ProgrammableMarketing/steinmetzmotors.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 12
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Nov 10, 2026 1 view
  1. Programmable
  2. Playbooks
  3. Steinmetz
Steinmetz logo

growth playbook · Nov 10, 2026

steinmetzmotors.com (opens in a new tab)

Steinmetz growth playbook

Diagnosis

Steinmetz is a five-person Y Combinator (W25) company with a striking product: a 500 kW, 1000V motor controller in 4.8 litres, shipping now, with a 250 kW and a 15 kW model behind it. The site is fast and clean, and the documentation is unusually open for this market. The gap is trust and conversion.

The homepage promises one-click auto-tuning and open-source firmware, but the docs say tuning is still manual and link no code. The product page says SAE J1939, but the CAN guide uses standard IDs. The 'Checkout' buttons show no price, and there are no STEP files, no efficiency maps, no named customers and no application pages.

This playbook first makes every claim match the docs and gives engineers what they need to design the controller in: firmware status, a DBC file, 3D CAD, a clear evaluation offer and a better form. It then builds proof and reach: sourced comparisons, application pages, a motor library, student teams, motor partners and a paid evaluation program, with the MC0-10 as a self-serve product.

Growth Score

6/10

Biggest Opportunity

Turn the openness that already sets Steinmetz apart (public docs, published CAN protocol, promised open firmware) into the fastest path from first visit to a running motor on the bench, so engineers pick the MC0 because it is the easiest to design in.

Biggest Risk

Engineers buying a 500 kW inverter check every claim against the docs. Gaps like manual tuning behind a one-click promise, or J1939 that isn't in the protocol guide, can end an evaluation before sales ever hears about it, while established suppliers such as Cascadia Motion, Helix and Motion Applied win on track record.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Make the firmware promises match the docs: link the code and publish a dated status for one-click tuning

    Decide this week whether the firmware repository goes public now or the homepage wording changes to match what is available.

    High impact First result in 2 weeks
  2. 2

    Fix the J1939 mismatch and publish a DBC file for the CAN protocol

    Correct the protocol line on the MC0-500 page today.

    High impact First result in 1 month
  3. 3

    Replace the price-less 'Checkout' buttons with an evaluation-unit request that states what happens next

    Change the button labels and links on the homepage.

    High impact First result in 2 weeks

02

Your idea portfolio

24 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 8 ideas are marked Unexpected: plays you are unlikely to have tried.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 3Big bets · 9Fill-ins · 9Reconsider · 3
Effort →

Showing 24 of 24 ideas

This week 6

Quick wins with a clear first action.

  • 01

    The homepage sells "One-click auto-tuning" and "Open-source firmware. No more waiting weeks for support.", and the MC0-500 datasheet promises "1-click Motor Tuning". But the MC0-500 software guide (docs version 1.5) says autotuning is "coming via a firmware update in 2026", that gains are tuned by hand, and that the resolver offset is found by trial and error. No page on the site links to firmware source code, a firmware download or a configuration tool. The engineers who evaluate a 500 kW inverter read the docs before they fill in a form, so the two features that set Steinmetz apart from quote-only rivals are the ones they can't check.

    High impactLow effort First result in 2 weeks Founder & CTO

    First action

    Decide this week whether the firmware repository goes public now or the homepage wording changes to match what is available.

    How to measure it

    Docs-to-request conversion

    Now
    –
    Target
    +30% application-review requests from docs visitors
    By
    60 days

    Steps

    1. 1

      List every claim

      Collect every firmware and software claim on the homepage, product pages and datasheet, and mark each Available, Beta or Planned.

      Founder & CTO 1 day

    2. 2

      Decide on the code

      Choose public repository, customer-only access or a dated plan, and pick a licence.

      Founder & CEO 1 day

    3. 3

      Publish the repository

      README, licence, build and flash guide, supported hardware, and a link from the homepage, docs and product pages.

      Firmware Engineer 3 days

    4. 4

      Add the status table

      A dated table on the homepage feature block and the docs index, updated with every release.

      Founder & CTO 1 day

    5. 5

      Write the tuning example

      One real motor, start to finish: resolver offset, pole ratio, torque constant and PI gains, with the values used.

      Firmware Engineer 2 days

    6. 6

      Offer tuning help

      Add "we tune your first motor" to the application-review reply and the MC0-500 page.

      Founder & CEO 1 hour

    7. 7

      Start a changelog

      A release notes page in the docs; link each release from Notes and LinkedIn.

      Firmware Engineer ongoing

    8. 8

      Measure

      Tag contact-form sources from docs and repository links and compare request rates before and after.

      Founder & CEO monthly

    First result
    2 weeks
    Cost
    Staff time only (about a week of founder and firmware time)
    Owner
    Founder & CTO

    Smallest test

    Add the dated status table to the homepage today and link the tuning guide; count docs-to-request conversions for 30 days.

    Why it works

    Close the gap in one week, in three moves. 1) Publish the firmware where it can be seen: a public repository linked from the homepage, the docs and the product pages, with a licence and a build guide. If the code isn't ready to publish, change the wording now to what is true (for example "source available to customers") and add a target date. 2) Add a dated firmware status table to the homepage feature block and the docs index, listing each promised capability as Available, Beta or Planned: auto-tuning, sensorless control, encoder and resolver support, protocol customisation and Ethernet configuration. 3) Until auto-tuning ships, turn the manual process into an offer: a worked tuning example with real EEPROM values in the docs, plus a free "we tune your first motor" remote session for every evaluation buyer. Then announce each firmware release in a changelog.

    For an engineer, a claim the docs contradict is a reason to stop evaluating. A public repository and an honest status table turn the same claims into proof the buyer can check. A repository also brings engineers in through GitHub search, stars and issues, a channel quote-only rivals don't have. The tuning offer removes the main integration pain until the feature ships.

    Ready to use

    ChecklistFirmware status table (homepage and docs)

    Capability | Status | Since / target
    [ ] Resolver feedback (recommended) | Available | docs 1.5
    [ ] Digital encoder feedback | Available? confirm | -
    [ ] Sensorless control | Available? confirm | -
    [ ] One-click auto-tuning | Planned | firmware update, date
    [ ] CAN telemetry and control (standard IDs) | Available | docs 1.5
    [ ] SAE J1939 | Planned? confirm | -
    [ ] Automotive Ethernet configuration | confirm | -
    [ ] Custom communication protocol | Planned | "future versions"
    [ ] Source code | Public / customer-only | repository link
    Last updated: date | Changelog link

    Risks and how to handle them

    • Publishing firmware exposes unfinished code

      Publish a tagged, tested release with a clear status table; keep development branches private.

    • Competitors read the control code

      The advantage is in the power stage, packaging and manufacturing, not the control loop; the homepage already promises open firmware.

    • Tuning sessions take founder time

      Limit to the first motor per evaluation buyer, and turn every session into a motor-library entry (idea 14).

    Evidence

    • Your websiteHomepage (checked November 9, 2026): headline "NEXT GENERATION MOTOR CONTROLLERS & CUSTOM POWER ELECTRONICS"; three 0-Series controllers (MC0-10, 15 kW, coming 2027; MC0-250, 250 kW; MC0-500, 500 kW, available now); features "One-click auto-tuning", "Open source firmware and software allows you to easily integrate this into your system and customize it to your needs" and "Open-source firmware. No more waiting weeks for support."; no link to any code repository; "Proudly Made in America"; no customers, logos or testimonials; no email signup.Source
    • Your documentationMC0-500 Getting Started - Software (docs version 1.5): autotuning and plug-and-play operation are "coming via a firmware update in 2026", so current and velocity gains are tuned by hand; the resolver offset is found by hand-rotating the motor, by trial and error; it recommends third-party CAN tools (cangaroo, Wireshark); the docs link no source code, firmware download or configuration tool, and the MC0-250 section is "Coming Soon".Source
    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
    • Competitor researchCascadia Motion (a BorgWarner company) lists CM200, CM350DZ and CM350SiC inverters plus integrated motor-inverter modules, motors and gearboxes; sells accessories including high-voltage cables and low-voltage connector kits; runs a Student Project Sponsorship program; buyers request a quote.Source
  • 02

    The MC0-500 page lists "CAN with SAE J1939", but the CAN protocol guide says the controller "uses Standard CAN IDs" and documents no J1939 messages. The messages are in tables only, with no DBC file. Truck, bus and off-highway teams, three of the markets the MC0-500 page names, check this line first, and every integrator has to retype the tables into their own tools.

    High impactLow effort First result in 1 month Firmware Engineer

    First action

    Correct the protocol line on the MC0-500 page today.

    How to measure it

    Commercial-vehicle requests

    Now
    –
    Target
    +25%
    By
    90 days

    Steps

    1. 1

      Correct the line

      State standard CAN IDs and the J1939 status on the MC0-500 page.

      Founder & CTO 1 hour

    2. 2

      Build the DBC

      Generate it from the protocol tables, including scaling and units.

      Firmware Engineer 1 day

    3. 3

      Test it

      Load it in cangaroo and Wireshark against a live controller.

      Generalist Hardware/Firmware Engineer 1 day

    4. 4

      Fix the summary

      Add the missing 0x31C entry to the TX summary table.

      Firmware Engineer 1 hour

    5. 5

      Publish and version

      DBC download on the CAN guide, versioned with the docs.

      Firmware Engineer 1 hour

    6. 6

      Plan J1939

      Decide whether and when to add a J1939 profile, and show it in the status table.

      Founder & CTO 1 week

    First result
    1 month
    Cost
    $0
    Owner
    Firmware Engineer

    Smallest test

    Publish the DBC file and count downloads for 30 days.

    Why it works

    Make the product page say exactly what ships today (standard 11-bit IDs, with J1939 Planned or Available as appropriate), and add J1939 to the firmware status table (idea 1). Generate a DBC file from the protocol tables and publish it next to the CAN guide, versioned with each docs release. Add the TX table entry the guide currently leaves out (0x31C appears in the body but not in the summary).

    A precise protocol line keeps Steinmetz on commercial-vehicle shortlists instead of being dropped on review. A DBC file cuts hours of integration work and puts the telemetry straight into the CAN tools the docs already recommend.

    Risks and how to handle them

    • Removing J1939 loses some leads

      A dated plan keeps them; an incorrect claim loses them later in the deal.

    Builds on

    Evidence

    • Your documentationCAN Protocol page: "The Steinmetz motor controller uses Standard CAN IDs"; messages are documented in tables only, with no DBC file; "In future versions, the ability to customize the communication protocol will be possible." The MC0-500 product page lists "CAN with SAE J1939 and Automotive Ethernet 100BASE-T1".Source
    • Your websiteMC0-500 page: "Available now"; calls to action "Request application review", "Download datasheet" and "Send requirements"; a 2D mechanical drawing (PDF) but no STEP or other 3D CAD; applications from EVs and motorsport to trucks and buses, aircraft, eVTOL and defense, mining and robotics, marine and construction; no named customers; no price, lead time or warranty; the FAQ asks buyers to contact Steinmetz for the "current safety, EMC, and certification roadmap" before making compliance assumptions.Source
  • 03

    The homepage shows a "Checkout" button under the MC0-250 and the MC0-500 but no price, while the product pages and /products have no checkout at all and send buyers to the contact form. A buyer who clicks expecting to order gets a different journey from the one promised.

    High impactLow effort First result in 2 weeks Founder & CEO

    First action

    Change the button labels and links on the homepage.

    How to measure it

    Evaluation requests from the homepage

    Now
    –
    Target
    +20%
    By
    60 days

    Steps

    1. 1

      Relabel

      "Request an evaluation unit" on both models.

      Founder & CEO 1 hour

    2. 2

      Preselect

      Pass product and intent to the contact form.

      Generalist Hardware/Firmware Engineer 2 hours

    3. 3

      Explain next steps

      Three lines: reply time, review call, quote with lead time.

      Founder & CEO 1 hour

    4. 4

      Decide on a price band

      Evaluation price band or "priced per application".

      Founder & CEO 1 day

    5. 5

      Add the MC0-250 datasheet date

      Replace "Datasheet Coming Soon" with a date or a notify option.

      Electrical Engineer 1 hour

    6. 6

      Track

      Clicks and form submissions by button.

      Founder & CEO monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Relabel the two buttons today and compare requests month on month.

    Why it works

    Rename the button to what really happens, "Request an evaluation unit", and link it to the contact form with the product and "evaluation" preselected. Under each button, state the next steps: reply within one business day, an application review call, a quote with lead time. Add an indicative price band for evaluation units if the founders are comfortable (for example "evaluation units from $X"), or "priced per application" if not. Keep "Checkout" for a product that really has one (idea 20).

    A clear next step that matches the button label builds trust with technical buyers, and a price band lets small teams qualify themselves before the call.

    Risks and how to handle them

    • A price band anchors negotiations

      Give it for evaluation units only, not volume pricing.

    Evidence

    • Your websiteHomepage pricing blocks: MC0-10 "Coming Soon"; MC0-250 and MC0-500 each show a "Checkout" button with no price; MC0-250 "Datasheet Coming Soon". The product pages and /products show no price and no checkout, and send buyers to the contact form ("Request application review", "Send requirements").Source
    • Your websiteContact form: required Name, Company, Email, Application area (Automotive / EV platform, Commercial vehicle / fleet, Aerospace / defense, Industrial / robotics, Custom power electronics) and Project details; optional Phone and Expected annual volume (Prototype / evaluation, 1-100, 101-1,000, 1,001-10,000, 10,000+ units); no stated response time, phone number or address. Product pages link to it with product and source parameters.Source
  • 04

    The product pages sell to motorsport builds, marine craft, mining and construction, but the contact form's Application area only offers automotive, commercial vehicle, aerospace/defense, industrial/robotics and custom power electronics. There is no product field, no motor or voltage question and no promised reply time. The pages already pass product and source parameters, but a visitor can't see or confirm them.

    Medium impactLow effort First result in 2 weeks Founder & CEO

    First action

    Add the three markets to the dropdown.

    How to measure it

    Form completion rate

    Now
    –
    Target
    +15%
    By
    60 days

    Steps

    1. 1

      Add markets

      Motorsport, marine, mining/construction/off-highway.

      Generalist Hardware/Firmware Engineer 1 hour

    2. 2

      Add product choice

      Prefilled from the product-page link.

      Generalist Hardware/Firmware Engineer 2 hours

    3. 3

      Add technical fields

      Optional pack voltage, motor type and peak power.

      Founder & CTO 2 hours

    4. 4

      Promise a reply time

      One business day, shown above the button.

      Founder & CEO 1 hour

    5. 5

      Auto-confirm

      Confirmation email with datasheet, docs and DBC links.

      Founder & CEO 2 hours

    6. 6

      Review weekly

      Requests by market, product and volume.

      Founder & CEO weekly

    First result
    2 weeks
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Add the three markets today and watch how many requests choose them.

    Why it works

    Add Motorsport / performance, Marine and Mining / construction / off-highway to Application area. Add a visible product choice (MC0-10, MC0-250, MC0-500, not sure) prefilled from the page, and three optional technical fields the products page already asks for in text: pack voltage, motor type and peak power. Promise a reply within one business day and send an automatic confirmation with the docs links.

    Buyers who see their market listed feel the product is for them, and the technical fields let the founders reply with a fit answer on the first email instead of a list of questions.

    Ready to use

    ChecklistContact form changes

    [ ] Application area: add Motorsport / performance, Marine, Mining / construction / off-highway
    [ ] Product: MC0-10 / MC0-250 / MC0-500 / Not sure (prefilled)
    [ ] Optional: pack voltage, motor type, peak power
    [ ] "We reply within one business day"
    [ ] Auto-confirmation with datasheet, docs and DBC links
    [ ] Keep source tracking from product and blog links

    Risks and how to handle them

    • More fields lower completion

      Keep the new technical fields optional.

    Evidence

    • Your websiteContact form: required Name, Company, Email, Application area (Automotive / EV platform, Commercial vehicle / fleet, Aerospace / defense, Industrial / robotics, Custom power electronics) and Project details; optional Phone and Expected annual volume (Prototype / evaluation, 1-100, 101-1,000, 1,001-10,000, 10,000+ units); no stated response time, phone number or address. Product pages link to it with product and source parameters.Source
    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
    • Your websiteMC0-500 page: "Available now"; calls to action "Request application review", "Download datasheet" and "Send requirements"; a 2D mechanical drawing (PDF) but no STEP or other 3D CAD; applications from EVs and motorsport to trucks and buses, aircraft, eVTOL and defense, mining and robotics, marine and construction; no named customers; no price, lead time or warranty; the FAQ asks buyers to contact Steinmetz for the "current safety, EMC, and certification roadmap" before making compliance assumptions.Source
  • 05

    The MC0-500 page offers a 2D mechanical drawing but no STEP or other 3D model. Packaging is the reason to buy a 4.8-litre, 500 kW inverter, and a mechanical engineer's first step is to drop the 3D model into the vehicle CAD. The datasheet already names every mating connector and fitting, but they are spread over several pages.

    Medium impactLow effort First result in 1 month Electrical Engineer

    First action

    Export a simplified STEP of the MC0-500 enclosure.

    How to measure it

    CAD downloads

    Now
    –
    Target
    50 downloads, 10% to requests
    By
    90 days

    Steps

    1. 1

      Simplify the model

      Envelope, holes, ports and connectors only.

      Electrical Engineer 1 day

    2. 2

      Write the integration BOM

      Mating connectors, fittings and grounding parts from the datasheet.

      Electrical Engineer 1 day

    3. 3

      Choose the gate

      Free download or work email only.

      Founder & CEO 1 hour

    4. 4

      Publish

      MC0-500 page, docs Mechanical chapter and the datasheet.

      Generalist Hardware/Firmware Engineer 2 hours

    5. 5

      Follow up

      Short note to each downloader offering an application review.

      Founder & CEO weekly

    6. 6

      Repeat for MC0-250

      Publish its model with its datasheet.

      Electrical Engineer when the datasheet ships

    First result
    1 month
    Cost
    $0
    Owner
    Electrical Engineer

    Smallest test

    Add the STEP to the MC0-500 page and count downloads for a month.

    Why it works

    Publish a simplified STEP model (outer envelope, mounting holes, connector and coolant port positions) on the MC0-500 page and in the docs, free to download or behind a light email gate. Add a one-page bill of materials for integration: high-voltage, low-voltage and Ethernet mating connectors, coolant fittings and grounding hardware, with part numbers from the datasheet.

    A 3D model in the buyer's CAD puts the MC0-500 into the design from day one, and every download is a warm lead from an engineer actively packaging a drive.

    Risks and how to handle them

    • Design details exposed

      Publish an envelope model with no internals.

    Evidence

    • Your websiteMC0-500 page: "Available now"; calls to action "Request application review", "Download datasheet" and "Send requirements"; a 2D mechanical drawing (PDF) but no STEP or other 3D CAD; applications from EVs and motorsport to trucks and buses, aircraft, eVTOL and defense, mining and robotics, marine and construction; no named customers; no price, lead time or warranty; the FAQ asks buyers to contact Steinmetz for the "current safety, EMC, and certification roadmap" before making compliance assumptions.Source
    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
  • 06

    Steinmetz is hiring a Firmware Engineer, a Generalist Hardware/Firmware engineer and an Electrical Engineer in San Francisco ($100K-$175K), but neither the careers page nor the YC job board shows any description, responsibilities or requirements. Meanwhile the docs list the work waiting: auto-tuning, protocol customisation, the MC0-250 docs and the MC0-10.

    Medium impactLow effort First result in 1 month Founder & CTO

    First action

    Draft the firmware role from the docs' "coming soon" list.

    How to measure it

    Qualified applicants

    Now
    –
    Target
    2x per role
    By
    60 days

    Steps

    1. 1

      List the work

      Six-month goals per role, from the docs and roadmap.

      Founder & CTO 1 day

    2. 2

      Write three posts

      Problem, outcomes, stack, process, pay range.

      Founder & CTO 1 day

    3. 3

      Check for secrets

      Remove customer and unreleased-product details.

      Founder & CEO 1 hour

    4. 4

      Publish everywhere

      Careers page and YC job board.

      Founder & CEO 1 hour

    5. 5

      Share

      LinkedIn, X and engineering communities.

      Founder & CEO 1 day

    6. 6

      Track

      Applicants and interview pass rate per role.

      Founder & CEO monthly

    First result
    1 month
    Cost
    $0
    Owner
    Founder & CTO

    Smallest test

    Publish the firmware role first and compare applicants with the other two.

    Why it works

    Write each role around the real work in the next six months, without confidential detail: ship auto-tuning and sensorless modes (firmware), bring up the MC0-250 and MC0-10 (generalist), and the next power stage and custom DC-DC projects (electrical). Add what the team has built (500 kW in 4.8 L, in-house test cells), the stack, how hiring works, and a link to the public firmware repository (idea 1) as a work sample. Publish the same text on the careers page and the YC job board.

    Strong hardware engineers choose on the problem, and a five-person team needs every applicant to self-select. Customers' engineers read job posts too, so a clear roadmap there also signals momentum.

    Risks and how to handle them

    • Roadmap leaks to competitors

      Describe problems, not designs or dates.

    Builds on

    Evidence

    • HiringCareers page and Y Combinator job board (checked November 9, 2026): three open roles in San Francisco, Firmware Engineer, Generalist Hardware/Firmware and Electrical Engineer, each $100K-$175K with new grads welcome; none has a published description, responsibilities or requirements.Source
    • Your documentationMC0-500 Getting Started - Software (docs version 1.5): autotuning and plug-and-play operation are "coming via a firmware update in 2026", so current and velocity gains are tuned by hand; the resolver offset is found by hand-rotating the motor, by trial and error; it recommends third-party CAN tools (cangaroo, Wireshark); the docs link no source code, firmware download or configuration tool, and the MC0-250 section is "Coming Soon".Source
    • Y CombinatorY Combinator profile: Winter 2025 batch, founded 2024, team size 5, San Francisco; the first product is a motor controller claimed at about 3x the power density of current solutions at similar or better efficiency and competitive cost. The YC launch post says the founders previously worked at Tesla and invites builders of any electric vehicle, from trains and boats to cranes, planes and tractors.Source

This quarter 12

The core plays for the next three months.

  • 07

    The MC0-500 needs Amphenol high-voltage mating connectors, a Hirose low-voltage mate, a TE Ethernet mate and coolant fittings, all listed by part number in the datasheet, which each buyer then has to source. Cascadia Motion sells high-voltage cables and low-voltage connector kits as accessories.

    Medium impactMedium effort First result in 1 month Founder & CEO

    First action

    Price the parts for one kit from distributors.

    How to measure it

    Kit attach rate

    Now
    –
    Target
    60% of evaluation orders
    By
    2 quarters

    Steps

    1. 1

      List the parts

      From the datasheet, by cable size.

      Electrical Engineer 1 day

    2. 2

      Build a harness

      Low-voltage harness with CAN breakout.

      Generalist Hardware/Firmware Engineer 1 week

    3. 3

      Price it

      Cost plus handling, with a kit part number.

      Founder & CEO 1 day

    4. 4

      Document it

      Kit page in the docs with wiring diagram.

      Electrical Engineer 2 days

    5. 5

      Offer it

      On every quote and the MC0-500 page.

      Founder & CEO ongoing

    6. 6

      Review

      Attach rate and support questions saved.

      Founder & CEO quarterly

    First result
    1 month
    Cost
    Parts inventory for a few kits
    Owner
    Founder & CEO

    Smallest test

    Offer the kit on the next three quotes.

    Why it works

    Bundle the mating parts into an integration kit: high-voltage connectors for the buyer's cable size, a low-voltage harness with flying leads and a CAN breakout, the Ethernet mate and coolant fittings. Offer it on every evaluation quote and as a line item on the product page.

    It removes days of parts sourcing from the first bench test, raises order value and makes the 'running in minutes' promise more real.

    Risks and how to handle them

    • Inventory tied up

      Build kits to order at first.

    Builds on

    Evidence

    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
    • Competitor researchCascadia Motion (a BorgWarner company) lists CM200, CM350DZ and CM350SiC inverters plus integrated motor-inverter modules, motors and gearboxes; sells accessories including high-voltage cables and low-voltage connector kits; runs a Student Project Sponsorship program; buyers request a quote.Source
  • 08

    The homepage chart puts the MC0-250 at 104 kW/L against a Tesla Model 3, the Cascadia CM200DZ, the Helix MCU1200 and a BMW i3, with no sources or method. The About page says up to 2.3x and the YC profile about 3x. The MC0-250 has no datasheet yet, while the MC0-500, which ships now, is rated at 100 kW/L in its own datasheet. Cascadia's current inverter list now includes the CM350DZ and CM350SiC.

    High impactMedium effort First result in 1 quarter Founder & CTO

    First action

    Collect a source for each number on the chart.

    How to measure it

    Comparison-page requests

    Now
    –
    Target
    10 a quarter
    By
    2 quarters

    Steps

    1. 1

      Source each figure

      Rival datasheets or teardown publications.

      Electrical Engineer 3 days

    2. 2

      Define the method

      Continuous vs peak power, volume boundary.

      Founder & CTO 1 day

    3. 3

      Add current models

      Rivals' current inverters, not only older ones.

      Electrical Engineer 2 days

    4. 4

      Write the page

      Table, method, sources, MC0-500 first.

      Founder & CEO 3 days

    5. 5

      Align the multiple

      One figure on homepage, About and YC.

      Founder & CEO 1 hour

    6. 6

      Legal check

      Comparative claims and trademarks reviewed.

      Founder & CEO 1 week

    7. 7

      Refresh

      Twice a year, dated.

      Electrical Engineer 6 months

    First result
    1 quarter
    Cost
    Staff time and a legal review
    Owner
    Founder & CTO

    Smallest test

    Add sources and the method as a footnote under the homepage chart.

    Why it works

    Publish a "1000V inverter power density, compared" page: each figure with its source, the volume and power definitions used (continuous or peak, with or without connectors), the MC0-500 as the lead with its datasheet figure, and current rival models. Use one consistent multiple across homepage, About and YC. Link the chart to the page.

    Engineers trust numbers they can check, and comparison searches ("inverter power density", rival model names) are high intent. A sourced page also stops the three different multiples from looking like inflation.

    Risks and how to handle them

    • A rival disputes a figure

      Cite their own published numbers and date the page.

    Evidence

    • Your websiteHomepage "Power Density Comparison" chart: "Steinmetz MC0-250: 104kW/L", "Tesla Model 3: 65kW/L", "Cascadia CM200DZ: 58kW/L", "Helix MCU1200: 51kW/L" and "BMW i3: 18.5kW/L", with no sources or test method shown. The About page claims up to 2.3x better power density than traditional competitors.Source
    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
    • Y CombinatorY Combinator profile: Winter 2025 batch, founded 2024, team size 5, San Francisco; the first product is a motor controller claimed at about 3x the power density of current solutions at similar or better efficiency and competitive cost. The YC launch post says the founders previously worked at Tesla and invites builders of any electric vehicle, from trains and boats to cranes, planes and tractors.Source
    • Competitor researchCascadia Motion (a BorgWarner company) lists CM200, CM350DZ and CM350SiC inverters plus integrated motor-inverter modules, motors and gearboxes; sells accessories including high-voltage cables and low-voltage connector kits; runs a Student Project Sponsorship program; buyers request a quote.Source
  • 09

    The MC0-500 and MC0-250 pages list six or more markets (motorsport and performance builds, trucks and buses, aircraft and eVTOL, mining and construction, robotics, marine), but the 23-URL sitemap has no application or industry page. Buyers search by their own problem ("inverter for electric boat", "EV race car motor controller"), not by model number.

    High impactMedium effort First result in 1 quarter Founder & CEO

    First action

    Pick the two markets with the most requests so far.

    How to measure it

    Application-page requests

    Now
    –
    Target
    15 a quarter
    By
    2 quarters

    Steps

    1. 1

      Rank markets

      By past requests and fit.

      Founder & CEO 1 day

    2. 2

      Write a template

      Constraints, fit, integration, docs, form.

      Founder & CEO 1 day

    3. 3

      Motorsport page

      MC0-250 and MC0-500 for track and drift builds.

      Founder & CTO 1 week

    4. 4

      Marine page

      Sealing, cooling and noise.

      Electrical Engineer 1 week

    5. 5

      Commercial and off-highway

      Duty cycle and protocol.

      Founder & CTO 2 weeks

    6. 6

      Link and measure

      From product pages and Notes; track by source.

      Generalist Hardware/Firmware Engineer ongoing

    First result
    1 quarter
    Cost
    Writing time
    Owner
    Founder & CEO

    Smallest test

    Publish the motorsport page and track its requests for 60 days.

    Why it works

    Write one page per market: the sizing that matters (voltage, continuous power, duty cycle, cooling, environment), which MC0 fits, an integration sketch, relevant docs and a market-specific form link. Start with motorsport (the MC0-250 lists track and drift builds) and marine (where IP67, quiet operation and density matter), then commercial vehicles and off-highway.

    Market pages match how engineers search and show them that their constraints are understood, and they give each market's requests a source to measure.

    Risks and how to handle them

    • Thin pages

      Include real sizing numbers and diagrams on each.

    Evidence

    • Your websiteSitemap (23 URLs, checked November 9, 2026): home, about, products, custom power electronics, contact, careers, documentation, three product pages, the blog with two posts and ten docs pages. No pricing, application or industry pages, case studies, comparison pages, motor compatibility list or downloads page.Source
    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
    • Your websiteMC0-500 page: "Available now"; calls to action "Request application review", "Download datasheet" and "Send requirements"; a 2D mechanical drawing (PDF) but no STEP or other 3D CAD; applications from EVs and motorsport to trucks and buses, aircraft, eVTOL and defense, mining and robotics, marine and construction; no named customers; no price, lead time or warranty; the FAQ asks buyers to contact Steinmetz for the "current safety, EMC, and certification roadmap" before making compliance assumptions.Source
  • 10

    Notes has two strong posts in seven months, both by the founder and CEO. The newest measures an 8 kHz 2-level inverter's 16 kHz whine at 63 dB above ambient against Steinmetz's 31.25 kHz 3-level inverter with no audible peaks. That is original data rivals don't publish, but there is no email subscribe or RSS, so readers have no way to come back.

    Medium impactLow effort First result in 1 quarter Founder & CEO

    First action

    Add an email subscribe box and RSS to Notes.

    How to measure it

    Notes subscribers

    Now
    –
    Target
    300
    By
    2 quarters

    Steps

    1. 1

      Add subscribe and RSS

      On Notes and at the end of each post.

      Generalist Hardware/Firmware Engineer 1 day

    2. 2

      Plan six topics

      From existing test-cell data.

      Founder & CTO 1 day

    3. 3

      Write monthly

      Data, chart, method, docs link.

      Founder & CEO monthly

    4. 4

      Share

      LinkedIn, X and engineering forums.

      Founder & CEO monthly

    5. 5

      Email

      Short monthly note to subscribers.

      Founder & CEO monthly

    6. 6

      Measure

      Subscribers and requests tagged from Notes.

      Founder & CEO quarterly

    First result
    1 quarter
    Cost
    A few hours a month
    Owner
    Founder & CEO

    Smallest test

    Add the subscribe box this week and count sign-ups from the whine post.

    Why it works

    Commit to one measured note a month from the test cells: derating with coolant temperature, efficiency at partial load, resolver vs sensorless start-up, EMI scans, thermal soak. Each note has data, a chart and a link to the relevant docs. Add an email subscribe and RSS feed, and post each note to LinkedIn and X.

    Engineers trust test data, and a mailing list keeps evaluators warm through long design cycles.

    Risks and how to handle them

    • Founder time

      Rotate authors across the engineering team.

    Evidence

    • Your blogNotes: two posts by the founder and CEO, "What Is a Motor Controller / Inverter?" (April 22, 2026, about 1,600 words) and "Why Power Electronics Whine (And How to Stop It)" (November 5, 2026), which measures an 8 kHz 2-level inverter with a dominant 16 kHz tone 63 dB above ambient against Steinmetz's 31.25 kHz 3-level inverter with no peaks in the audible band. No email subscribe or RSS option.Source
    • Public profilesResearch data: steinmetzmotors.com registered November 2024; homepage headline changed from "Hardware for the NextGeneration of Vehicles" to "NEXT GENERATION MOTOR CONTROLLERS" and Google Analytics added since November 2025; company profiles on LinkedIn and X; no YouTube or Instagram found; no Hacker News mentions and no news mentions in the last 30 days.Source
  • 11

    Cascadia Motion runs a Student Project Sponsorship program. Steinmetz is hiring three engineers with new grads welcome, and its MC0-250 targets motorsport builds. Student teams pick an inverter, document it and graduate into the EV, aerospace and robotics companies Steinmetz sells to.

    Medium impactMedium effort First result in 2 quarters Founder & CEO

    First action

    Check team competition rules for voltage and power limits, and pick three teams.

    How to measure it

    Student-team leads and hires

    Now
    –
    Target
    3 teams, 1 hire, 5 leads
    By
    3 quarters

    Steps

    1. 1

      Check rules

      Voltage and power limits per competition.

      Electrical Engineer 2 days

    2. 2

      Set terms

      Loan or discount, support and content in return.

      Founder & CEO 1 day

    3. 3

      Publish a page

      Student program page with an application form.

      Founder & CEO 2 days

    4. 4

      Pick teams

      Three teams with strong results.

      Founder & CTO 1 month

    5. 5

      Support

      Tuning sessions and a shared channel.

      Firmware Engineer ongoing

    6. 6

      Recruit

      Invite members to the open roles.

      Founder & CEO ongoing

    First result
    2 quarters
    Cost
    A few loaned units and support time
    Owner
    Founder & CEO

    Smallest test

    Sponsor one local team this season.

    Why it works

    Offer a small number of discounted or loaned controllers (the MC0-250 when it ships, or the MC0-500 where team rules allow), with tuning support, to university electric racing, solar car or vehicle teams. In return ask for build logs, data and a team-written Note. Invite team members to apply for the open roles.

    Students become the engineers who choose inverters at their next company, and each team produces public build content. It also fills the new-grad-friendly roles from people who already know the product.

    Risks and how to handle them

    • Support load

      Limit to three teams and one shared channel.

    Evidence

    • Competitor researchCascadia Motion (a BorgWarner company) lists CM200, CM350DZ and CM350SiC inverters plus integrated motor-inverter modules, motors and gearboxes; sells accessories including high-voltage cables and low-voltage connector kits; runs a Student Project Sponsorship program; buyers request a quote.Source
    • HiringCareers page and Y Combinator job board (checked November 9, 2026): three open roles in San Francisco, Firmware Engineer, Generalist Hardware/Firmware and Electrical Engineer, each $100K-$175K with new grads welcome; none has a published description, responsibilities or requirements.Source
    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
  • 12

    The MC0-10 page says the 15 kW, 1.2 kg controller is "currently in development" for "robotics, automation, and light electric vehicles", with "Expected availability: 2027". Its only buttons are "View Available Products" and "Contact Sales", so interest from a new, high-volume market leaves no trace.

    Medium impactLow effort First result in 1 month Founder & CEO

    First action

    Put a waitlist form on the MC0-10 page.

    How to measure it

    Waitlist sign-ups

    Now
    –
    Target
    200
    By
    2 quarters

    Steps

    1. 1

      Build the form

      Five fields, on the MC0-10 page and homepage.

      Generalist Hardware/Firmware Engineer 1 day

    2. 2

      Write the welcome

      Preview specs and what happens next.

      Founder & CEO 1 hour

    3. 3

      Promote

      Notes, LinkedIn, X and robotics communities.

      Founder & CEO 2 weeks

    4. 4

      Read the answers

      Feature and volume patterns.

      Founder & CTO monthly

    5. 5

      Update quarterly

      Progress note to the list.

      Founder & CEO quarterly

    6. 6

      Offer first units

      Evaluation units to the best-fit sign-ups.

      Founder & CEO at launch

    First result
    1 month
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Add the form and count sign-ups in a month.

    Why it works

    Add a waitlist form to the MC0-10 page and the homepage block: email, application, voltage, expected volume and the one feature they need most (air cooling, sensorless, connector type). Send waitlist members early specs, a datasheet preview and first access to evaluation units.

    A waitlist measures demand before launch, shapes the final spec around real buyers and gives the launch a ready audience.

    Risks and how to handle them

    • Launch slips and the list cools

      Send honest quarterly updates.

    Evidence

    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
    • Your websiteHomepage pricing blocks: MC0-10 "Coming Soon"; MC0-250 and MC0-500 each show a "Checkout" button with no price; MC0-250 "Datasheet Coming Soon". The product pages and /products show no price and no checkout, and send buyers to the contact form ("Request application review", "Send requirements").Source
  • 13

    The MC0-500 page sells to aircraft, eVTOL, defense and commercial vehicles, markets where compliance decides the shortlist, but its FAQ only tells buyers to contact Steinmetz for the "current safety, EMC, and certification roadmap" before making compliance assumptions. Every regulated buyer has to ask the same question by email.

    High impactMedium effort First result in 1 quarter Electrical Engineer

    First action

    List the tests already done in the test cells.

    How to measure it

    Regulated-market requests

    Now
    –
    Target
    +30%
    By
    2 quarters

    Steps

    1. 1

      Inventory tests

      Done, in progress, planned.

      Electrical Engineer 2 days

    2. 2

      Set the plan

      EMC, vibration and safety process with target quarters.

      Founder & CTO 1 week

    3. 3

      Write the page

      Tested, planned and available under NDA.

      Electrical Engineer 2 days

    4. 4

      Check wording

      No claim beyond tested results.

      Founder & CEO 1 day

    5. 5

      Link it

      From product pages, FAQ and the form reply.

      Generalist Hardware/Firmware Engineer 1 hour

    6. 6

      Update

      Each quarter with new results.

      Electrical Engineer quarterly

    First result
    1 quarter
    Cost
    Staff time; test costs as already planned
    Owner
    Electrical Engineer

    Smallest test

    Add a 'tested today' list to the MC0-500 FAQ.

    Why it works

    Publish a one-page roadmap: what is tested today (for example IP67 sealing, temperature range, connector interlock loop, active discharge time), what testing is planned and when (EMC, vibration, functional-safety process), and what documentation is available under NDA. Claim nothing that hasn't been tested, and date the page.

    A clear roadmap lets regulated programs plan around Steinmetz rather than rule it out, and it answers the most repeated pre-sales question once.

    Risks and how to handle them

    • A planned date slips

      Use quarters, not days, and update openly.

    Evidence

    • Your websiteMC0-500 page: "Available now"; calls to action "Request application review", "Download datasheet" and "Send requirements"; a 2D mechanical drawing (PDF) but no STEP or other 3D CAD; applications from EVs and motorsport to trucks and buses, aircraft, eVTOL and defense, mining and robotics, marine and construction; no named customers; no price, lead time or warranty; the FAQ asks buyers to contact Steinmetz for the "current safety, EMC, and certification roadmap" before making compliance assumptions.Source
    • Your websiteAbout page: mission "engineering the most efficient and reliable power electronics in the world"; builds, tests and iterates in its own labs and test cells and manufactures in America; no founding date, location, team or customers.Source
  • 14

    Bringing up an MC0-500 today means writing the resolver offset, pole ratio, torque constant and PI gains to EEPROM, with the resolver offset found by trial and error. Every customer repeats this for the same handful of popular motors, and the sitemap has no motor compatibility list.

    High impactMedium effort First result in 1 quarter Firmware Engineer

    First action

    Write up the motors already tuned in the test cells.

    How to measure it

    Motor library entries

    Now
    –
    Target
    10 motors
    By
    2 quarters

    Steps

    1. 1

      Set the template

      Motor, sensor, EEPROM values, conditions, chart.

      Firmware Engineer 1 day

    2. 2

      Write existing entries

      Motors already run in the test cells.

      Firmware Engineer 1 week

    3. 3

      Ask customers

      Permission to publish their tuned settings.

      Founder & CEO ongoing

    4. 4

      Publish

      Docs section with one page per motor.

      Generalist Hardware/Firmware Engineer 1 week

    5. 5

      Load into firmware

      Starting points for auto-tuning.

      Firmware Engineer 1 quarter

    6. 6

      Measure

      Traffic and requests per motor page.

      Founder & CEO quarterly

    First result
    1 quarter
    Cost
    Engineering time
    Owner
    Firmware Engineer

    Smallest test

    Publish one motor page with full settings.

    Why it works

    Each time Steinmetz or a customer tunes a motor, save the settings (with the customer's permission) as a library entry: motor model, sensor type, EEPROM values, test conditions, a short performance chart. Publish the library in the docs, one page per motor, and later load it into the auto-tuning flow as starting points.

    It turns a painful step into a copy-paste for the next buyer, and each motor page is found by engineers searching for that motor plus "inverter" or "controller".

    Risks and how to handle them

    • Settings unsafe on a different setup

      Mark them as starting points with test conditions and limits.

    Builds on

    Evidence

    • Your documentationMC0-500 Getting Started - Software (docs version 1.5): autotuning and plug-and-play operation are "coming via a firmware update in 2026", so current and velocity gains are tuned by hand; the resolver offset is found by hand-rotating the motor, by trial and error; it recommends third-party CAN tools (cangaroo, Wireshark); the docs link no source code, firmware download or configuration tool, and the MC0-250 section is "Coming Soon".Source
    • Your websiteSitemap (23 URLs, checked November 9, 2026): home, about, products, custom power electronics, contact, careers, documentation, three product pages, the blog with two posts and ten docs pages. No pricing, application or industry pages, case studies, comparison pages, motor compatibility list or downloads page.Source
  • 15

    Cascadia Motion and Helix sell motors and inverters together, so their buyers get one validated drive. Steinmetz sells only the inverter, which leaves the buyer to match and tune the motor themselves.

    High impactMedium effort First result in 2 quarters Founder & CEO

    First action

    List five motor makers whose motors fit the MC0-500 power range.

    How to measure it

    Partner pairings

    Now
    –
    Target
    3 published pairings
    By
    3 quarters

    Steps

    1. 1

      Shortlist makers

      Power, voltage and market fit.

      Founder & CTO 1 week

    2. 2

      Reach out

      Offer free test-cell validation.

      Founder & CEO 1 month

    3. 3

      Test pairings

      Torque, efficiency and thermal runs.

      Electrical Engineer 2 weeks each

    4. 4

      Publish joint sheets

      On both sites and in the motor library.

      Firmware Engineer 1 week each

    5. 5

      Agree referrals

      Simple mutual referral terms.

      Founder & CEO 1 week

    6. 6

      Review

      Leads per partner.

      Founder & CEO quarterly

    First result
    2 quarters
    Cost
    Test-cell time
    Owner
    Founder & CEO

    Smallest test

    Validate one pairing and publish the joint sheet.

    Why it works

    Approach independent motor makers whose products fit the MC0-250 and MC0-500 power range. Test each pairing in the Steinmetz test cells, publish a joint data sheet (torque and efficiency curves, settings from the motor library) and list it on both companies' sites. Refer motor buyers to each other.

    Validated combinations give Steinmetz the one-stop drive that rivals offer without building motors, and each partner's customers become a lead source.

    Risks and how to handle them

    • Partner also sells a rival inverter

      Non-exclusive pairings judged on published data.

    Builds on

    Evidence

    • Competitor researchCascadia Motion (a BorgWarner company) lists CM200, CM350DZ and CM350SiC inverters plus integrated motor-inverter modules, motors and gearboxes; sells accessories including high-voltage cables and low-voltage connector kits; runs a Student Project Sponsorship program; buyers request a quote.Source
    • Competitor researchHelix sells Stock (off-the-shelf, no NRE for sample quantities), Configured and Custom motors and inverters for automotive, aerospace, marine, defence and motorsport, with a downloadable application requirements sheet. Motion Applied's MCU-600 800V SiC inverter (6.4 kg, up to 99% efficiency) offers a product summary and a long-form datasheet download.Source
    • Your websiteAbout page: mission "engineering the most efficient and reliable power electronics in the world"; builds, tests and iterates in its own labs and test cells and manufactures in America; no founding date, location, team or customers.Source
  • 16

    The products page asks buyers for pack voltage, motor type, power levels, cooling, environment, communication interface and volume, but only as text before a "Contact sales" link. The datasheet warns that ratings derate with temperature, voltage, coolant flow, cable size and switching frequency.

    Medium impactMedium effort First result in 1 month Founder & CTO

    First action

    Write the sizing rules as a table.

    How to measure it

    Sizing-tool requests

    Now
    –
    Target
    25% of all requests
    By
    2 quarters

    Steps

    1. 1

      Write the rules

      Model fit and derating by inputs.

      Electrical Engineer 2 days

    2. 2

      Design the tool

      Five inputs, one answer.

      Founder & CTO 2 days

    3. 3

      Build it

      On /products and each product page.

      Generalist Hardware/Firmware Engineer 1 week

    4. 4

      Connect the form

      Inputs prefilled into the request.

      Generalist Hardware/Firmware Engineer 1 day

    5. 5

      Validate

      Check answers against past requests.

      Electrical Engineer 2 days

    6. 6

      Measure

      Completions and request quality.

      Founder & CEO monthly

    First result
    1 month
    Cost
    Engineering time
    Owner
    Founder & CTO

    Smallest test

    Publish the sizing table as a static page first.

    Why it works

    Build a short tool: pack voltage, peak and continuous power, coolant temperature and flow, and cooling type in; recommended model (MC0-10, MC0-250 or MC0-500), estimated headroom and the relevant derating notes out. One click sends the inputs into the contact form.

    Engineers get a fit answer at the moment of interest, and the founders get structured requirements instead of a blank text box.

    Risks and how to handle them

    • Buyers treat estimates as guarantees

      Label results as a starting point for an application review.

    Builds on

    Evidence

    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
    • Your websiteContact form: required Name, Company, Email, Application area (Automotive / EV platform, Commercial vehicle / fleet, Aerospace / defense, Industrial / robotics, Custom power electronics) and Project details; optional Phone and Expected annual volume (Prototype / evaluation, 1-100, 101-1,000, 1,001-10,000, 10,000+ units); no stated response time, phone number or address. Product pages link to it with product and source parameters.Source
  • 17

    The Custom Power Electronics page offers "DC-DC converters to motor drives" but its only process step is "Tell us about your application...". It has no example projects, timelines or engagement model. Helix shows buyers a clear ladder of Stock, Configured and Custom, with no NRE for stock samples.

    Medium impactLow effort First result in 1 quarter Founder & CEO

    First action

    Write the three tiers with typical NRE ranges and timelines.

    How to measure it

    Custom-work requests

    Now
    –
    Target
    +50%
    By
    2 quarters

    Steps

    1. 1

      Define the tiers

      What changes, typical NRE, typical timeline.

      Founder & CEO 1 day

    2. 2

      Write examples

      Three anonymised projects.

      Founder & CTO 2 days

    3. 3

      Make the sheet

      Downloadable requirements sheet.

      Electrical Engineer 1 day

    4. 4

      Rebuild the page

      Tiers, examples, sheet, form link.

      Generalist Hardware/Firmware Engineer 2 days

    5. 5

      Tag requests

      Tier chosen in the form.

      Generalist Hardware/Firmware Engineer 1 hour

    6. 6

      Review

      Requests and win rate by tier.

      Founder & CEO quarterly

    First result
    1 quarter
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Add the three-tier table to the existing page.

    Why it works

    Restructure the page into three tiers: Stock (an MC0 as it ships), Configured (an MC0 with a changed connector, enclosure, firmware or protocol; small NRE; weeks) and Custom (a new design such as a DC-DC or bidirectional AC/DC stage; scoped NRE; months). Add three anonymised example projects across the markets the homepage lists (automotive, defense, data center, robotics), and a downloadable requirements sheet.

    A clear ladder helps buyers self-select and sets expectations on cost and time. Configured work is often the most profitable step between a catalogue product and a full custom program.

    Risks and how to handle them

    • Published NRE ranges anchor too low

      Show typical ranges with a "from" figure.

    Evidence

    • Your websiteCustom Power Electronics page: "From DC-DC converters to motor drives"; the only process step is "Tell us about your application, power and voltage requirements, packaging constraints, and timing"; no example projects, timelines or engagement model. The homepage lists DC-DC converters, bidirectional AC/DC and actuator drivers for automotive, defense, data center and robotics customers, with engineering and manufacturing in-house.Source
    • Competitor researchHelix sells Stock (off-the-shelf, no NRE for sample quantities), Configured and Custom motors and inverters for automotive, aerospace, marine, defence and motorsport, with a downloadable application requirements sheet. Motion Applied's MCU-600 800V SiC inverter (6.4 kg, up to 99% efficiency) offers a product summary and a long-form datasheet download.Source
  • 18

    The MC0-500 datasheet claims >99% nominal efficiency and says continuous power "Derates based on temperature and voltage", but it has no efficiency map or derating curve; it points to the docs, which have none either. Vehicle engineers need both to size the battery and the cooling. Motion Applied publishes a long-form datasheet.

    High impactMedium effort First result in 1 quarter Electrical Engineer

    First action

    Plan the test matrix from the test cells' current capability.

    How to measure it

    Datasheet-to-request rate

    Now
    –
    Target
    +20%
    By
    2 quarters

    Steps

    1. 1

      Plan the matrix

      Speed, torque, voltage, coolant temperature.

      Electrical Engineer 2 days

    2. 2

      Run the tests

      Test-cell runs with logged data.

      Generalist Hardware/Firmware Engineer 3 weeks

    3. 3

      Make the charts

      Efficiency map and derating curves.

      Electrical Engineer 1 week

    4. 4

      Update the datasheet

      Revision 4 with method notes.

      Electrical Engineer 2 days

    5. 5

      Write the Note

      How the map was measured.

      Founder & CEO 2 days

    6. 6

      Repeat for MC0-250

      With its first datasheet.

      Electrical Engineer when shipping

    First result
    1 quarter
    Cost
    Test-cell time
    Owner
    Electrical Engineer

    Smallest test

    Publish one derating curve against coolant temperature.

    Why it works

    Run the MC0-500 across speed, torque, bus voltage and coolant temperature in the test cells. Publish an efficiency map, continuous-power derating curves (coolant temperature, flow, voltage, switching frequency) and the test set-up. Add them to datasheet Revision 4 and the docs, and write the method up as a Note.

    The >99% claim becomes data, buyers can do system sizing without a call, and the long-form datasheet matches what larger rivals provide.

    Risks and how to handle them

    • Measured numbers below the headline

      Publish the true peak and the operating range where it holds; honest data builds more trust.

    Evidence

    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
    • Competitor researchHelix sells Stock (off-the-shelf, no NRE for sample quantities), Configured and Custom motors and inverters for automotive, aerospace, marine, defence and motorsport, with a downloadable application requirements sheet. Motion Applied's MCU-600 800V SiC inverter (6.4 kg, up to 99% efficiency) offers a product summary and a long-form datasheet download.Source
    • Your websiteAbout page: mission "engineering the most efficient and reliable power electronics in the world"; builds, tests and iterates in its own labs and test cells and manufactures in America; no founding date, location, team or customers.Source

Big bets 3

Larger plays that can change the trajectory.

  • 19

    The contact form's volume options run from "Prototype / evaluation" to "10,000+ units", and the datasheet promises a path "from 0 to 1, to 100, to 1,000,000 units". Today every buyer, from a single prototype to a fleet program, goes through the same application review with no defined evaluation offer.

    High impactHigh effort First result in 1 quarter Founder & CEO

    First action

    Set the evaluation price and credit terms.

    How to measure it

    Evaluation-to-volume conversion

    Now
    –
    Target
    10 paid evaluations, 30% to volume
    By
    3 quarters

    Steps

    1. 1

      Define the kit

      Controller, integration kit, files, support.

      Founder & CTO 1 week

    2. 2

      Set terms

      Price, credit window, support limits.

      Founder & CEO 1 week

    3. 3

      Publish the offer

      Product pages and the evaluation button (idea 3).

      Founder & CEO 2 days

    4. 4

      Support evaluators

      Tuning sessions and 30-day check-in.

      Firmware Engineer ongoing

    5. 5

      Capture learnings

      Motor library entries and FAQ updates.

      Firmware Engineer ongoing

    6. 6

      Convert

      Volume proposal at day 30.

      Founder & CEO per evaluation

    7. 7

      Review

      Conversion, support hours, time to first spin.

      Founder & CEO quarterly

    First result
    1 quarter
    Cost
    Inventory of evaluation units and support time
    Owner
    Founder & CEO

    Smallest test

    Offer the package to the next five evaluation requests.

    Why it works

    Package a fixed-price evaluation: an MC0-500 (later MC0-250), the integration kit, the DBC file and STEP model, two remote tuning sessions and a 30-day check-in, at a published price credited in full against a production order within 12 months. Use evaluation data to qualify buyers for the volume track.

    A fixed offer shortens the first sale from weeks of emails to one decision, the credit pulls good evaluations toward volume, and paying evaluators are more committed than free ones.

    Risks and how to handle them

    • Support load per evaluation

      Cap sessions and build the motor library from each one.

    • Evaluations that never convert

      Qualify on volume and timeline before shipping.

    Builds on

    Evidence

    • Your websiteContact form: required Name, Company, Email, Application area (Automotive / EV platform, Commercial vehicle / fleet, Aerospace / defense, Industrial / robotics, Custom power electronics) and Project details; optional Phone and Expected annual volume (Prototype / evaluation, 1-100, 101-1,000, 1,001-10,000, 10,000+ units); no stated response time, phone number or address. Product pages link to it with product and source parameters.Source
    • Your datasheetMC0-500 datasheet (Revision 3, February 2026): "Simple Software Integration with 1-click Motor Tuning"; "Industry Leader for Medium to High Power device at 100kW/L"; 500 kVA continuous that "Derates based on temperature and voltage"; switching 20 kHz typical, 100 kHz maximum; 25 L/min coolant for full performance; says small teams can "get running in minutes" and scale "from 0 to 1, to 100, to 1,000,000 units"; no efficiency map, derating curve or price.Source
    • Your websiteHomepage pricing blocks: MC0-10 "Coming Soon"; MC0-250 and MC0-500 each show a "Checkout" button with no price; MC0-250 "Datasheet Coming Soon". The product pages and /products show no price and no checkout, and send buyers to the contact form ("Request application review", "Send requirements").Source
  • 20

    The MC0-10 (15 kW, 0.75 L, 1.2 kg, air or liquid cooled) targets robotics, automation and light electric vehicles, markets with many small teams buying in small quantities. The homepage already shows "Checkout" buttons, so the intent to sell online is there. None of the rivals reviewed (Cascadia, Helix, Motion Applied) sells online; all quote on request.

    High impactHigh effort First result in At MC0-10 launch Founder & CEO

    First action

    Set target unit cost and price from the MC0-10 bill of materials.

    How to measure it

    Self-serve orders

    Now
    –
    Target
    100 units in the first two quarters after launch
    By
    launch + 2 quarters

    Steps

    1. 1

      Price it

      Unit price and quantity breaks.

      Founder & CEO 2 weeks

    2. 2

      Set terms

      Warranty, returns, export limits and support.

      Founder & CEO 1 month

    3. 3

      Build the store

      Checkout on the MC0-10 page.

      Generalist Hardware/Firmware Engineer 2 weeks

    4. 4

      Self-serve docs

      Quick start, tuning guide, DBC, STEP.

      Firmware Engineer 1 month

    5. 5

      Launch to the waitlist

      Early access window.

      Founder & CEO at launch

    6. 6

      Hand over large orders

      Above the quantity limit to sales.

      Founder & CEO ongoing

    7. 7

      Review

      Orders, support tickets and upgrades to larger models.

      Founder & CEO monthly

    First result
    At MC0-10 launch
    Cost
    Inventory and store set-up
    Owner
    Founder & CEO

    Smallest test

    Take paid pre-orders from the waitlist at a set price.

    Why it works

    Launch the MC0-10 as the first Steinmetz product with a public price and a real checkout: unit price, quantity breaks up to a set limit, the integration kit, docs and repository access included, and a clear handover to sales above that quantity. Use the waitlist (idea 12) as the launch list.

    Small robotics and light-EV teams expect to buy components online, and a self-serve product reaches them without founder sales time while feeding the bigger controllers.

    Risks and how to handle them

    • Support volume from many small buyers

      Strong self-serve docs, a forum and paid support tiers.

    • Export and safety compliance for online sales

      Get advice on shipping and export rules before launch.

    Builds on

    Evidence

    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
    • Your websiteHomepage pricing blocks: MC0-10 "Coming Soon"; MC0-250 and MC0-500 each show a "Checkout" button with no price; MC0-250 "Datasheet Coming Soon". The product pages and /products show no price and no checkout, and send buyers to the contact form ("Request application review", "Send requirements").Source
    • Competitor researchHelix sells Stock (off-the-shelf, no NRE for sample quantities), Configured and Custom motors and inverters for automotive, aerospace, marine, defence and motorsport, with a downloadable application requirements sheet. Motion Applied's MCU-600 800V SiC inverter (6.4 kg, up to 99% efficiency) offers a product summary and a long-form datasheet download.Source
    • Competitor researchCascadia Motion (a BorgWarner company) lists CM200, CM350DZ and CM350SiC inverters plus integrated motor-inverter modules, motors and gearboxes; sells accessories including high-voltage cables and low-voltage connector kits; runs a Student Project Sponsorship program; buyers request a quote.Source
  • 21

    Steinmetz names no customers, logos or testimonials anywhere on its site, and has no YouTube channel. The MC0-250 is aimed at track, drift and motorsport builds and marine craft, where builds are watched and shared. The YC launch post invited builders of everything from boats to tractors.

    High impactHigh effort First result in 1 quarter Founder & CEO

    First action

    Choose the platform and a partner builder.

    How to measure it

    Build-sourced requests

    Now
    –
    Target
    20
    By
    3 quarters

    Steps

    1. 1

      Pick the platform

      Track car or boat, with a partner builder.

      Founder & CEO 1 month

    2. 2

      Plan the content

      Six episodes from packaging to testing.

      Founder & CEO 1 week

    3. 3

      Build

      Integration with published tools only.

      Generalist Hardware/Firmware Engineer 2 quarters

    4. 4

      Log data

      Power, temperature, efficiency on track or water.

      Firmware Engineer ongoing

    5. 5

      Publish

      Notes, short videos, LinkedIn and X.

      Founder & CEO monthly

    6. 6

      Demo day

      Invite prospects and press.

      Founder & CEO 1 day

    First result
    1 quarter (first episodes)
    Cost
    Platform, parts and build time
    Owner
    Founder & CEO

    Smallest test

    Publish one episode on packaging an MC0 into an existing vehicle.

    Why it works

    Pick one visible platform (a track car conversion or an electric boat), ideally with a partner builder, and put an MC0-250 in it. Publish each stage as a Note and a short video: packaging with the STEP model, wiring with the integration kit, tuning with the motor library, track or water testing with logged data. End with a public demo day and a case study.

    A real vehicle is the proof a young hardware company lacks, it shows the integration story step by step and it gives sales a reference they can point to before named customers agree to go public.

    Risks and how to handle them

    • Distracts a small team

      Partner builder does the vehicle work; Steinmetz owns the drive.

    • A public failure

      Publish problems and fixes openly; engineers respect that.

    Builds on

    Evidence

    • Your websiteHomepage (checked November 9, 2026): headline "NEXT GENERATION MOTOR CONTROLLERS & CUSTOM POWER ELECTRONICS"; three 0-Series controllers (MC0-10, 15 kW, coming 2027; MC0-250, 250 kW; MC0-500, 500 kW, available now); features "One-click auto-tuning", "Open source firmware and software allows you to easily integrate this into your system and customize it to your needs" and "Open-source firmware. No more waiting weeks for support."; no link to any code repository; "Proudly Made in America"; no customers, logos or testimonials; no email signup.Source
    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
    • Public profilesResearch data: steinmetzmotors.com registered November 2024; homepage headline changed from "Hardware for the NextGeneration of Vehicles" to "NEXT GENERATION MOTOR CONTROLLERS" and Google Analytics added since November 2025; company profiles on LinkedIn and X; no YouTube or Instagram found; no Hacker News mentions and no news mentions in the last 30 days.Source
    • Y CombinatorY Combinator profile: Winter 2025 batch, founded 2024, team size 5, San Francisco; the first product is a motor controller claimed at about 3x the power density of current solutions at similar or better efficiency and competitive cost. The YC launch post says the founders previously worked at Tesla and invites builders of any electric vehicle, from trains and boats to cranes, planes and tractors.Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 22

    Steinmetz's own measurement shows an 8 kHz 2-level inverter producing a 16 kHz tone 63 dB above ambient, while its 31.25 kHz 3-level inverter shows no peaks in the audible band. Nowhere on the product pages is this sold as a benefit, yet marine craft, robots working near people, aircraft cabins and premium vehicles all care about drive noise.

    Medium impactLow effort First result in 1 quarter Founder & CEO

    First action

    Add the spectrum chart and one line to the MC0-500 page.

    How to measure it

    Noise-led requests

    Now
    –
    Target
    10
    By
    2 quarters

    Steps

    1. 1

      Check the claim

      Repeat the measurement across operating points.

      Electrical Engineer 1 week

    2. 2

      Add to product pages

      Chart and one-line claim.

      Founder & CEO 1 hour

    3. 3

      Write the page

      Noise-sensitive applications.

      Founder & CEO 3 days

    4. 4

      Outreach

      Marine and robotics teams, with the data.

      Founder & CEO 1 month

    5. 5

      Track

      Requests mentioning noise.

      Founder & CEO monthly

    6. 6

      Extend

      Add EMI and vibration data later.

      Electrical Engineer 1 quarter

    First result
    1 quarter
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Send the measurement to ten marine and robotics teams.

    Why it works

    Turn the whine measurement into a product claim backed by data: a "no audible switching tone" line with the spectrum chart on the MC0 pages, a short page for noise-sensitive applications (marine, robotics around people, aviation, premium EVs), and outreach to those buyers with the measurement attached.

    Most inverter marketing competes on kW/L and efficiency; quiet operation is a measurable difference that buyers in these markets feel directly and rarely see published.

    Risks and how to handle them

    • Claim doesn't hold at all operating points

      State the tested conditions next to the chart.

    Evidence

    • Your blogNotes: two posts by the founder and CEO, "What Is a Motor Controller / Inverter?" (April 22, 2026, about 1,600 words) and "Why Power Electronics Whine (And How to Stop It)" (November 5, 2026), which measures an 8 kHz 2-level inverter with a dominant 16 kHz tone 63 dB above ambient against Steinmetz's 31.25 kHz 3-level inverter with no peaks in the audible band. No email subscribe or RSS option.Source
    • Your websiteMC0-250 and MC0-10 pages: the MC0-250 (250 kW, 2.4 L, 3.5 kg) lists track, drift and motorsport EV builds, mobile robotics, mining and construction, light aircraft and drones, and marine craft; the MC0-10 (15 kW, 0.75 L, 1.2 kg) is "currently in development" with "Expected availability: 2027" for "robotics, automation, and light electric vehicles", and offers only "View Available Products" and "Contact Sales", with no waitlist.Source
  • 23

    Steinmetz has no Hacker News mentions and no news mentions in the last 30 days, yet it has exactly the kind of story engineers share: a 500 kW inverter in 4.8 litres from a YC hardware team, open docs and, once published, open firmware.

    Medium impactLow effort First result in 1 day Founder & CTO

    First action

    Draft the architecture Note.

    How to measure it

    Launch-week requests

    Now
    –
    Target
    10 requests, 300 stars
    By
    launch week

    Steps

    1. 1

      Ready the repo

      README, build guide, licence, status table.

      Firmware Engineer 1 week

    2. 2

      Write the Note

      Architecture, topology, firmware, roadmap.

      Founder & CTO 3 days

    3. 3

      Post Show HN

      Plain title, link to the repo.

      Founder & CTO 1 hour

    4. 4

      Answer all day

      Founders in the thread.

      Founder & CEO 1 day

    5. 5

      Follow up

      Thank contributors; reply to every request.

      Founder & CEO 1 week

    6. 6

      Measure

      Stars, applicants, requests.

      Founder & CEO 1 week

    First result
    1 day
    Cost
    $0
    Owner
    Founder & CTO

    Smallest test

    Post the whine Note to engineering communities first and gauge interest.

    Why it works

    When the repository from idea 1 goes public, post a Show HN and a long Note on the architecture: why 1000V, the 3-level topology behind the quiet drive, how the firmware is structured and what's next. Answer questions in the thread for the whole day, and link the repo, docs and evaluation offer.

    One well-received technical launch can bring thousands of engineers, contributors and job applicants to a small company in a day, at no cost.

    Risks and how to handle them

    • Low traction

      The Note still serves as evergreen content; share it in engineering forums too.

    Builds on

    Evidence

    • Public profilesResearch data: steinmetzmotors.com registered November 2024; homepage headline changed from "Hardware for the NextGeneration of Vehicles" to "NEXT GENERATION MOTOR CONTROLLERS" and Google Analytics added since November 2025; company profiles on LinkedIn and X; no YouTube or Instagram found; no Hacker News mentions and no news mentions in the last 30 days.Source
    • Your websiteHomepage (checked November 9, 2026): headline "NEXT GENERATION MOTOR CONTROLLERS & CUSTOM POWER ELECTRONICS"; three 0-Series controllers (MC0-10, 15 kW, coming 2027; MC0-250, 250 kW; MC0-500, 500 kW, available now); features "One-click auto-tuning", "Open source firmware and software allows you to easily integrate this into your system and customize it to your needs" and "Open-source firmware. No more waiting weeks for support."; no link to any code repository; "Proudly Made in America"; no customers, logos or testimonials; no email signup.Source
    • Y CombinatorY Combinator profile: Winter 2025 batch, founded 2024, team size 5, San Francisco; the first product is a motor controller claimed at about 3x the power density of current solutions at similar or better efficiency and competitive cost. The YC launch post says the founders previously worked at Tesla and invites builders of any electric vehicle, from trains and boats to cranes, planes and tractors.Source
  • 24

    Real visitors already pass Core Web Vitals comfortably (LCP 0.77 s, INP 45 ms, CLS 0.01 at the 75th percentile), and the desktop lab score is 100. The lab mobile score of 92 points to two small fixes: longer cache lifetimes (about 0.7 s, 354 KB) and one colour-contrast issue. Google Tag Manager is the largest third party at 178 KB.

    Low impactLow effort First result in 1 day Generalist Hardware/Firmware…

    First action

    Set cache lifetimes for static files in Cloudflare.

    How to measure it

    Core Web Vitals (field)

    Now
    –
    Target
    Pass on all three
    By
    ongoing

    Steps

    1. 1

      Cache rules

      Long lifetimes for hashed static files.

      Generalist Hardware/Firmware Engineer 20 minutes

    2. 2

      Fix contrast

      The low-contrast text flagged.

      Generalist Hardware/Firmware Engineer 15 minutes

    3. 3

      Review tags

      Keep only tags in use in Tag Manager.

      Founder & CEO 15 minutes

    4. 4

      Retest

      PageSpeed after the change.

      Generalist Hardware/Firmware Engineer 10 minutes

    5. 5

      Check field data

      Search Console Core Web Vitals.

      Generalist Hardware/Firmware Engineer monthly

    6. 6

      Stop

      No further speed work while vitals pass.

      Founder & CEO -

    First result
    1 day
    Cost
    $0
    Owner
    Generalist Hardware/Firmware Engineer

    Smallest test

    Apply the cache rule and rerun PageSpeed.

    Why it works

    Set long cache headers on static assets in Cloudflare, fix the low-contrast text, and check that Google Tag Manager loads only tags in use. Then stop: put the team's time into ideas 1 to 5, where the real conversion gaps are.

    It keeps the site fast with an hour's work and protects a five-person team from optimising a score that already passes for real users.

    Risks and how to handle them

    • Stale files after deploys

      Cache only hashed file names for long periods.

    Evidence

    • PageSpeedGoogle PageSpeed (November 9, 2026): real visitors pass Core Web Vitals (75th percentile LCP 0.77 s, INP 45 ms, CLS 0.01; LCP 14% faster than the previous period); lab scores 92 mobile and 100 desktop; the largest fixes are cache lifetimes (about 0.7 s, 354 KB) and unused JavaScript (102 KB); Google Tag Manager is the largest third party at 178 KB; one colour-contrast accessibility issue.Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

ProgrammableInfo

Turn the research into a list you can act on

These ideas start with finding the right companies. Info finds them and the right person at each, researches every one and drafts the outreach, then asks before it sends.

  • Build this list in Info for idea #11 (opens programmable.info in a new tab)

New accounts: 100,000 free credits with code BETA100K

Find the companies (opens programmable.info in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Liquid Compute growth strategyA financial layer for GPU compute: the Liquid Compute Index (daily reference prices for A100, H100, H200, B200 and B300), an OTC desk for…24 growth ideas
  • Paula's Choice growth strategyA research-led skincare brand, founded in 1995 and owned by Unilever, selling exfoliants, serums, moisturizers and sunscreens, known for…21 growth ideas
  • Omni Powertrain Technologies growth strategyA privately owned driveline manufacturer founded in 1958 and headquartered in Houston, making mechanical, hydraulic and electric…21 growth ideas
  • Pulse growth strategyA free app for making friends in real life: it matches people into small groups, breaks the ice with an AI guide (Pip) and helps them plan…20 growth ideas
  • Jet Set Girl Wellness growth strategyA woman-owned Miami Beach wellness brand for perimenopause and menopause: supplements for mood, sleep, energy, weight and hormonal…21 growth ideas
  • Vesence growth strategyAn agent-native computer: a cloud workspace where many agents work in parallel across mail, calendar, files, a browser, Office documents…23 growth ideas
  • Dosso Beauty growth strategyA Philadelphia brand of clinically tested, non-toxic, hypoallergenic braiding hair, plus crochet hair, braid care products and styling…23 growth ideas
  • Photoroom growth strategyAI photo editing for e-commerce: background removal, AI backgrounds, virtual models, batch editing, video, a Shopify app, an API and an…21 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on November 10, 2026, and cites them throughout. Steinmetz did not commission, review or endorse it, and Programmable is not affiliated with Steinmetz. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Steinmetz runs its business.

Something wrong, or do you represent Steinmetz? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    Make the claims match the docs: firmware repo and status, J1939 wording and a DBC file, an evaluation request in place of 'Checkout', a better contact form, STEP files and real job descriptions; plus a one-hour speed fix.

  2. Days 31 to 6011 ideas

    Build proof and reach: the integration kit, a sourced comparison page, application pages, a regular engineering notes list, a certification roadmap, a motor library, a sizing tool, the custom power ladder, efficiency maps, the quiet-drive pitch and a Show HN launch.

  3. Days 61 to 906 ideas

    Pipeline and the big bets: student teams, the MC0-10 waitlist, motor partners, a paid evaluation program, a self-serve MC0-10 store and a public demonstrator build.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value very high power density: 500 kW in 4.8 litres and 7.4 kg. The most cited problem: integration takes time: tuning, resolver set-up and CAN mapping.

  • Open documentation: CAN protocol, state machine and EEPROM settings published
  • Waiting weeks for supplier support
  • In their words: “power density”

Market

Competitive landscape

3 competitors compared: Cascadia Motion, Helix and Motion Applied.

  • Gap to exploit: Inverters that small teams can design in and run within days, with open firmware and tools
  • Cascadia Motion: Quote-only buying
  • Helix: No online purchase or evaluation kits

Hiring signals

A five-person YC team hiring three engineers in San Francisco ($100K-$175K, new grads welcome): a Firmware Engineer, a Generalist Hardware/Firmware engineer and an Electrical Engineer.

  • Firmware Engineer: Auto-tuning, protocol and open firmware still to ship. Ideas 1, 2, 14, 23.
  • Generalist Hardware/Firmware: MC0-250 and MC0-10 bring-up, evaluation support. Ideas 12, 19, 20.
  • Electrical Engineer: Test data, compliance and custom power work. Ideas 13, 17, 18.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks firstNew accounts get 100,000 free enrichment credits with code BETA100K (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammableMediaAn AI note taker, interpreter and webinar host for your calls (opens programmable.media in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence