ProgrammableMarketing/solarcraft.net (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 10
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Oct 21, 2026
  1. Programmable
  2. Playbooks
  3. Solarcraft
Solarcraft logo

growth playbook · Oct 21, 2026

solarcraft.net (opens in a new tab)

Solarcraft growth playbook

Diagnosis

Solarcraft has thirty years of engineering credibility, hazardous-location certification, its own packaged solar and UPS systems and a timely Power Without Waiting campaign.

The site hides much of it: 49 of the 91 catalogue products, including every packaged system Solarcraft builds itself, are missing from the sitemap, product pages have no descriptions and every page says "contact us for availability", against the company's own value of never making a customer wait or wonder.

This playbook fixes the listings, stock statuses, quote reply times and the lapsed SAM.gov registration first, then adds a sizing tool, case studies by market, battery and inspection programmes, a hazardous-location hub and focused outreach, and bets on bridge power for delayed utility connections, monitoring subscriptions and a second market.

Growth Score

6/10

Biggest Opportunity

Sell the packaged systems and the Power Without Waiting message as products: findable, sized, with stock shown, and a bridge-power offer for projects waiting on the utility.

Biggest Risk

Pre-engineered competitors such as SunWize and Ameresco Solar show ready systems, carts and certified kits online, so engineers who cannot see Solarcraft's stock or products quote elsewhere.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Put the 49 hidden catalogue products, including every packaged S-series solar system, into the sitemap and give each a real search listing

    Export the 91 catalogue URLs and compare them with the sitemap.

    High impact First result in 2 weeks
  2. 2

    Show stock and a lead-time band on every product, so the catalogue lives up to "Never make a customer wait or wonder"

    Tag the 20 most-quoted products with a stock status by hand.

    High impact First result in 1 month
  3. 3

    Renew the SAM.gov registration so federal and grant-funded buyers can award to Solarcraft

    Log in to SAM.gov and start the renewal.

    Medium impact First result in 1 month

02

Your idea portfolio

22 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 7 ideas are marked Unexpected: plays you are unlikely to have tried.

    1 of these are things Programmable can build and run for you.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 3Big bets · 8Fill-ins · 7Reconsider · 4
Effort →

Showing 22 of 22 ideas

This week 6

Quick wins with a clear first action.

  • 01

    Solarcraft's catalogue page links 91 products, but 49 of them are missing from the sitemap, and they are mostly Solarcraft's own engineered lines: all four S-series solar systems (S200 to S1600), all three U-series UPS systems, all four M-series motor UPS systems, all five CID2 AC-UPS units, all ten E-Structures and all 14 enclosure models. The 42 that are listed are largely resold Victron and Deka parts. The hidden pages also have empty meta descriptions and structured data that says only "Thing", so even when Google finds the S200 page it has no description, brand or product type to show. A buyer searching "12V solar power system for remote site" or "C1D2 UPS" is unlikely to land on the products Solarcraft makes itself.

    High impactLow effort First result in 2 weeks VP of IT and Automation

    First action

    Export the 91 catalogue URLs and compare them with the sitemap.

    How to measure it

    Impressions on S, U, M, CID2 and enclosure pages

    Now
    –
    Target
    3x
    By
    90 days

    Steps

    1. 1

      Compare lists

      Catalogue URLs against the sitemap; list the 49 gaps.

      VP of IT and Automation 2 hours

    2. 2

      Fix the generator

      Sitemap built from the live product table, plus campaign pages.

      VP of IT and Automation 1 day

    3. 3

      Write descriptions

      One spec-based line per product, starting with the packaged systems.

      Director of Marketing & Public Relations 2 days

    4. 4

      Upgrade markup

      "Product" with brand, item number, category and data sheet.

      VP of IT and Automation 1 day

    5. 5

      Fix odd URLs

      Redirect misspelt product URLs to clean ones.

      VP of IT and Automation 2 hours

    6. 6

      Submit

      Google Search Console and Bing Webmaster Tools.

      VP of IT and Automation 1 hour

    7. 7

      Check indexing

      Coverage report for every product page.

      VP of IT and Automation 2 weeks

    8. 8

      Report

      Impressions and RFQs from product pages, monthly.

      Director of Marketing & Public Relations monthly

    First result
    2 weeks
    Cost
    Staff time only
    Owner
    VP of IT and Automation

    Smallest test

    Add the four S-series systems to the sitemap today and request indexing for each.

    Why it works

    Regenerate the sitemap from the catalogue database so every live product URL is in it automatically, together with the Power Without Waiting page and its three articles. Write a one-line meta description for each product from the specs already on the page (for the S200: "200 W panel, 110 Ah battery, 12 VDC, 800-1,200 Wh a day for 10-20 W loads, pole-mountable"). Change the structured data from "Thing" to "Product" with brand, item number, category and a link to the data sheet (no price needed). Submit the new sitemap in Google Search Console and Bing Webmaster Tools and watch impressions for the packaged systems.

    The packaged systems are the highest-value items in the catalogue and the ones no reseller can copy. Getting them indexed with a clear description costs a day of work and puts them in front of engineers who search by load, voltage and certification.

    Ready to use

    ChecklistProduct page listing checklist

    [ ] URL in sitemap.xml (generated from the product table)
    [ ] Meta description: power, battery, voltage, load, mounting
    [ ] Structured data type Product: name, brand, item number, category
    [ ] Data sheet linked and crawlable
    [ ] One canonical URL
    [ ] Request indexing in Search Console
    [ ] Linked from its solution page (e.g. Solar Power Systems)

    Risks and how to handle them

    • Thin pages still rank poorly

      Add the data sheet text and a load example to the top 15 product pages.

    • Duplicate products in two categories

      One canonical URL per product.

    Evidence

    • SitemapThe sitemap (238 URLs, checked October 20, 2026) lists 77 /shoponline URLs, but 49 of the 91 products linked from the catalogue page are missing from it, including all four S-series solar systems, all three U-series UPS systems, all four M-series motor UPS systems, all five CID2 AC-UPS units, all ten E-Structures and all 14 enclosure models. The Power Without Waiting page and its three articles are not in it either.Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Your websiteS200 Mini System page: "Solarcraft's budget-friendly S200 is our most compact entry-level solar power system": one 200-watt panel, a 110 Ah battery bank, 12 VDC output for "10-20 watt loads of continuous DC power", "typically producing 800-1,200 watt-hours per day", installable "by a single technician". The page says "* Contact us for availability and price details." with an "Add to Quote Cart" button; its meta description is empty and its structured data is a generic "Thing" with only an item number (the same on the DC-UPS and Victron pages checked).Source
    • Your websitePower Without Waiting: a series that "explores the forces changing how midstream projects plan for power" (growing demand, utility constraints, reliability, project planning), with three articles: "Project Risks Have Changed" (July 29, 2026), "The Grid Wasn't Built for This" (August 5) and "Everyone Wants More Power" (August 12), which says "Power planning should begin early enough that project teams still have options when utility timing, cost, or location does not align with the required operational date."Source
    • Competitor researchRivals' own homepages: SunWize sells "rugged, pre-engineered systems" with a "Power Ready Express" line, a searchable catalogue, cart and login, webinars, tech notes, a capability statement and a line card; Ameresco Solar promotes "C1D2 Certified Kits", a quote cart and field support for telecom and railway; Polar Power sells DC generators and hybrid solar systems for telecom with application worksheets.Source
  • 02

    Every product page says "Contact us for availability and price details", and the Victron controller page warns of "a longer lead time" with a shipping date confirmed "after your purchase". The first core value on The Solarcraft Way is "Never make a customer wait or wonder", and the current campaign is called Power Without Waiting. A field engineer with a site down cannot tell from the page whether an S400 is on the shelf or eight weeks away.

    High impactLow effort First result in 1 month Sales and Service Director

    First action

    Tag the 20 most-quoted products with a stock status by hand.

    How to measure it

    Quote-cart submissions

    Now
    –
    Target
    +30%
    By
    90 days

    Steps

    1. 1

      Pick statuses

      Three plain bands.

      Sales and Service Director 1 day

    2. 2

      Tag top 20

      From the inventory system.

      Director of Operations 1 day

    3. 3

      Add the field

      On product and quote-cart pages.

      VP of IT and Automation 2 days

    4. 4

      Weekly update

      Inventory export to the site.

      Director of Operations weekly

    5. 5

      Price bands

      Agree where "from" prices are safe.

      Vice President of Sales 1 week

    6. 6

      Train sales

      Quote replies repeat the status.

      Sales and Service Director 1 day

    7. 7

      Measure

      Quote-cart volume and calls per order.

      Director of Marketing & Public Relations monthly

    First result
    1 month
    Cost
    Staff time only
    Owner
    Sales and Service Director

    Smallest test

    Add stock statuses to the S-series and DC-UPS pages this week.

    Why it works

    Add a simple status to each product: "In stock, ships in 2-3 days", "Builds in 2-4 weeks" or "Lead time 6+ weeks, call for options", updated weekly from inventory. Add a price band or "from" price where the team is comfortable, and keep the quote cart for the final price. Show the same status in the quote cart and in the quote reply.

    Availability is the first question in an urgent purchase. Answering it on the page brings in the buyers who need power now and saves the sales team the calls that only ask "do you have it?".

    Risks and how to handle them

    • Status goes stale

      Automate the weekly export and show the update date.

    • Rivals see stock levels

      Show bands, not quantities.

    Evidence

    • Your websiteS200 Mini System page: "Solarcraft's budget-friendly S200 is our most compact entry-level solar power system": one 200-watt panel, a 110 Ah battery bank, 12 VDC output for "10-20 watt loads of continuous DC power", "typically producing 800-1,200 watt-hours per day", installable "by a single technician". The page says "* Contact us for availability and price details." with an "Add to Quote Cart" button; its meta description is empty and its structured data is a generic "Thing" with only an item number (the same on the DC-UPS and Victron pages checked).Source
    • Your websiteVictron SmartSolar MPPT 150-35 page: "Note: Due to demand, please expect a longer lead time for this product. We will confirm a shipping date with you after your purchase." The footer of every page shows a "Victron Dedicated Hotline 281.340.1229".Source
    • Your websiteThe Solarcraft Way lists the core values "Never make a customer wait or wonder!", "Be efficient, proactive, and engaged!" and "Continuously improve!". The site also runs two campaigns: "Power Without Waiting" and "Built to Last³" ("Built Smarter, Built Stronger, and Built Longer"; "Supported beyond installation").Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
  • 03

    SAM.gov shows Solarcraft, Inc. as a small-business manufacturer registered since 2013 for all awards, but the registration expired on August 1, 2026. Without an active record, federal agencies, and many utilities and transit agencies spending federal money, cannot award contracts to it.

    Medium impactLow effort First result in 1 month Vice President of Operations…

    First action

    Log in to SAM.gov and start the renewal.

    How to measure it

    Registration status

    Now
    –
    Target
    Active
    By
    30 days

    Steps

    1. 1

      Gather details

      Banking, tax and ownership information.

      Vice President of Operations & Quality 1 day

    2. 2

      Renew

      Complete the SAM.gov update.

      Vice President of Operations & Quality 1 day

    3. 3

      Review codes

      NAICS for every product line.

      Vice President of Sales 1 day

    4. 4

      Set reminder

      60 days before expiry.

      Vice President of Operations & Quality 1 hour

    5. 5

      Publish codes

      UEI and CAGE on the contact page.

      Director of Marketing & Public Relations 1 hour

    6. 6

      Watch notices

      Saved searches for solar, UPS and enclosures.

      Vice President of Sales weekly

    First result
    1 month
    Cost
    $0
    Owner
    Vice President of Operations & Quality

    Smallest test

    Start the renewal today.

    Why it works

    Renew the registration in SAM.gov, confirm the NAICS codes cover every product line (enclosures, panels and UPS as well as solar), and set a calendar reminder 60 days before the next annual expiry. Add a short "Government and utility buyers" note with the UEI and CAGE code to the contact page.

    Federal infrastructure, Department of Defense and transportation buyers need an active registration before they can buy, and the work is a few hours.

    Risks and how to handle them

    • Validation delays

      Start now; renewals can take several weeks.

    Evidence

    • SAM.gov recordSAM.gov entity record for SOLARCRAFT, INC. (UEI JCLLV361DYE8, CAGE 1JEZ5, Sugar Land, TX): a small-business manufacturer registered since 2013 for "All awards", primary NAICS 335999; registration status "Expired", with an expiration date of August 1, 2026.Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websiteCertifications and Standards: systems built to "exceed the UL 508A code requirements"; "Intertek certified that our systems meet the specific standards for locations classified as hazardous" (CID2); an ISNetworld member contractor ("800 Hiring Clients and 80,000 contractors and suppliers use ISNetworld").Source
  • 04

    LinkedIn is Solarcraft's only linked social channel, and the homepage has no social share image, so links to the site, the Power Without Waiting series or a case study post as plain text. Product pages have empty descriptions too.

    Medium impactLow effort First result in 2 weeks Director of Marketing & Publi…

    First action

    Add an image to the homepage and the Power Without Waiting page.

    How to measure it

    LinkedIn referral visits

    Now
    –
    Target
    +50%
    By
    60 days

    Steps

    1. 1

      Pick photos

      Ten real installation images.

      Director of Marketing & Public Relations 1 day

    2. 2

      Add tags

      Image, title and description.

      VP of IT and Automation 1 day

    3. 3

      Cover the series

      Power Without Waiting pages.

      VP of IT and Automation 2 hours

    4. 4

      Test

      LinkedIn Post Inspector.

      Director of Marketing & Public Relations 1 hour

    5. 5

      Repost

      Re-share the three articles.

      Director of Marketing & Public Relations 1 week

    6. 6

      Measure

      LinkedIn traffic.

      Director of Marketing & Public Relations monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Director of Marketing & Public Relations

    Smallest test

    Fix the homepage share image today.

    Why it works

    Add a share image and description to the homepage, each solution page, the Power Without Waiting page and its articles, and each case study. Use real photographs of enclosures and installed systems. Test each link in LinkedIn's Post Inspector.

    Posts with a strong image earn more clicks, and the series is meant to be shared by project teams.

    Risks and how to handle them

    • Generic stock photos

      Use Solarcraft's own field photographs.

    Evidence

    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websitePower Without Waiting: a series that "explores the forces changing how midstream projects plan for power" (growing demand, utility constraints, reliability, project planning), with three articles: "Project Risks Have Changed" (July 29, 2026), "The Grid Wasn't Built for This" (August 5) and "Everyone Wants More Power" (August 12), which says "Power planning should begin early enough that project teams still have options when utility timing, cost, or location does not align with the required operational date."Source
    • Your websiteS200 Mini System page: "Solarcraft's budget-friendly S200 is our most compact entry-level solar power system": one 200-watt panel, a 110 Ah battery bank, 12 VDC output for "10-20 watt loads of continuous DC power", "typically producing 800-1,200 watt-hours per day", installable "by a single technician". The page says "* Contact us for availability and price details." with an "Add to Quote Cart" button; its meta description is empty and its structured data is a generic "Thing" with only an item number (the same on the DC-UPS and Victron pages checked).Source
  • 05

    The contact form says "We will respond as quickly as possible", and the quote cart and eight RFQ forms give no timing. For a company whose first value is "Never make a customer wait or wonder", the silence after a quote request is the riskiest moment.

    High impactLow effort First result in 1 month Sales and Service Director

    First action

    Measure last month's average time from RFQ to quote.

    How to measure it

    Median time to quote

    Now
    –
    Target
    Under 1 business day for stock items
    By
    60 days

    Steps

    1. 1

      Measure

      Last 50 RFQs.

      Sales and Service Director 1 day

    2. 2

      Set promise

      By product type.

      Vice President of Sales 1 day

    3. 3

      Auto-reply

      Date and owner in the confirmation.

      VP of IT and Automation 2 days

    4. 4

      Publish

      On forms and quote cart.

      Director of Marketing & Public Relations 1 hour

    5. 5

      Track

      Weekly report.

      Sales and Service Director weekly

    6. 6

      Review misses

      Fix the cause.

      Vice President of Sales monthly

    First result
    1 month
    Cost
    Staff time only
    Owner
    Sales and Service Director

    Smallest test

    Add a reply-time line to the quote cart.

    Why it works

    Publish a reply promise ("standard items quoted within one business day, engineered systems within three"), send an automatic confirmation with the promised date and the name of the person handling it, and track the real response time weekly.

    Engineers often send the same RFQ to two or three suppliers; a clear promise and a fast first reply win the order before price is compared.

    Risks and how to handle them

    • Missing the promise

      Start with a promise the team already meets 90% of the time.

    Evidence

    • Your websiteDeploying & Troubleshooting Your System: written installation guidance (face panels due south, tilt for latitude plus 15 degrees, battery voltage checks) that still refers to "Kyocera and BP solar panels with junction boxes"; no video. The contact form says "We will respond as quickly as possible" with hours "Monday through Friday, 7 AM to 5 PM CST", and the sitemap has eight separate RFQ forms by product line.Source
    • Your websiteThe Solarcraft Way lists the core values "Never make a customer wait or wonder!", "Be efficient, proactive, and engaged!" and "Continuously improve!". The site also runs two campaigns: "Power Without Waiting" and "Built to Last³" ("Built Smarter, Built Stronger, and Built Longer"; "Supported beyond installation").Source
    • Your websiteS200 Mini System page: "Solarcraft's budget-friendly S200 is our most compact entry-level solar power system": one 200-watt panel, a 110 Ah battery bank, 12 VDC output for "10-20 watt loads of continuous DC power", "typically producing 800-1,200 watt-hours per day", installable "by a single technician". The page says "* Contact us for availability and price details." with an "Add to Quote Cart" button; its meta description is empty and its structured data is a generic "Thing" with only an item number (the same on the DC-UPS and Victron pages checked).Source
  • 06

    Real visitors pass Core Web Vitals, but the homepage downloads 13.3 MB, including 5.4 MB of images and 1.5 MB of fonts, and render-blocking files delay it by about 6.5 seconds in Google's phone test. Field technicians and engineers at remote sites often browse on weak cellular signal.

    Medium impactLow effort First result in 2 weeks VP of IT and Automation

    First action

    Compress the homepage hero image.

    How to measure it

    Homepage download size

    Now
    –
    Target
    Under 3 MB
    By
    30 days

    Steps

    1. 1

      List heavy files

      From the PageSpeed report.

      VP of IT and Automation 1 hour

    2. 2

      Compress images

      WebP at displayed sizes.

      VP of IT and Automation 1 day

    3. 3

      Trim fonts

      Two weights at most.

      VP of IT and Automation 2 hours

    4. 4

      Defer scripts

      Non-critical CSS and JavaScript.

      VP of IT and Automation 1 day

    5. 5

      Retest

      PageSpeed mobile.

      VP of IT and Automation 1 hour

    6. 6

      Repeat

      Solution pages.

      VP of IT and Automation 1 week

    First result
    2 weeks
    Cost
    Staff time only
    Owner
    VP of IT and Automation

    Smallest test

    Compress the three largest images.

    Why it works

    Compress and resize the hero and gallery images (WebP, correct sizes), load fewer font weights, and defer non-critical scripts and stylesheets. Retest in PageSpeed after each change.

    A lighter site loads where Solarcraft's customers work, and it is cheap to do while the template is open for the sitemap fix.

    Risks and how to handle them

    • Visual quality drops

      Check images on a large screen before publishing.

    Evidence

    • Google PageSpeedHomepage on mobile: performance 55/100; in the lab test the main image takes 29.4s to appear and the page downloads 13.3 MB (5.4 MB of images, 1.5 MB of fonts); render-blocking requests cost about 6.5s. Real visitors pass Core Web Vitals (field LCP 2.1s, CLS 0), so this matters most for slow cellular connections, not as an emergency.Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source

This quarter 10

The core plays for the next three months.

  • 07

    The S200 page already gives the numbers a buyer needs: 12 VDC, 10-20 W continuous loads and 800-1,200 watt-hours a day with 4-6 hours of sun. The four packaged systems (S200 to S1600) and three UPS systems cover a range of loads, but buyers must read each page and do the maths. SunWize sells a pre-engineered express line with a searchable catalogue.

    High impactMedium effort First result in 1 quarter Vice President of Strategy &…

    First action

    Write the sizing rules for the four S-series systems.

    How to measure it

    Sizing-tool quote requests

    Now
    –
    Target
    30 a month
    By
    2 quarters

    Steps

    1. 1

      Write rules

      Loads, autonomy and sun hours per system.

      Vice President of Strategy & Product Development 2 weeks

    2. 2

      Add sun data

      Peak sun hours by state.

      Vice President of Strategy & Product Development 1 week

    3. 3

      Build form

      On the Solar Power Systems page.

      VP of IT and Automation 3 weeks

    4. 4

      Pass to cart

      Inputs attached to the quote.

      VP of IT and Automation 1 week

    5. 5

      Engineer check

      Every recommendation reviewed before quoting.

      Sales and Service Director ongoing

    6. 6

      Add UPS

      Same tool for U-series and DC-UPS.

      Vice President of Strategy & Product Development 1 month

    7. 7

      Measure

      Requests and win rate.

      Vice President of Sales monthly

    First result
    1 quarter
    Cost
    Staff and development time
    Owner
    Vice President of Strategy & Product Development

    Smallest test

    Publish a static sizing table for the S-series first.

    Why it works

    Build a short form: load in watts, voltage, hours per day, days of autonomy and site location. It recommends the right packaged system (or flags a custom design), shows the expected watt-hours and battery days, and adds the system to the quote cart with the inputs attached for the engineer.

    Engineers prefer to qualify a product before they call, and a sized recommendation turns a browse into a specific quote request.

    Risks and how to handle them

    • Wrong sizing

      Label it an estimate and confirm every quote by an engineer.

    Evidence

    • Your websiteS200 Mini System page: "Solarcraft's budget-friendly S200 is our most compact entry-level solar power system": one 200-watt panel, a 110 Ah battery bank, 12 VDC output for "10-20 watt loads of continuous DC power", "typically producing 800-1,200 watt-hours per day", installable "by a single technician". The page says "* Contact us for availability and price details." with an "Add to Quote Cart" button; its meta description is empty and its structured data is a generic "Thing" with only an item number (the same on the DC-UPS and Victron pages checked).Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Competitor researchRivals' own homepages: SunWize sells "rugged, pre-engineered systems" with a "Power Ready Express" line, a searchable catalogue, cart and login, webinars, tech notes, a capability statement and a line card; Ameresco Solar promotes "C1D2 Certified Kits", a quote cart and field support for telecom and railway; Polar Power sells DC generators and hybrid solar systems for telecom with application worksheets.Source
  • 08

    The case studies page says case studies "remove the guesswork", but there are only two, both pipeline valve projects, and the site has no testimonials. The homepage says Solarcraft has moved into telecom, transportation, utilities and surveillance, which have no proof on the site.

    High impactMedium effort First result in 2 quarters Director of Marketing & Publi…

    First action

    List one completed project in each market.

    How to measure it

    Case studies

    Now
    –
    Target
    8
    By
    2 quarters

    Steps

    1. 1

      List projects

      One per market.

      Vice President of Sales 1 week

    2. 2

      Ask customers

      Permission and a quote.

      Sales and Service Director 2 weeks

    3. 3

      Interview

      Site problem and result.

      Director of Marketing & Public Relations 1 month

    4. 4

      Photograph

      Installed systems.

      Director of Marketing & Public Relations 1 month

    5. 5

      Write

      One page each with a PDF.

      Director of Marketing & Public Relations 1 quarter

    6. 6

      Link

      From each market page.

      VP of IT and Automation 1 day

    7. 7

      Use in sales

      Attach to RFQ replies.

      Vice President of Sales ongoing

    First result
    2 quarters
    Cost
    Writing and photography time
    Owner
    Director of Marketing & Public Relations

    Smallest test

    Publish one telecom case study.

    Why it works

    Write one short case study per market (telecom, transportation, water and wastewater, security cameras, obstruction lighting, battery storage): the site problem, the system, a photo and one measured result such as uptime or install time. Ask each customer for a quote and permission to name them.

    Buyers in new markets need evidence from their own industry before they put a new supplier on a bid list.

    Risks and how to handle them

    • Customers decline to be named

      Publish anonymised stories with the sector and region.

    Evidence

    • Your websiteCase studies page: "Case studies remove the guesswork. Instead of relying solely on reviews or promises, you can evaluate Solarcraft's track record across different project types". It lists two case studies, both pipeline valve projects; the site has no customer testimonials. The homepage says Solarcraft has "advanced into Telecommunications, Transportation, Utilities, and Surveillance".Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websiteApplications and solutions include battery energy storage and utility interconnects, solar grid-tie systems "for ESG", mobile solar power trailers, valve actuation, SCADA, gas analyzers, obstruction lighting and site security; components include the TPDIN2 web-based remote monitor and the Victron Cerbo GX.Source
  • 09

    Batteries are the part of a solar or UPS system that wears out, and Solarcraft's own VP of Strategy & Product Development discussed "Optimizing Battery Life" on the Pipeliners Podcast. Since 1994 Solarcraft has shipped systems with batteries installed, and the catalogue sells replacement Deka, Victron and Full River batteries.

    High impactMedium effort First result in 1 quarter Sales and Service Director

    First action

    Pull a list of systems shipped in 2021.

    How to measure it

    Replacement orders from reminders

    Now
    –
    Target
    40 a quarter
    By
    2 quarters

    Steps

    1. 1

      Pull records

      Systems shipped 2020-2022.

      Director of Operations 1 week

    2. 2

      Map batteries

      Each system to its replacement part.

      Vice President of Strategy & Product Development 1 week

    3. 3

      Write reminder

      Part, kit and service option.

      Director of Marketing & Public Relations 2 days

    4. 4

      Send

      In batches by ship year.

      Sales and Service Director monthly

    5. 5

      Follow up

      Calls to large accounts.

      Sales and Service Director ongoing

    6. 6

      Measure

      Orders per reminder.

      Vice President of Sales monthly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Sales and Service Director

    Smallest test

    Email 25 customers whose systems shipped in 2021.

    Why it works

    Use shipping records to estimate when each customer's battery banks are due (for example four to five years after shipment), and send the customer a reminder with the exact replacement battery, the hardware kit and a field-service option. Start with systems shipped in 2020-2022.

    Replacement batteries are a predictable, recurring sale to customers who already trust the system, and timely replacement protects Solarcraft's reliability reputation.

    Risks and how to handle them

    • Records incomplete for old systems

      Start with recent years and ask customers to confirm.

    Evidence

    • Your websitePodcasts page: three Pipeliners Podcast episodes with Solarcraft's Vice President of Strategy & Product Development: 321 "Powering Remote Shutdown Valves", 350 "Optimizing Battery Life" and 351 "Alternative Approaches to Powering Remote Valves".Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
  • 10

    Solarcraft publishes articles on hurricane preparation for solar and UPS systems (June 2026) and on cold-weather solar, and it offers field services to "maintain systems in the field for the life of your systems". The articles give advice but do not sell the inspection.

    Medium impactMedium effort First result in 1 quarter Sales and Service Director

    First action

    Price a standard inspection for one site.

    How to measure it

    Pre-season inspections

    Now
    –
    Target
    30 a season
    By
    2 seasons

    Steps

    1. 1

      Define checklist

      What the technician checks.

      Sales and Service Director 1 week

    2. 2

      Price it

      Per site and per group of sites.

      Vice President of Sales 1 week

    3. 3

      Pick regions

      Gulf Coast and northern sites.

      Sales and Service Director 1 day

    4. 4

      Email customers

      Two months before the season.

      Director of Marketing & Public Relations 1 week

    5. 5

      Link articles

      Hurricane and cold-weather posts.

      VP of IT and Automation 1 hour

    6. 6

      Schedule

      Route crews efficiently.

      Director of Operations seasonal

    7. 7

      Review

      Findings and follow-on orders.

      Sales and Service Director seasonal

    First result
    1 quarter
    Cost
    Technician time
    Owner
    Sales and Service Director

    Smallest test

    Offer winter inspections to ten northern sites.

    Why it works

    Package a pre-season inspection (battery test, panel and mount check, enclosure seals, charge controller settings) for Gulf Coast sites before hurricane season and northern sites before winter. Email past customers in the affected regions and link the offer from the seasonal articles.

    It turns content Solarcraft already writes into service revenue and catches failures before they become emergency calls.

    Risks and how to handle them

    • Crew capacity

      Book in regional routes.

    Evidence

    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websiteDeploying & Troubleshooting Your System: written installation guidance (face panels due south, tilt for latitude plus 15 degrees, battery voltage checks) that still refers to "Kyocera and BP solar panels with junction boxes"; no video. The contact form says "We will respond as quickly as possible" with hours "Monday through Friday, 7 AM to 5 PM CST", and the sitemap has eight separate RFQ forms by product line.Source
  • 11

    The Power Without Waiting series argues that power planning "should begin early enough that project teams still have options", and three articles appeared in July and August 2026. The pages are not in the sitemap, and the only next step is "Request a Quote", which is too early for a project still in planning.

    High impactMedium effort First result in 1 quarter Director of Marketing & Publi…

    First action

    Draft the checklist from the three articles.

    How to measure it

    Downloads

    Now
    –
    Target
    100 a quarter
    By
    2 quarters

    Steps

    1. 1

      Write checklist

      From the series.

      Vice President of Strategy & Product Development 1 week

    2. 2

      Design

      One-page PDF.

      Director of Marketing & Public Relations 1 week

    3. 3

      Add form

      On the series page.

      VP of IT and Automation 2 days

    4. 4

      Email series

      Three follow-ups.

      Director of Marketing & Public Relations 1 week

    5. 5

      Publish monthly

      New article each month.

      Director of Marketing & Public Relations monthly

    6. 6

      Share

      LinkedIn and partners.

      Director of Marketing & Public Relations monthly

    7. 7

      Route leads

      To the sales team with project stage.

      Vice President of Sales ongoing

    First result
    1 quarter
    Cost
    Design time
    Owner
    Director of Marketing & Public Relations

    Smallest test

    Put the checklist on the series page as a PDF.

    Why it works

    Offer a one-page "Power planning checklist for remote sites" (load, utility timeline, autonomy, certification, lead times) in exchange for an email, then send the series and a "talk to an engineer" offer. Publish one new article a month and share each on LinkedIn.

    A planning tool captures projects months before an RFQ, when Solarcraft can shape the specification.

    Risks and how to handle them

    • Low download volume

      Promote through the Pipeliners Podcast audience and LinkedIn.

    Evidence

    • Your websitePower Without Waiting: a series that "explores the forces changing how midstream projects plan for power" (growing demand, utility constraints, reliability, project planning), with three articles: "Project Risks Have Changed" (July 29, 2026), "The Grid Wasn't Built for This" (August 5) and "Everyone Wants More Power" (August 12), which says "Power planning should begin early enough that project teams still have options when utility timing, cost, or location does not align with the required operational date."Source
    • SitemapThe sitemap (238 URLs, checked October 20, 2026) lists 77 /shoponline URLs, but 49 of the 91 products linked from the catalogue page are missing from it, including all four S-series solar systems, all three U-series UPS systems, all four M-series motor UPS systems, all five CID2 AC-UPS units, all ten E-Structures and all 14 enclosure models. The Power Without Waiting page and its three articles are not in it either.Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
  • 12

    Solarcraft has Intertek certification for hazardous locations, five CID2 AC-UPS units, a CID2 DC-UPS and an article on HAZLOC risks, but they are spread across the catalogue and an old blog post. Ameresco Solar puts "C1D2 Certified Kits" in its main navigation.

    Medium impactMedium effort First result in 1 quarter Director of Marketing & Publi…

    First action

    List every CID2 product and certificate.

    How to measure it

    CID2 RFQs

    Now
    –
    Target
    +40%
    By
    2 quarters

    Steps

    1. 1

      Collect

      Products and certificates.

      Vice President of Strategy & Product Development 1 week

    2. 2

      Write page

      Plain explanation and products.

      Director of Marketing & Public Relations 1 week

    3. 3

      Add RFQ

      Hazardous-location form.

      VP of IT and Automation 1 day

    4. 4

      Link

      Oil and gas and certification pages.

      VP of IT and Automation 1 hour

    5. 5

      Promote

      LinkedIn and email.

      Director of Marketing & Public Relations 2 weeks

    6. 6

      Measure

      RFQs and search impressions.

      Director of Marketing & Public Relations monthly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Director of Marketing & Public Relations

    Smallest test

    Publish the product list on one page.

    Why it works

    Build one page for "Class I Division 2 solar and UPS systems": what the certification covers, every CID2 product, the certificate, typical oil and gas applications and a dedicated RFQ. Link it from the oil and gas page and the certifications page.

    Hazardous-location buyers search by certification, and a single page shows Solarcraft has more certified options than a kit seller.

    Risks and how to handle them

    • Certification wording

      Have engineering check every claim against the certificate.

    Evidence

    • Your websiteCertifications and Standards: systems built to "exceed the UL 508A code requirements"; "Intertek certified that our systems meet the specific standards for locations classified as hazardous" (CID2); an ISNetworld member contractor ("800 Hiring Clients and 80,000 contractors and suppliers use ISNetworld").Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Competitor researchRivals' own homepages: SunWize sells "rugged, pre-engineered systems" with a "Power Ready Express" line, a searchable catalogue, cart and login, webinars, tech notes, a capability statement and a line card; Ameresco Solar promotes "C1D2 Certified Kits", a quote cart and field support for telecom and railway; Polar Power sells DC generators and hybrid solar systems for telecom with application worksheets.Source
    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
  • 13

    Solarcraft is UL 508A capable, Intertek certified for hazardous locations and an ISNetworld member contractor, and it covers engineering, fabrication, integration and field service. SunWize publishes a capability statement and a line card for buyers. Procurement teams adding a supplier look for exactly these documents.

    Medium impactLow effort First result in 1 month Vice President of Sales

    First action

    Draft the capability statement.

    How to measure it

    New customer accounts

    Now
    –
    Target
    +15%
    By
    2 quarters

    Steps

    1. 1

      Gather facts

      Certifications and codes.

      Vice President of Operations & Quality 2 days

    2. 2

      Write

      Two pages.

      Director of Marketing & Public Relations 1 week

    3. 3

      Line card

      Brands and products stocked.

      Director of Marketing & Public Relations 2 days

    4. 4

      Publish

      About and Contact pages.

      VP of IT and Automation 1 hour

    5. 5

      Attach

      To first quotes.

      Sales and Service Director ongoing

    6. 6

      Update

      Twice a year.

      Director of Marketing & Public Relations 6 months

    First result
    1 month
    Cost
    Design time
    Owner
    Vice President of Sales

    Smallest test

    Publish a one-page version.

    Why it works

    Create a two-page capability statement (capabilities, certifications, ISNetworld number, NAICS codes, UEI and CAGE, facility, key markets) and a line card of brands stocked. Put both on the About and Contact pages and attach them to every first quote.

    It answers the supplier-onboarding questions before they are asked and makes it easier for a champion to get Solarcraft approved.

    Risks and how to handle them

    • Out-of-date details

      Date the document and review it every six months.

    Evidence

    • Your websiteCertifications and Standards: systems built to "exceed the UL 508A code requirements"; "Intertek certified that our systems meet the specific standards for locations classified as hazardous" (CID2); an ISNetworld member contractor ("800 Hiring Clients and 80,000 contractors and suppliers use ISNetworld").Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • SAM.gov recordSAM.gov entity record for SOLARCRAFT, INC. (UEI JCLLV361DYE8, CAGE 1JEZ5, Sugar Land, TX): a small-business manufacturer registered since 2013 for "All awards", primary NAICS 335999; registration status "Expired", with an expiration date of August 1, 2026.Source
    • Competitor researchRivals' own homepages: SunWize sells "rugged, pre-engineered systems" with a "Power Ready Express" line, a searchable catalogue, cart and login, webinars, tech notes, a capability statement and a line card; Ameresco Solar promotes "C1D2 Certified Kits", a quote cart and field support for telecom and railway; Polar Power sells DC generators and hybrid solar systems for telecom with application worksheets.Source
  • 14

    Both of Solarcraft's case studies and three podcast episodes are about powering remote valves, and the articles cover valve stations and actuators in depth. That is a clear niche where Solarcraft has proof, but the outreach is left to inbound.

    High impactMedium effort First result in 2 quarters Vice President of Sales

    First action

    List 30 operators and contractors.

    How to measure it

    Operator meetings

    Now
    –
    Target
    15
    By
    2 quarters

    Steps

    1. 1

      Build list

      30 operators and EPCs.

      Vice President of Sales 2 weeks

    2. 2

      Find contacts

      Automation and facilities engineers.

      Sales and Service Director 2 weeks

    3. 3

      Pack the story

      Case studies and podcasts.

      Director of Marketing & Public Relations 1 week

    4. 4

      Reach out

      Email, LinkedIn and calls.

      Vice President of Sales 1 quarter

    5. 5

      Offer review

      One site power design.

      Vice President of Strategy & Product Development ongoing

    6. 6

      Host visits

      Facility tours.

      President monthly

    7. 7

      Track

      Meetings and bids.

      Vice President of Sales monthly

    First result
    2 quarters
    Cost
    Sales time
    Owner
    Vice President of Sales

    Smallest test

    Send the valve story to ten operators.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Build a list of pipeline operators and their engineering contractors with active valve automation work, and run a focused campaign: the valve case studies, the podcast episodes, an offer to review one site's power design and a visit to the Sugar Land facility.

    A narrow audience with a proven story converts far better than broad marketing, and each operator has many valve sites.

    Risks and how to handle them

    • Long buying cycles

      Aim for approved-supplier status, not an immediate order.

    Evidence

    • Your websiteCase studies page: "Case studies remove the guesswork. Instead of relying solely on reviews or promises, you can evaluate Solarcraft's track record across different project types". It lists two case studies, both pipeline valve projects; the site has no customer testimonials. The homepage says Solarcraft has "advanced into Telecommunications, Transportation, Utilities, and Surveillance".Source
    • Your websitePodcasts page: three Pipeliners Podcast episodes with Solarcraft's Vice President of Strategy & Product Development: 321 "Powering Remote Shutdown Valves", 350 "Optimizing Battery Life" and 351 "Alternative Approaches to Powering Remote Valves".Source
    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
  • 15

    Solarcraft sells nationally from Sugar Land, and one article describes a hybrid power trailer shipped from Texas to Quebec. Industrial buyers in other basins and in Canada often buy through local manufacturer's representatives who visit sites.

    Medium impactMedium effort First result in 2 quarters Vice President of Sales

    First action

    Map where current quotes come from by state.

    How to measure it

    Quotes from rep regions

    Now
    –
    Target
    20 a quarter
    By
    3 quarters

    Steps

    1. 1

      Map demand

      Quotes by region.

      Vice President of Sales 1 week

    2. 2

      Pick regions

      Two or three.

      Vice President of Sales 1 week

    3. 3

      Find reps

      Firms selling complementary lines.

      Vice President of Sales 1 month

    4. 4

      Agree terms

      Commission and territory.

      President 2 weeks

    5. 5

      Train

      Products and sizing.

      Vice President of Strategy & Product Development 2 weeks

    6. 6

      Review

      Quarterly results.

      Vice President of Sales quarterly

    First result
    2 quarters
    Cost
    Commission only
    Owner
    Vice President of Sales

    Smallest test

    Sign one rep for one region.

    Why it works

    Sign two or three manufacturer's rep firms in regions with many remote sites (for example the Rockies, Appalachia and western Canada). Give them a commission, training, demo materials and the sizing tool, and track quotes by region.

    Reps add local relationships without a full sales hire and bring Solarcraft into bids it never hears about.

    Risks and how to handle them

    • Reps focus on other lines

      Give them leads and quick quote support.

    Evidence

    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websiteApplications and solutions include battery energy storage and utility interconnects, solar grid-tie systems "for ESG", mobile solar power trailers, valve actuation, SCADA, gas analyzers, obstruction lighting and site security; components include the TPDIN2 web-based remote monitor and the Victron Cerbo GX.Source
  • 16

    Every page shows a "Victron Dedicated Hotline" and the catalogue carries many Victron inverters, chargers, controllers and the Cerbo GX, yet there is no page explaining what Solarcraft offers Victron buyers: stock, configuration help, integration into enclosures and support.

    Medium impactMedium effort First result in 1 quarter Vice President of Strategy &…

    First action

    Count last year's Victron orders and calls.

    How to measure it

    Calls and RFQs from the Victron page

    Now
    –
    Target
    +25%
    By
    2 quarters

    Steps

    1. 1

      Count demand

      Orders and hotline calls.

      Sales and Service Director 1 week

    2. 2

      Write page

      Stock, help, integration.

      Director of Marketing & Public Relations 1 week

    3. 3

      Show systems

      Integrated examples.

      Vice President of Strategy & Product Development 1 week

    4. 4

      Link products

      From each Victron page.

      VP of IT and Automation 1 day

    5. 5

      Promote

      Email existing buyers.

      Director of Marketing & Public Relations 1 week

    6. 6

      Measure

      Calls and RFQs.

      Sales and Service Director monthly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Vice President of Strategy & Product Development

    Smallest test

    Publish a short Victron support section.

    Why it works

    Create a Victron page: products stocked, configuration and programming help, integrated Victron systems in Solarcraft enclosures, remote monitoring with Cerbo GX and the hotline number. Link it from each Victron product page.

    Buyers searching for Victron parts are already the right audience; the page can upsell them to an integrated enclosure.

    Risks and how to handle them

    • Brand guidelines

      Check Victron's dealer rules for logos and wording.

    Evidence

    • Your websiteVictron SmartSolar MPPT 150-35 page: "Note: Due to demand, please expect a longer lead time for this product. We will confirm a shipping date with you after your purchase." The footer of every page shows a "Victron Dedicated Hotline 281.340.1229".Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Your websiteApplications and solutions include battery energy storage and utility interconnects, solar grid-tie systems "for ESG", mobile solar power trailers, valve actuation, SCADA, gas analyzers, obstruction lighting and site security; components include the TPDIN2 web-based remote monitor and the Victron Cerbo GX.Source

Big bets 3

Larger plays that can change the trajectory.

  • 17

    The Power Without Waiting series says utility timelines are becoming a critical project risk, and Solarcraft already builds mobile solar power trailers, hybrid solar and UPS systems, battery storage and utility interconnects. The series diagnoses the problem but does not yet sell a product for it.

    High impactHigh effort First result in 3 quarters Vice President of Strategy &…

    First action

    Price a six-month bridge-power rental for one standard site.

    How to measure it

    Contracts signed

    Now
    –
    Target
    10
    By
    4 quarters

    Steps

    1. 1

      Define offer

      Sizes, terms and buy-back.

      Vice President of Strategy & Product Development 1 month

    2. 2

      Build fleet

      Five trailers or skids.

      Director of Operations 1 quarter

    3. 3

      Price

      Rental and purchase.

      Vice President of Sales 1 month

    4. 4

      Add to series

      Call to action on each article.

      Director of Marketing & Public Relations 1 week

    5. 5

      Sell

      Midstream and utility contacts.

      Vice President of Sales 2 quarters

    6. 6

      Service

      Monitoring and pick-up.

      Sales and Service Director ongoing

    7. 7

      Review

      Utilisation and margin.

      President quarterly

    First result
    3 quarters
    Cost
    Fleet capital
    Owner
    Vice President of Strategy & Product Development

    Smallest test

    Offer one bridge-power quote to a current project.

    Why it works

    Package a "bridge power" offer for projects whose utility connection is late: a rental or buy-back hybrid trailer or skid sized to the load, delivered and commissioned, with the option to keep it as backup once the utility arrives. Launch it as the answer at the end of each Power Without Waiting article.

    It turns a strategic message into a revenue line, and rentals put Solarcraft equipment on many more sites.

    Risks and how to handle them

    • Units sit idle

      Start with five units and buy-back terms.

    Evidence

    • Your websitePower Without Waiting: a series that "explores the forces changing how midstream projects plan for power" (growing demand, utility constraints, reliability, project planning), with three articles: "Project Risks Have Changed" (July 29, 2026), "The Grid Wasn't Built for This" (August 5) and "Everyone Wants More Power" (August 12), which says "Power planning should begin early enough that project teams still have options when utility timing, cost, or location does not align with the required operational date."Source
    • Your websiteApplications and solutions include battery energy storage and utility interconnects, solar grid-tie systems "for ESG", mobile solar power trailers, valve actuation, SCADA, gas analyzers, obstruction lighting and site security; components include the TPDIN2 web-based remote monitor and the Victron Cerbo GX.Source
    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
  • 18

    Solarcraft sells the TPDIN2 web-based remote monitor and the Victron Cerbo GX, and promises support "for the life of your systems". Monitoring today is a component sale, not a service.

    High impactHigh effort First result in 4 quarters VP of IT and Automation

    First action

    Sign five customers to a free pilot.

    How to measure it

    Systems on subscription

    Now
    –
    Target
    200
    By
    4 quarters

    Steps

    1. 1

      Pick hardware

      TPDIN2 or Cerbo GX.

      Vice President of Strategy & Product Development 1 month

    2. 2

      Build dashboard

      Alarms and reports.

      VP of IT and Automation 1 quarter

    3. 3

      Pilot

      Five customers.

      Sales and Service Director 1 quarter

    4. 4

      Price

      Per site per month.

      Vice President of Sales 1 month

    5. 5

      Bundle

      First year with new systems.

      Vice President of Sales ongoing

    6. 6

      Respond

      Alarm handling process.

      Director of Operations ongoing

    7. 7

      Review

      Churn and service revenue.

      President quarterly

    First result
    4 quarters
    Cost
    Development and support time
    Owner
    VP of IT and Automation

    Smallest test

    Monitor ten pilot sites for three months.

    Why it works

    Offer a monitoring subscription: battery voltage, charge, load and enclosure alarms sent to the customer and to Solarcraft, with a monthly health report and priority service. Include the first year with new systems.

    Recurring revenue, earlier warnings and data on how systems perform in the field, which also feeds product development.

    Risks and how to handle them

    • Connectivity at remote sites

      Use the site's existing radio or cellular link.

    Evidence

    • Your websiteApplications and solutions include battery energy storage and utility interconnects, solar grid-tie systems "for ESG", mobile solar power trailers, valve actuation, SCADA, gas analyzers, obstruction lighting and site security; components include the TPDIN2 web-based remote monitor and the Victron Cerbo GX.Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websiteThe Solarcraft Way lists the core values "Never make a customer wait or wonder!", "Be efficient, proactive, and engaged!" and "Continuously improve!". The site also runs two campaigns: "Power Without Waiting" and "Built to Last³" ("Built Smarter, Built Stronger, and Built Longer"; "Supported beyond installation").Source
  • 19

    Solarcraft says it has moved beyond oil and gas into telecom, transportation and utilities, and its products (outdoor UPS, enclosures, walk-in shelters) fit tower, water and wastewater sites. Rivals such as Ameresco Solar and Polar Power market directly to telecom.

    High impactHigh effort First result in 4 quarters Vice President of Sales

    First action

    Pick the market with the most quotes last year.

    How to measure it

    Share of quotes from the new market

    Now
    –
    Target
    20%
    By
    4 quarters

    Steps

    1. 1

      Pick market

      By past quotes.

      Vice President of Sales 2 weeks

    2. 2

      Build page

      Products and proof.

      Director of Marketing & Public Relations 1 month

    3. 3

      Find integrators

      Two partners.

      Vice President of Sales 1 quarter

    4. 4

      Trade show

      One event.

      Director of Marketing & Public Relations 2 quarters

    5. 5

      Campaign

      Email and LinkedIn.

      Director of Marketing & Public Relations ongoing

    6. 6

      Review

      Quotes and wins.

      President quarterly

    First result
    4 quarters
    Cost
    Trade show and marketing budget
    Owner
    Vice President of Sales

    Smallest test

    Quote three telecom tower operators.

    Why it works

    Choose one non-oil market (telecom or water and wastewater), write a dedicated page with case studies and certifications, attend that industry's trade show, and recruit two integrators who already serve it.

    Diversifying beyond oil and gas protects Solarcraft from energy cycles and uses the same products.

    Risks and how to handle them

    • Spreading too thin

      Pick one market for the year.

    Evidence

    • Your websiteCase studies page: "Case studies remove the guesswork. Instead of relying solely on reviews or promises, you can evaluate Solarcraft's track record across different project types". It lists two case studies, both pipeline valve projects; the site has no customer testimonials. The homepage says Solarcraft has "advanced into Telecommunications, Transportation, Utilities, and Surveillance".Source
    • Competitor researchRivals' own homepages: SunWize sells "rugged, pre-engineered systems" with a "Power Ready Express" line, a searchable catalogue, cart and login, webinars, tech notes, a capability statement and a line card; Ameresco Solar promotes "C1D2 Certified Kits", a quote cart and field support for telecom and railway; Polar Power sells DC generators and hybrid solar systems for telecom with application worksheets.Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 20

    The Deploying & Troubleshooting page is a long text guide that still refers to Kyocera and BP panels, and field technicians at remote sites need the right battery, breaker and wiring details for the system in front of them.

    Medium impactLow effort First result in 1 quarter Sales and Service Director

    First action

    Label the next ten systems that ship.

    How to measure it

    Parts and service requests from QR codes

    Now
    –
    Target
    20 a quarter
    By
    3 quarters

    Steps

    1. 1

      Design page

      Per-system template.

      VP of IT and Automation 2 weeks

    2. 2

      Print labels

      Weatherproof QR labels.

      Director of Operations 1 week

    3. 3

      Ship labelled

      All new systems.

      Director of Operations ongoing

    4. 4

      Add videos

      Short install clips.

      Director of Marketing & Public Relations 1 month

    5. 5

      Retrofit

      During inspections.

      Sales and Service Director ongoing

    6. 6

      Measure

      Scans and requests.

      Sales and Service Director monthly

    First result
    1 quarter
    Cost
    Labels and staff time
    Owner
    Sales and Service Director

    Smallest test

    Label ten systems.

    Why it works

    Put a QR label inside each new enclosure door linking to that system's page: drawings, data sheets, battery and part numbers, a short video and a "request service or parts" button. Add labels to existing systems during inspections.

    It brings parts orders and service calls straight back to Solarcraft and makes field work easier for customers.

    Risks and how to handle them

    • Pages go out of date

      Generate them from the build record.

    Evidence

    • Your websiteDeploying & Troubleshooting Your System: written installation guidance (face panels due south, tilt for latitude plus 15 degrees, battery voltage checks) that still refers to "Kyocera and BP solar panels with junction boxes"; no video. The contact form says "We will respond as quickly as possible" with hours "Monday through Friday, 7 AM to 5 PM CST", and the sitemap has eight separate RFQ forms by product line.Source
    • Your websiteThe product catalogue (/shoponline) lists 91 products, from Victron, Deka and Full River components to Solarcraft's own packaged systems: the S200, S400, S800 and S1600 solar power systems, the U480-220, U600-440 and U1200-800 UPS systems, the M9-800 to M45-2400 motor UPS systems, five CID2 AC-UPS units, ten walk-in and open-air E-Structures and 14 enclosure models. The page ends "Call us at (877) 340-1224 for price details".Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
  • 21

    Solarcraft's VP of Strategy & Product Development has appeared on three Pipeliners Podcast episodes about remote valves and battery life, but they sit on a single resources page.

    Medium impactLow effort First result in 1 quarter Director of Marketing & Publi…

    First action

    Cut three clips from episode 350.

    How to measure it

    Followers

    Now
    –
    Target
    +30%
    By
    2 quarters

    Steps

    1. 1

      Pick moments

      Three per episode.

      Director of Marketing & Public Relations 1 week

    2. 2

      Cut clips

      Captioned for LinkedIn.

      Director of Marketing & Public Relations 1 week

    3. 3

      Write summaries

      One page per episode.

      Director of Marketing & Public Relations 1 week

    4. 4

      Record series

      Monthly question.

      Vice President of Strategy & Product Development monthly

    5. 5

      Pitch podcasts

      Telecom and water shows.

      Director of Marketing & Public Relations 1 quarter

    6. 6

      Measure

      Views and enquiries.

      Director of Marketing & Public Relations monthly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Director of Marketing & Public Relations

    Smallest test

    Post one clip this month.

    Why it works

    Cut short clips from each episode for LinkedIn, write a summary page per episode, and record a monthly ten-minute "Ask the expert" video answering one real customer question.

    Expert video builds trust with engineers and gives LinkedIn a steady flow of useful posts.

    Risks and how to handle them

    • Rights to clips

      Ask the podcast host before reposting.

    Evidence

    • Your websitePodcasts page: three Pipeliners Podcast episodes with Solarcraft's Vice President of Strategy & Product Development: 321 "Powering Remote Shutdown Valves", 350 "Optimizing Battery Life" and 351 "Alternative Approaches to Powering Remote Valves".Source
    • Your websiteHomepage: "Established in 1994", a "one-stop manufacturing company" in a 36,000 square foot Sugar Land, Texas facility covering engineering, metal fabrication, panel integration, programming and field service; "We base power requirements on worst-case situations, so you never lose power" and "inspect, test, install, commission, and maintain systems in the field for the life of your systems". LinkedIn is the only social profile linked, and the homepage has no social share image.Source
    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
  • 22

    The archive shows 21 articles in July 2024, then almost nothing until summer 2026. A burst followed by silence looks inactive to buyers checking whether a supplier is current.

    Medium impactLow effort First result in 1 quarter Director of Marketing & Publi…

    First action

    Write the twelve-month topic list.

    How to measure it

    Article traffic

    Now
    –
    Target
    +40%
    By
    3 quarters

    Steps

    1. 1

      List topics

      Twelve months.

      Director of Marketing & Public Relations 1 week

    2. 2

      Assign experts

      Engineers review.

      Vice President of Strategy & Product Development 1 week

    3. 3

      Write monthly

      One article.

      Director of Marketing & Public Relations monthly

    4. 4

      Link products

      Each article to a product.

      Director of Marketing & Public Relations monthly

    5. 5

      Email

      Monthly customer note.

      Director of Marketing & Public Relations monthly

    6. 6

      Review

      Traffic quarterly.

      Director of Marketing & Public Relations quarterly

    First result
    1 quarter
    Cost
    Writing time
    Owner
    Director of Marketing & Public Relations

    Smallest test

    Publish the next article this month.

    Why it works

    Plan twelve months of articles, one a month, tied to the season and to buyer questions (battery life in heat, winter autonomy, hazardous-location rules, lead times), each ending with a relevant product or the sizing tool.

    A steady rhythm keeps search visibility and gives sales a reason to email customers every month.

    Risks and how to handle them

    • Engineers lack time

      Interview them for 20 minutes and write it up.

    Evidence

    • Your websiteArticles archive: August 2026 (2), July 2026 (1), June 2026 (2), July 2024 (21), April 2024 (2), May 2023 (1). Topics include hurricane preparation for solar and UPS systems (June 2026), cold-weather solar, HAZLOC certified systems, PWM vs MPPT controllers, solar tilt angles and a hybrid power trailer that left Texas for Quebec, Canada.Source
    • Your websitePower Without Waiting: a series that "explores the forces changing how midstream projects plan for power" (growing demand, utility constraints, reliability, project planning), with three articles: "Project Risks Have Changed" (July 29, 2026), "The Grid Wasn't Built for This" (August 5) and "Everyone Wants More Power" (August 12), which says "Power planning should begin early enough that project teams still have options when utility timing, cost, or location does not align with the required operational date."Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

Have it built

ProgrammableAgency

1 of the 22 ideas are things Programmable builds and runs for its customers: pages, outreach, prospect lists, booking flows and monitors. Pick one, or send the whole list.

Prospect lists1The list compiled from public sources, verified, deduplicated and delivered to your CRM.

A 30-minute session with the engineer who would build it, not a sales call. You leave with a plan whether or not you hire us.

Book a working session

Usually live within days.

More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Rent the Runway growth strategyDesigner clothing rental: subscriptions of five items per shipment, one-time rentals for events, and resale of pre-loved pieces, from…22 growth ideas
  • REP Fitness growth strategyA Colorado strength equipment brand founded in 2012: power racks and rack builders, benches, barbells, plates, functional trainers, the…22 growth ideas
  • Tourlane growth strategyTailor-made, multi-stop trips planned and booked by native-European travel experts, with flights, hotels and private experiences in one…21 growth ideas
  • Storetasker growth strategyA marketplace of vetted freelance Shopify developers, designers and marketers for ecommerce brands, for projects and monthly retainers…21 growth ideas
  • Outtake growth strategyAn agentic AI platform for next-generation digital risk protection: it finds and takes down impersonation and fraud across domains, social…21 growth ideas
  • Watchmaker Genomics growth strategyDevelops and manufactures NGS library preparation kits, library amplification, Cas9-based normalization, engineered enzymes and qPCR…22 growth ideas
  • Curai Health growth strategyAI-powered virtual primary and urgent care: patients describe symptoms to a medical AI, and licensed clinicians review each case…20 growth ideas
  • Forever 21 growth strategyA digital-first fast-fashion brand selling trend-led women's, men's, plus-size and kids' clothing, accessories and beauty at low prices…21 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on October 21, 2026, and cites them throughout. Solarcraft did not commission, review or endorse it, and Programmable is not affiliated with Solarcraft. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Solarcraft runs its business.

Something wrong, or do you represent Solarcraft? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    List the hidden products, show stock, renew SAM.gov, add share images, promise quote reply times and lighten the homepage; plan the blog rhythm.

  2. Days 31 to 6012 ideas

    Sizing tool, case studies, battery reminders, pre-season inspections, the planning checklist, the hazardous-location hub, the capability statement, valve outreach, reps and the Victron hub; start the QR labels and podcast clips.

  3. Days 61 to 903 ideas

    Commit to bridge power, monitoring subscriptions and a second market.

The research behind the plan

2 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value systems engineered for worst-case conditions. The most cited problem: utility power delays at new sites.

  • One supplier for power, enclosure, integration and field service
  • Not knowing lead times
  • In their words: “remote site”

Market

Competitive landscape

3 competitors compared: SunWize, Ameresco Solar and Polar Power.

  • Gap to exploit: Bridge power for sites waiting on the utility
  • SunWize: Less custom fabrication and field service
  • Ameresco Solar: Kit-led rather than integrated enclosures

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks firstNew accounts get 100,000 free enrichment credits with code BETA100K (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammableMediaAn AI note taker, interpreter and webinar host for your calls (opens programmable.media in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence