The homepage and the Get Rid of Spreadsheets campaign page both promise "2,000+ hours saved per person per year". That is more than a full-time working year, and the campaign page also says "40 hours saved per team per month", which is the Luton Airport result. The other numbers clash across the site. Average savings are "£10k+" on the homepage, "£500K" on the monday.com page and "£2M+" in total across 50+ implementations on the case studies page, which is about £40k each. ROI is "300% in year one" or "90 Days to Full ROI", implementation takes "6 weeks" or "6–8 weeks", satisfaction is "98%" or "4.9", and time saved is "60%" or "85%". The monday.com page credits Howard Kennedy with a 40% cut in admin overhead that its own case study doesn't mention, and the Luton case calls the firm a "Gold Partner". An operations director or finance lead who checks one number stops trusting the rest.
First action
List every number on the homepage, /get-rid-of-spreadsheets, /monday-com, /solutions and /case-studies in one sheet, with its source.
How to measure it
Campaign-page audit booking rate
- Now
- –
- Target
- +20%
- By
- 60 days
Steps
Collect the numbers
Every figure on the five main pages, with the page and exact wording.
Marketing Lead 1 day
Trace each one
Match each figure to project data or a client survey, and mark anything without a source.
Head of Customer Success 2 days
Cut or correct
Remove the 2,000-hour claim and any untraced averages; fix the "Gold Partner" line and the Howard Kennedy 40% claim.
Founder & Managing Director 1 day
Build the proof bar
Three client results plus one total, each with a source line.
Web Developer 1 day
Roll it out
The same block on the homepage, campaign page, /monday-com and /solutions.
Web Developer 1 day
Get client sign-off
Each named client approves the figure used.
Head of Customer Success 1 week
Measure
Audit booking rate on the campaign page, before and after.
Marketing Lead monthly
Why it works
Build a one-page proof ledger: every figure on the site, where it appears, and the client data behind it. Keep only the numbers you can trace to a named project or a dated client survey, and put a source line under each one ("London Luton Airport: project setup from 2 hours to 1 minute"). Replace the hero stats with three traceable results: Luton's setup time from 2 hours to 1 minute, its 58% backlog cut in two weeks with ROI in two months, and Howard Kennedy's 450+ staff working to one three-year plan. Add one honest total (50+ UK implementations). Use the same block on the homepage, the campaign page, /monday-com and /solutions, correct the "Gold Partner" line and the Howard Kennedy 40% claim, and make sure people who arrive from the campaign film see the same proof.
Buyers of a six-to-eight-week implementation are operations and finance leads who test claims before they book a call. A number tied to a named client is believed. Consistent figures also get repeated correctly in procurement notes and AI-assistant answers. And the paid campaign stops sending visitors to a page whose headline stat they can disprove with a calculator.
Ready to use
ChecklistProof ledger
Figure | Where it appears | Source | Action 2,000+ hours saved per person per year | Homepage, campaign page | None | Remove 40 hours saved per team per month | Campaign page | Luton case | Keep, attribute to Luton £10k+ / £500K average / £2M+ total savings | Homepage / monday.com page / case studies | ? | Pick one and source it 300% ROI in year one / 90 days to full ROI | Homepage / monday.com page | ? | Pick one; cite Luton's ROI in two months 6 weeks / 6–8 weeks implementation | Homepage | Project log | Use one figure 98% / 4.9 satisfaction | Homepage | Client survey | One figure, with survey size and date 60% time saved / 85% efficiency gain | Homepage, /solutions | ? | Source or remove Howard Kennedy 40% admin overhead | monday.com page | Not in the case study | Remove or add to the case "Gold Partner" | Luton case | None | Change to Platinum
Risks and how to handle them
Smaller, true numbers look less impressive
Lead with Luton's "2 hours to 1 minute", which is specific and striking.
Clients decline to be named
Use the sector and size ("a 450-person London law firm") with the figure.
Evidence
- Your websiteHomepage (checked November 19, 2026): "2k+ hours saved per person annually", "300% ROI in year one", "6 weeks average project implementation time" and, lower down, "6–8 weeks on average"; "£10k+ saved in annual software costs for SMBs"; "39%+ increase in billable utilisation"; "98% client satisfaction" beside a "4.9" satisfaction score; "50+ UK businesses" beside "200+ projects" and "98% retention"; "60% time saved" and an "85% efficiency gain"; "24/7 ongoing support". No source is given for any figure.Source
- Your websiteGet Rid of Spreadsheets campaign page: a free 30-minute operations audit ("you keep the audit notes"), booked through a form only, with bookings "confirmed within one working day"; on the same page, "40 hours saved per team per month" and "2,000+ hours saved per person per year"; second button "Not ready yet? Rewatch the ad".Source
- Your websitemonday.com page: "40% Average Productivity Increase", "90 Days to Full ROI", "£500K Average Annual Savings", "10-15 hrs saved per week on average", "Automate 85% of routine work"; credits Howard Kennedy with a 40% cut in administrative overhead; six FAQ questions (implementation time, ROI timeline, ongoing support, integrations, industries, adoption) whose answers are not in the page text; buttons "Start free monday.com trial" and "Book Your Consultation".Source
- Your websiteCase studies page: four published stories (Vivobarefoot, Jukebox, London Luton Airport, Howard Kennedy); the Vivobarefoot and Jukebox cards give no figures; totals of "£2M+ in efficiency savings, 50+ implementations"; a "More Success Stories Coming Soon" section with five placeholders (NHS Trust, Global Manufacturer, Multi-chain, University System, International NGO) without results or links.Source
- Your websiteLondon Luton Airport case study: project setup cut "from 2 hours to 1 minute", a 43-project backlog cut by 58% within two weeks, 40 hours a month saved, ROI within two months; no client quote; the body text calls mutherboard.com a "Gold Partner" while the badges say Platinum.Source
- Your websiteHoward Kennedy case study: a London law firm with 450+ staff (150+ lawyers); boards linking daily work to the three-year plan and a leadership dashboard; results given as "100% strategic visibility" and 450+ staff connected, with no percentage for administrative overhead.Source