M. Smucker plant contract, the Molson Coors G150 facility, a Pueblo water project and an article on material price fluctuations). It says ICM is "a Union shop, multi-craft industrial, licensed general contractor" founded in 1983 that self-performs most major trades.Source
    • Your websiteHomepage: aerospace clients "like Collins Aerospace, Lockheed Martin"; airport work "to on-call maintenance"; government work "from military bases, state agencies, local agencies to indigenous tribes"; offices in Pueblo and Thornton; a Mailchimp newsletter signup on every page. Credentials named in the PCI post: AWS, AISC, NBIC R stamp and ASME S stamp.Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

Have it built

ProgrammableAgency

2 of the 21 ideas are things Programmable builds and runs for its customers: pages, outreach, prospect lists, booking flows and monitors. Pick one, or send the whole list.

Prospect lists2The list compiled from public sources, verified, deduplicated and delivered to your CRM.

A 30-minute session with the engineer who would build it, not a sales call. You leave with a plan whether or not you hire us.

Book a working session

Usually live within days.

Tools for the rest

ProgrammableInfo

Turn the research into a list you can act on

These ideas start with finding the right companies. Info finds them and the right person at each, researches every one and drafts the outreach, then asks before it sends.

  • Build this list in Info for idea #11 (opens programmable.info in a new tab)

New accounts: 100,000 free credits with code BETA100K

Find the companies (opens programmable.info in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Zipline growth strategyDesigns, builds and operates autonomous drone delivery: food, groceries, retail and medical deliveries in minutes through the Zipline app…23 growth ideas
  • Dovetail growth strategyAn AI customer intelligence platform that turns sales calls, support tickets, surveys and user interviews into structured, cited customer…21 growth ideas
  • Virta Health growth strategyA virtual clinic for type 2 diabetes, prediabetes and obesity that combines personalized nutrition, health coaching and provider-led care…21 growth ideas
  • Simon Pearce growth strategyHandblown glass and handmade pottery from Vermont and Maryland workshops: glassware, tableware, lighting, decor and gifts, with engraving…21 growth ideas
  • Verse Medical growth strategyAn AI-enabled DME supplier and ordering platform: clinicians order equipment and supplies online (with details extracted from the medical…20 growth ideas
  • Albemarle growth strategyA global specialty chemicals company producing lithium compounds for batteries (Energy Storage), bromine flame retardants, amines and…21 growth ideas
  • Bestyfit growth strategyA Canadian online boutique, founded by Caro, selling Colombian-made compression leggings, sports bras and swimwear, mainly from the brands…21 growth ideas
  • Eli Health growth strategyMakes the Hormometer, a saliva test read by a phone app that shows cortisol levels in 20 minutes, with progesterone and testosterone tests…24 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on October 21, 2026, and cites them throughout. ICM (Industrial Constructors/Managers, Inc.) did not commission, review or endorse it, and Programmable is not affiliated with ICM (Industrial Constructors/Managers, Inc.). Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how ICM (Industrial Constructors/Managers, Inc.) runs its business.

Something wrong, or do you represent ICM (Industrial Constructors/Managers, Inc.)? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    Precast page, producer calls, bid upload form, address cleanup, projects portfolio and duplicate merge; start the AI-assistant FAQ.

  2. Days 31 to 6011 ideas

    Data center, mining and metal building pages, speed, share images, BDR targets, maintenance agreements, government statement, safety and careers pages; the shutdown checklist and email protection.

  3. Days 61 to 903 ideas

    Commit to New Mexico and Arizona, prefabricated products and the yearly outlook.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value A strong safety culture and record. The most cited problem: downtime during shutdowns and installs.

  • Self-performed trades under one contract
  • Finding qualified, safe crews
  • In their words: “inside the fence”

Market

Competitive landscape

3 competitors compared: Flawless Steel Welding, Cutting Edge Steel and Other PCI-certified erectors in Colorado.

  • Gap to exploit: Steel plus precast from one certified contractor
  • Flawless Steel Welding: Commercial steel only, no multi-craft plant work
  • Cutting Edge Steel: Fabrication without erection or plant trades

Hiring signals

ICM is building its selling and bidding capacity: a Business Development Representative in Pueblo (ideas 2, 11, 16), an Estimating Manager and a Steel Fabrication Estimator in Thornton (ideas 3, 7, 17), project…

  • Business Development Representative (Pueblo): A dedicated seller to fill the pipeline. Ideas 2, 11.
  • Estimating Manager (Thornton): More bids to price. Ideas 3, 7.
  • Steel Fabrication Estimator (Thornton): Shop work from the new Thornton facility. Idea 17.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks firstNew accounts get 100,000 free enrichment credits with code BETA100K (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammableMediaAn AI note taker, interpreter and webinar host for your calls (opens programmable.media in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence