ProgrammableMarketing/usetorus.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 5
  • This quarter · 12
  • Big bets · 3
  • Wildcards · 2
  • How we can help
Generated Nov 10, 2026
  1. Programmable
  2. Playbooks
  3. Torus
Torus logo

growth playbook · Nov 10, 2026

usetorus.com (opens in a new tab)

Torus growth playbook

Diagnosis

Torus is a Y Combinator Summer 2026 company with an unusually strong proof asset: a whole 11-volume, 1,949-page gas receipt meter station package published on its site, drafted in about 5 hours of engineer time. Its job posts show the next step: a GTM hire measured on qualified meetings booked for the CEO, discipline engineers for Fortune 500 and major EPC work on data centers, refineries and energy sites, and an AI engineer building the input pipeline.

The website has not caught up. Every pilot request is a mailto link that can't be attributed, three sample drawing titles still contain an unfilled "{x}", most blog category pages are empty, the sample PDFs are missing from the sitemap, and the speed claim appears as 9.7x, 10x and "6 weeks into 6 hours". Data centers appear nowhere on the site.

This playbook fixes the funnel and the proof first. It then gives the GTM hire channels it can measure (events, outbound that leads with sample sheets, a change-impact demo) and sets up three bigger bets: the project inbox as a smaller first sale, a free consistency checker, and a path for project owners.

Growth Score

6/10

Biggest Opportunity

Turn the published sample package and the founders' engineering depth into a measurable pipeline: an attributable pilot intake, sample sheets matched to each buyer's discipline, and new samples for the data center and process work the team is already doing.

Biggest Risk

Enterprise EPC buyers judge on trust: a proof package with visible template errors, unsourced statistics, three different speed claims and a SOC 2 Type 1 report against review tools that already hold Type 2 can stall procurement however good the drafting is.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Replace the mailto-only "Request a pilot" with a project-basis intake that books the CEO and records the source

    Count last quarter's pilot emails to [email protected] and how many needed a second email just to learn the project type and phase.

    High impact First result in 2 weeks
  2. 2

    Fix the three "{x}" placeholders in the published sample package, and stop the next one

    Search the register, PDFs and primer for "{" and list every hit.

    Medium impact First result in 1 week
  3. 3

    Stop search engines indexing empty "Nothing filed here yet" category pages

    List which of the 14 category pages have zero posts.

    Medium impact First result in 1 month

02

Your idea portfolio

22 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 8 ideas are marked Unexpected: plays you are unlikely to have tried.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 2Big bets · 9Fill-ins · 7Reconsider · 4
Effort →

Showing 22 of 22 ideas

This week 5

Quick wins with a clear first action.

  • 01

    Every pilot request on usetorus.com is a mailto link to [email protected]: the homepage button, the closing "Transmittal · Pilot request" block and the end of both blog posts. There is no form, no calendar and no record of which channel sent the visitor. Torus is hiring a GTM lead measured on "qualified meetings booked for our CEO" and asked to own attribution across events, outbound, ads and billboards, but this setup gives them nothing to attribute. A mailto click on a locked-down corporate laptop or a phone often opens nothing. When it does work, the email arrives without project type, phase or deployment needs, so a founder has to email back just to qualify it.

    High impactLow effort First result in 2 weeks Member of Nontechnical Staff

    First action

    Count last quarter's pilot emails to [email protected] and how many needed a second email just to learn the project type and phase.

    How to measure it

    Website-sourced qualified pilot meetings

    Now
    –
    Target
    +50% against the mailto baseline
    By
    90 days

    Steps

    1. 1

      Set the baseline

      Pilot emails, qualifying replies needed and meetings booked last quarter.

      Member of Nontechnical Staff (GTM) 1 day

    2. 2

      Choose the fields

      At most eight fields, matching what a founder asks in the first reply today.

      Co-Founder & CEO 1 day

    3. 3

      Build the intake

      Transmittal-style form with optional basis upload; keep the email link beside it.

      AI Engineer 3 days

    4. 4

      Capture the source

      UTM, referrer and landing page saved with every request and sent to the CRM.

      Member of Nontechnical Staff (GTM) 1 day

    5. 5

      Route and book

      Qualified requests see the CEO's calendar; others get the 24-hour founder reply.

      Member of Nontechnical Staff (GTM) 2 days

    6. 6

      Roll it out

      Same component at the end of every blog post, the FAQ and the team page.

      AI Engineer 1 day

    7. 7

      Review weekly

      Meetings by channel; drop channels that do not produce them.

      Member of Nontechnical Staff (GTM) weekly

    First result
    2 weeks
    Cost
    A few days of engineering plus a scheduling tool (under $50 a month)
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    Put a four-field form above the mailto on the homepage for two weeks and compare requests, qualification and source data.

    Why it works

    Keep the email option, but make the main "Request a pilot" button open a short intake styled like the existing transmittal block. Ask for name and work email, firm, role, project type (gas or pipeline station, substation, process plant, data center, other), phase (FEL1-3, detailed design), the package wanted, and Managed or Sovereign. Include an optional project-basis upload with a "send it under NDA later" choice. Store UTM parameters, referrer and landing page with each request. Qualified requests go straight to a booking slot with the CEO; the rest get the founder reply the page already promises within 24 hours. Use the same component on blog posts, the FAQ and the team page so every page records where pilots come from.

    It removes the step most likely to lose an enterprise visitor (a mail client that does not open), gives the founders enough context to reply with the right sample sheets, and gives the GTM hire the channel data their role is measured on from the first week.

    Ready to use

    ChecklistPilot intake launch list

    [ ] Name, work email, firm, role (required)
    [ ] Project type: gas or pipeline station / substation / process plant / data center / other
    [ ] Phase: FEL1 / FEL2 / FEL3 / detailed design
    [ ] Package wanted (free text)
    [ ] Managed or Sovereign
    [ ] Optional basis upload, or "send under NDA later"
    [ ] UTM, referrer and landing page stored
    [ ] Qualified requests offered a CEO booking slot
    [ ] "Email us" link kept beside the button
    [ ] Same component on blog, FAQ and team pages

    Risks and how to handle them

    • Engineers prefer email to forms

      Keep "email us" as a visible second option and make only four fields required.

    • Prospects hesitate to upload a confidential project basis

      Make upload optional, state where files are stored, and offer to receive the basis under NDA.

    Evidence

    • Your websitePilot request (checked November 9, 2026): the "Request a pilot" button is a mailto link to [email protected]; the closing "Transmittal · Pilot request" block says "Send us a project basis. We draft one package from it." and "A founder replies within 24 hours.", with "Email us", Outlook on the web and Gmail compose links. There is no form, no input field and no calendar link, and both blog posts end with the same mailto button.Source
    • HiringMember of Nontechnical Staff (GTM), San Francisco, $100K-$150K: finds and runs events and conferences and books meetings around them, builds outbound target lists and sequences, prepares the CEO for meetings, tests ads and billboards, and owns attribution (which channels produce meetings); measured on "qualified meetings booked for our CEO"; a GTM team of two in a company of about eight.Source
    • Your websiteFAQ: seven questions covering scope ("P&IDs, PFDs and heat and material balances", one-lines, datasheets, calculations, specifications and estimates "in your firm's format"), the 9.7x timing, approval ("your engineer is credited as the preparer"), provenance ("the sheet, revision and line it came from"), the two example packages and data handling. Nothing on pricing, pilot scope or length, input file types, CAD tools or design standards.Source
  • 02

    The sample package is Torus's main proof, and the pitch is consistency: every value traced to its source. Yet three drawing titles in the published register still contain an unfilled template variable: PRO-DWG-108 "OUTLET AND {x} INTERCONNECT", PIP-DWG-004 "{x} TIE-IN, OUTLET LATERAL" and INS-DWG-001 "... TELECOM, {x} I/F". A checking engineer at an EPC reads the drawing list and title blocks first, and a literal "{x}" is exactly the kind of error the product promises to catch.

    Medium impactLow effort First result in 1 week Physical Infrastructure Engin…

    First action

    Search the register, PDFs and primer for "{" and list every hit.

    How to measure it

    Placeholder hits

    Now
    –
    Target
    0
    By
    1 week

    Steps

    1. 1

      Find every hit

      Register, drawing lists, title blocks, llms-full.txt.

      Physical Infrastructure Engineer 2 hours

    2. 2

      Fill the values

      The interconnect and tie-in names from the basis.

      Physical Infrastructure Engineer 2 hours

    3. 3

      Re-issue as Rev B

      With a revision note on the affected sheets.

      Physical Infrastructure Engineer half a day

    4. 4

      Add a publish check

      Block any file with unfilled template slots.

      AI Engineer half a day

    5. 5

      Find the cause

      Why the slot stayed empty in drafting.

      AI Engineer 1 day

    6. 6

      Re-check quarterly

      Run the check on every published sample.

      Physical Infrastructure Engineer quarterly

    First result
    1 week
    Cost
    $0, staff time only
    Owner
    Physical Infrastructure Engineer

    Smallest test

    Fix the three titles in register.json today.

    Why it works

    Fill the three titles in register.json, the drawing list and each PDF title block, and re-issue the package as Revision B with a one-line revision note (showing the revision control Torus sells). Add a publishing check that blocks any document, title or primer text containing an unfilled placeholder, and run it on the geothermal set and llms-full.txt too. Find out why drafting left the slot empty and feed that back to the agent's checks.

    Prospects judge an AI drafting tool by its sample; removing visible template errors protects the credibility that the other 1,949 pages earn.

    Risks and how to handle them

    • Cached copies of the old PDFs remain

      Keep the same URLs so crawlers refresh them, and note the revision on the register.

    Evidence

    • Your websitePackage register: 2 published packages, 264 documents and 1,957 pages; the gas receipt meter station is Revision A, issued 2026-09-29, "Issued for review"; the geothermal makeup well pad is an 8-sheet drawing set. Three drawing titles carry a literal, unfilled "{x}": PRO-DWG-108 "P&ID STATION OUTLET: OUTLET AND {x} INTERCONNECT", PIP-DWG-004 "{x} TIE-IN, OUTLET LATERAL" and INS-DWG-001 "CONTROL AND NETWORK ARCHITECTURE: SCADA, SIS, TELECOM, {x} I/F".Source
    • Your websiteFAQ: seven questions covering scope ("P&IDs, PFDs and heat and material balances", one-lines, datasheets, calculations, specifications and estimates "in your firm's format"), the 9.7x timing, approval ("your engineer is credited as the preparer"), provenance ("the sheet, revision and line it came from"), the two example packages and data handling. Nothing on pricing, pilot scope or length, input file types, CAD tools or design standards.Source
  • 03

    Fourteen of the 19 URLs in Torus's sitemap are blog category pages (civil, electrical, I&C, mechanical, process, structural, FEL1-3, commissioning and more), but the blog has two posts, both filed under Cross-discipline. Pages like "Electrical notes" say "Nothing filed here yet." An EPC electrical lead who lands there reads it as no electrical depth, and search engines see a site that is mostly thin pages.

    Medium impactLow effort First result in 1 month Co Founder & CTO

    First action

    List which of the 14 category pages have zero posts.

    How to measure it

    Empty category pages in the sitemap

    Now
    –
    Target
    0
    By
    2 weeks

    Steps

    1. 1

      List empties

      Category pages with no posts.

      Co-Founder & CTO 1 hour

    2. 2

      Add noindex

      On pages with zero posts.

      AI Engineer 2 hours

    3. 3

      Trim the sitemap

      Generate it from pages with posts only.

      AI Engineer 2 hours

    4. 4

      Point to sheets

      Empty states link to the matching sample volume.

      Physical Infrastructure Engineer half a day

    5. 5

      Auto re-list

      Index again when the first post is filed.

      AI Engineer 2 hours

    6. 6

      Check coverage

      Search Console indexed pages after a month.

      Member of Nontechnical Staff (GTM) monthly

    First result
    1 month
    Cost
    $0
    Owner
    Co Founder & CTO

    Smallest test

    Noindex the Electrical notes page and link it to Volume 06 today.

    Why it works

    Until a category has at least one post, mark it noindex, remove it from the sitemap and hide it from the blog navigation. Replace the empty state with a link to the most relevant sample volume (for example, Electrical notes links to Volume 06, Electrical and Cathodic Protection). Re-list each category automatically when its first post goes live (see idea 9).

    It focuses crawl and visitor attention on pages with substance, and an empty state that points to real sheets turns a dead end into proof.

    Risks and how to handle them

    • Categories never get filled

      Tie the re-listing to the discipline briefs in idea 9.

    Evidence

    • Your websiteSitemap (checked November 9, 2026): 19 URLs with no lastmod dates: the homepage, FAQ, team page, blog index, 2 posts and 14 discipline and phase category pages. None of the 264 sample package PDFs is listed, although robots.txt says the site is open to search and answer engines "including the example packages under /package/" and points to /llms.txt and /llms-full.txt.Source
    • Your websiteBlog: two posts, both dated May 19, 2026 and both by the CTO ("ASME B31.3 vs the line list: where the disagreement starts" and "Why FEL2 tie-points are where projects bleed"), both filed under Cross-discipline. Category pages such as "Electrical notes" show "Nothing filed here yet."Source
  • 04

    The homepage and FAQ say engineers drafted a package 9.7x faster in one EPC's timed comparison, and the sample took about 5 hours of engineer time. The YC profile says "10x faster". Every job post says Torus turns design work "that took 6 weeks into 6 hours", which is closer to 40x for a 40-hour week. A careful engineering buyer who reads all three will ask which is true, and that question costs credibility in the first meeting.

    Medium impactLow effort First result in 2 weeks Co Founder & CEO

    First action

    List every place a speed claim appears and the measurement behind each.

    How to measure it

    Consistent speed claims

    Now
    –
    Target
    100% of public pages and posts
    By
    2 weeks

    Steps

    1. 1

      Inventory claims

      Site, FAQ, YC profile, job posts, LinkedIn, deck.

      Member of Nontechnical Staff (GTM) half a day

    2. 2

      Agree the number

      One headline figure and its scope.

      Co-Founder & CEO 1 hour

    3. 3

      Write the qualifier

      One sentence on what was timed.

      Co-Founder & CEO 1 hour

    4. 4

      Update everywhere

      Profile, job posts, site and deck.

      Member of Nontechnical Staff (GTM) 1 day

    5. 5

      Brief the team

      Same words in meetings and at events.

      Co-Founder & CEO 30 minutes

    6. 6

      Re-check

      Each time a new timing study lands.

      Member of Nontechnical Staff (GTM) quarterly

    First result
    2 weeks
    Cost
    $0
    Owner
    Co Founder & CEO

    Smallest test

    Update the job-post intro to match the homepage claim.

    Why it works

    Pick one headline number backed by the timed study (9.7x) and state its scope next to it every time: package type, engineer hours with and without Torus, what was counted. Update the YC profile, job posts, LinkedIn and pitch materials to match. If "6 weeks into 6 hours" describes a different measurement (elapsed time, not engineer hours), label it that way rather than dropping it.

    Engineers trust claims that are precise and consistent; a single, scoped number survives procurement scrutiny where a rounder, bigger one does not.

    Risks and how to handle them

    • A smaller number looks less exciting

      Pair it with the concrete package: 1,949 pages in about 5 engineer hours.

    Evidence

    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source
    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source
    • Y Combinator profileSummer 2026 batch, founded 2026, team of 8, San Francisco; tagline "Superintelligence for Infrastructure"; "Torus lets engineering firms and project owners build infrastructure 10x faster to reindustrialize America and the West."Source
  • 05

    The "Why this matters" section rests on three numbers (137,000 engineering firms, 3 jobs for every qualified engineer, 25% of the workforce retiring in 5 years) with no source shown. These are the figures a GTM hire will reuse in decks, ads and billboards, and an engineering buyer who cannot trace them will discount the argument. That clashes with a product whose promise is that every value is traced.

    Low impactLow effort First result in 1 week Member of Nontechnical Staff

    First action

    Ask whoever wrote the section where each number came from.

    How to measure it

    Sourced claims

    Now
    –
    Target
    3 of 3
    By
    2 weeks

    Steps

    1. 1

      Trace origins

      Where each number came from.

      Member of Nontechnical Staff (GTM) half a day

    2. 2

      Find primaries

      Official or industry sources.

      Member of Nontechnical Staff (GTM) 1 day

    3. 3

      Replace weak ones

      Swap in a sourced figure.

      Co-Founder & CEO 1 hour

    4. 4

      Add footnotes

      Small source links under each figure.

      AI Engineer 1 hour

    5. 5

      Publish sources

      A short /sources page.

      Member of Nontechnical Staff (GTM) 1 hour

    6. 6

      Reuse rule

      Only sourced numbers in ads and decks.

      Member of Nontechnical Staff (GTM) ongoing

    First result
    1 week
    Cost
    $0
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    Source the 137,000 figure first.

    Why it works

    Find the primary source for each figure (a government statistics series, an industry body or a named survey) and add a small footnote link under each. Replace any figure that cannot be sourced with one that can. Keep the source list on a short /sources page that the GTM team uses for every external claim.

    Traceable numbers match the brand promise and can be reused safely in paid and event materials.

    Risks and how to handle them

    • A figure turns out to be wrong

      Better to change it now than in a procurement review.

    Evidence

    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source
    • HiringMember of Nontechnical Staff (GTM), San Francisco, $100K-$150K: finds and runs events and conferences and books meetings around them, builds outbound target lists and sequences, prepares the CEO for meetings, tests ads and billboards, and owns attribution (which channels produce meetings); measured on "qualified meetings booked for our CEO"; a GTM team of two in a company of about eight.Source

This quarter 12

The core plays for the next three months.

  • 06

    Torus's robots.txt invites search and answer engines to crawl "the example packages under /package/" and publishes llms.txt, but the sitemap lists only 19 pages and none of the 264 sample PDFs. The package is the site's deepest content: 1,957 pages of P&IDs, datasheets, calculations and specifications whose titles match what engineers search for. Right now it is reachable only through a browser on the homepage.

    Medium impactMedium effort First result in 2 months AI Engineer

    First action

    Generate sitemap entries for all 264 PDFs from register.json.

    How to measure it

    Package-page organic entrances

    Now
    –
    Target
    500 a month
    By
    2 quarters

    Steps

    1. 1

      Extend the sitemap

      All PDFs, generated from register.json.

      AI Engineer half a day

    2. 2

      Template volume pages

      Purpose, register table, key values, links.

      AI Engineer 1 week

    3. 3

      Write intros

      Two paragraphs per volume by its discipline engineer.

      Physical Infrastructure Engineer 1 week

    4. 4

      Fix PDF metadata

      Descriptive titles and subjects.

      AI Engineer 1 day

    5. 5

      Link the intake

      Pilot request on every volume page.

      Member of Nontechnical Staff (GTM) 1 hour

    6. 6

      Measure

      Search Console by page and query.

      Member of Nontechnical Staff (GTM) monthly

    First result
    2 months
    Cost
    About two weeks of engineering time
    Owner
    AI Engineer

    Smallest test

    Add the PDFs to the sitemap and publish one volume page (Volume 06, Electrical).

    Why it works

    Add every published PDF to the sitemap and create one indexable HTML page per volume (11 for the meter station, 1 for the well pad). Each page gets the volume's purpose, its document register as a table, a few key values with their traced source, and links to the PDFs and to the pilot intake. Give PDFs descriptive titles in their metadata. Watch which document pages bring engineers in.

    Real engineering documents answer real searches, and every visitor who arrives on a datasheet sees the proof before the pitch.

    Risks and how to handle them

    • Traffic from students rather than buyers

      Judge it by pilot requests from package pages, not visits.

    Builds on

    Evidence

    • Your websiteSitemap (checked November 9, 2026): 19 URLs with no lastmod dates: the homepage, FAQ, team page, blog index, 2 posts and 14 discipline and phase category pages. None of the 264 sample package PDFs is listed, although robots.txt says the site is open to search and answer engines "including the example packages under /package/" and points to /llms.txt and /llms-full.txt.Source
    • Your websitePackage register: 2 published packages, 264 documents and 1,957 pages; the gas receipt meter station is Revision A, issued 2026-09-29, "Issued for review"; the geothermal makeup well pad is an 8-sheet drawing set. Three drawing titles carry a literal, unfilled "{x}": PRO-DWG-108 "P&ID STATION OUTLET: OUTLET AND {x} INTERCONNECT", PIP-DWG-004 "{x} TIE-IN, OUTLET LATERAL" and INS-DWG-001 "CONTROL AND NETWORK ARCHITECTURE: SCADA, SIS, TELECOM, {x} I/F".Source
  • 07

    Torus's engineering job posts say it works with Fortune 500s and major EPCs on data centers, refineries, chemical plants and energy installations, and the electrical role asks for SLDs, cable schedules and load lists. The website names plants, pipelines, substations and treatment plants, and both published samples are gas and geothermal. A data center developer or electrical EPC visiting today finds nothing that looks like their project.

    High impactHigh effort First result in 2 months Electrical Engineer

    First action

    Write a fictional data center basis that matches the deliverables the electrical team already produces.

    How to measure it

    Data center pilot requests

    Now
    –
    Target
    5 a quarter
    By
    2 quarters

    Steps

    1. 1

      Write the basis

      A fictional, realistic data center yard.

      Electrical Engineer 3 days

    2. 2

      Draft with Torus

      One-line, load list, cable schedule, datasheets.

      Electrical Engineer 1 week

    3. 3

      Check and redact

      Engineer review; nothing from client work.

      Electrical Engineer 1 week

    4. 4

      Publish

      Register, PDFs and a landing page.

      AI Engineer 3 days

    5. 5

      Add to homepage

      A data center power section.

      Co-Founder & CEO 1 day

    6. 6

      Use in outreach

      Data center lists and events.

      Member of Nontechnical Staff (GTM) ongoing

    First result
    2 months
    Cost
    About three weeks of one engineer's time
    Owner
    Electrical Engineer

    Smallest test

    Publish just the one-line diagram and load list first.

    Why it works

    Draft a redacted sample for a fictional data center electrical yard (utility interconnect, substation one-line, load list, cable schedule, generator and UPS datasheets), published in the same format as the meter station. Add a "Data center power" section to the homepage and a landing page for that sample. Use it in outbound and at data center events. A refinery or chemical unit sample can follow on the same pattern.

    Buyers look for their own project type in the proof; a matching sample turns "interesting" into "send us a basis".

    Risks and how to handle them

    • Client details leak into the sample

      Use a wholly fictional basis and have a second engineer check it.

    Evidence

    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source
    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source
  • 08

    The 9.7x claim rests on one sentence: an unnamed EPC timed its engineers with and without Torus. Competitors make similar claims (Gradon "75% less time per project"; Kent says its in-house agents cut a P&ID from "upwards of 30/40 hours" to "approximately five"). Torus is the only one that publishes the full package, so it can also be the only one that publishes the method.

    High impactMedium effort First result in 1 month Co Founder & CEO

    First action

    Ask the EPC for permission to publish anonymised timings.

    How to measure it

    Study-to-meeting conversions

    Now
    –
    Target
    10 meetings
    By
    2 quarters

    Steps

    1. 1

      Get approval

      Anonymised publication from the EPC.

      Co-Founder & CEO 1 week

    2. 2

      Collect timings

      Hours by discipline, with and without.

      Physical Infrastructure Engineer 1 week

    3. 3

      Add review time

      What engineers corrected before issue.

      Physical Infrastructure Engineer 3 days

    4. 4

      Write it

      Method, limits and results.

      Co-Founder & CEO 1 week

    5. 5

      Publish

      PDF plus page, linked from the claim.

      AI Engineer 1 day

    6. 6

      Use in sales

      Send to every procurement contact.

      Member of Nontechnical Staff (GTM) ongoing

    First result
    1 month
    Cost
    Staff time only
    Owner
    Co Founder & CEO

    Smallest test

    Add a one-paragraph method note under the 9.7x on the homepage.

    Why it works

    Write a 2-3 page study with the client's approval and identity removed: package scope, number of engineers, hours with and without Torus by discipline, what was excluded, review and correction time, and what the engineers changed before issue. Link it from every place the 9.7x appears and hand it to procurement teams.

    Engineering buyers trust a method they can check, and review time is the hidden cost every skeptic asks about.

    Risks and how to handle them

    • The EPC declines

      Run a fresh internal timing on the sample package and publish that instead.

    Builds on

    Evidence

    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source
    • Competitor researchGradon (heygradon.com): "The AI partner for your AEC firm"; works inside Civil 3D, Revit, ETABS, Bluebeam and dozens more named tools; claims "75% less time per project"; "Request access" books an intro call through a scheduling page.Source
    • Competitor researchKent, an energy engineering and project delivery firm, said on 16 May 2025 that its own AI agents generate P&IDs: a deliverable that took "upwards of 30/40 hours" now takes "approximately five", with engineers validating the output.Source
  • 09

    The blog has two strong, specific posts (B31.3 and line lists; FEL2 tie-points), both by the CTO and both from May 19, 2026, with nothing since. Meanwhile Torus is hiring engineers in eight disciplines, each expected to define what "correct" means for the agent. Those definitions are exactly the content that fills the empty category pages and shows buyers Torus understands their discipline.

    Medium impactMedium effort First result in 1 month Physical Infrastructure Engin…

    First action

    Ask the next discipline hire to draft a brief from their first month.

    How to measure it

    Blog-sourced pilot requests

    Now
    –
    Target
    3 a month
    By
    2 quarters

    Steps

    1. 1

      Set the format

      Problem, checks, sample sheet, 600 words.

      Co-Founder & CTO 1 day

    2. 2

      Plan topics

      One per discipline per month.

      Physical Infrastructure Engineer 2 days

    3. 3

      Write

      Engineer drafts, CTO edits.

      Physical Infrastructure Engineer monthly

    4. 4

      File correctly

      Discipline and phase tags.

      AI Engineer 1 hour

    5. 5

      Cut for social

      LinkedIn posts from each brief.

      Member of Nontechnical Staff (GTM) weekly

    6. 6

      Track

      Pilot requests by post.

      Member of Nontechnical Staff (GTM) monthly

    First result
    1 month
    Cost
    About half a day per engineer per month
    Owner
    Physical Infrastructure Engineer

    Smallest test

    Publish one electrical brief this month.

    Why it works

    Each discipline engineer writes one short brief a month in the house style: one problem from real practice (for example cable schedule drift against the load list), the checks Torus runs, and a sheet from the sample package showing it. File under discipline and phase so the category pages fill up, and cut each brief into a LinkedIn post for the GTM team.

    Practitioner-written, specific posts are what engineers share, and they turn hiring into visible depth in each discipline.

    Risks and how to handle them

    • Writing pulls engineers from client work

      Keep briefs short and reuse work already done for partners, fully anonymised.

    Builds on

    Evidence

    • Your websiteBlog: two posts, both dated May 19, 2026 and both by the CTO ("ASME B31.3 vs the line list: where the disagreement starts" and "Why FEL2 tie-points are where projects bleed"), both filed under Cross-discipline. Category pages such as "Electrical notes" show "Nothing filed here yet."Source
    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source
    • Your websiteFEL2 tie-point post: tie-point tables are "the contract between two scopes", go stale when the line list or PFD changes after freeze, and the mismatch usually surfaces in commissioning; it proposes three checks (stream identity, condition reconciliation, owner attestation). The B31.3 post lists four deterministic checks Torus runs on every package version.Source
  • 10

    The GTM hire's first job is finding and running events and conferences and booking meetings around them. Torus has something no rival brings to a booth: a 1,949-page package an engineer can flip through. Engineers at energy and process events judge drafting by touching the drawings.

    High impactMedium effort First result in 1 quarter Member of Nontechnical Staff

    First action

    Shortlist five engineering or energy events in the next two quarters with EPC attendance.

    How to measure it

    Meetings per event

    Now
    –
    Target
    8
    By
    2 quarters

    Steps

    1. 1

      Pick events

      EPC-heavy engineering and energy shows.

      Member of Nontechnical Staff (GTM) 1 week

    2. 2

      Print the kit

      Two bound volumes and the register.

      Member of Nontechnical Staff (GTM) 1 week

    3. 3

      Event intake

      A tagged link and QR per event.

      AI Engineer 1 day

    4. 4

      Pre-book

      Outbound to attendees before the show.

      Member of Nontechnical Staff (GTM) 2 weeks

    5. 5

      Run the booth

      Demo, volumes, CEO meetings.

      Co-Founder & CEO per event

    6. 6

      Follow up

      Within 48 hours with matching sheets.

      Member of Nontechnical Staff (GTM) 2 days

    First result
    1 quarter
    Cost
    Printing under $1,000 per kit, plus event fees and travel
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    Take one bound volume to the next local engineering meetup.

    Why it works

    Print and bind two volumes (for example 03 P&IDs and 06 Electrical) plus a one-page register. Bring a laptop showing the change-redraft demo (idea 16). Give each event its own intake link and QR code (from idea 1) offering "send us a basis from this show and we'll draft one package". Book CEO meetings at the event and log every one against it. Prioritise the engineering and energy events around Houston, where the electrical role is based.

    A physical package starts the conversation, and event-tagged intake gives the attribution the GTM role is measured on.

    Risks and how to handle them

    • Event costs outrun meetings

      Attend first without a booth and compare meetings per dollar.

    Builds on

    Evidence

    • HiringMember of Nontechnical Staff (GTM), San Francisco, $100K-$150K: finds and runs events and conferences and books meetings around them, builds outbound target lists and sequences, prepares the CEO for meetings, tests ads and billboards, and owns attribution (which channels produce meetings); measured on "qualified meetings booked for our CEO"; a GTM team of two in a company of about eight.Source
    • Your websitePackage register: 2 published packages, 264 documents and 1,957 pages; the gas receipt meter station is Revision A, issued 2026-09-29, "Issued for review"; the geothermal makeup well pad is an 8-sheet drawing set. Three drawing titles carry a literal, unfilled "{x}": PRO-DWG-108 "P&ID STATION OUTLET: OUTLET AND {x} INTERCONNECT", PIP-DWG-004 "{x} TIE-IN, OUTLET LATERAL" and INS-DWG-001 "CONTROL AND NETWORK ARCHITECTURE: SCADA, SIS, TELECOM, {x} I/F".Source
    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source
  • 11

    The GTM hire will build target lists and run outbound sequences, and Torus already has 264 published documents organised by discipline volume. A generic "AI drafting" email to a lead electrical engineer is easy to ignore. A link to Volume 06's one-line diagram and load list, drafted in about 5 hours with every value traced, is the kind of thing an engineer opens.

    High impactLow effort First result in 1 month Member of Nontechnical Staff

    First action

    Pick the two strongest documents for each of four personas.

    How to measure it

    Outbound positive replies

    Now
    –
    Target
    2x the generic sequence
    By
    60 days

    Steps

    1. 1

      Map personas

      Process, electrical, I&C, project manager.

      Member of Nontechnical Staff (GTM) 1 day

    2. 2

      Pick documents

      Two per persona, chosen with engineers.

      Physical Infrastructure Engineer 1 day

    3. 3

      Write sequences

      Three short steps, one question each.

      Member of Nontechnical Staff (GTM) 2 days

    4. 4

      Tag links

      Track opens of each PDF.

      Member of Nontechnical Staff (GTM) 1 hour

    5. 5

      Run A/B

      Against a generic sequence.

      Member of Nontechnical Staff (GTM) 4 weeks

    6. 6

      Brief the CEO

      Which sheet each meeting started from.

      Member of Nontechnical Staff (GTM) per meeting

    First result
    1 month
    Cost
    Existing outbound tools
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    Send 50 electrical leads the one-line and load list.

    Why it works

    Map each outbound persona to two documents: process leads to the heat and material balance and P&IDs, electrical leads to the one-line and load list, I&C leads to the loop diagrams and safety requirements specification, project managers to the cost estimate and schedule. Each sequence step links straight to that PDF (with a tracking parameter) and asks one question: "Would this pass your checker?" Measure replies by persona and document.

    Engineers answer to specifics in their own discipline, and the document itself does the persuading.

    Risks and how to handle them

    • Engineers spot errors in the sample

      Finish idea 2 first and welcome the critique as a conversation.

    Builds on

    Evidence

    • HiringMember of Nontechnical Staff (GTM), San Francisco, $100K-$150K: finds and runs events and conferences and books meetings around them, builds outbound target lists and sequences, prepares the CEO for meetings, tests ads and billboards, and owns attribution (which channels produce meetings); measured on "qualified meetings booked for our CEO"; a GTM team of two in a company of about eight.Source
    • Your websitePackage register: 2 published packages, 264 documents and 1,957 pages; the gas receipt meter station is Revision A, issued 2026-09-29, "Issued for review"; the geothermal makeup well pad is an 8-sheet drawing set. Three drawing titles carry a literal, unfilled "{x}": PRO-DWG-108 "P&ID STATION OUTLET: OUTLET AND {x} INTERCONNECT", PIP-DWG-004 "{x} TIE-IN, OUTLET LATERAL" and INS-DWG-001 "CONTROL AND NETWORK ARCHITECTURE: SCADA, SIS, TELECOM, {x} I/F".Source
  • 12

    Torus's security story is good (an isolated Managed tenant with request data dropped after each request, a Sovereign option where nothing leaves the network, SOC 2 Type 1 complete and Type 2 in progress), but it is one homepage section and one FAQ answer. Structured AI, which sells to engineering firms too, states a recurring SOC 2 Type 2 audit with the report available under NDA. Fortune 500 and EPC procurement will compare the two line by line.

    High impactMedium effort First result in 1 quarter Co Founder & CTO

    First action

    Collect the last three security questionnaires received and the answers given.

    How to measure it

    Security review time

    Now
    –
    Target
    -30%
    By
    2 quarters

    Steps

    1. 1

      Gather questions

      Past questionnaires and objections.

      Co-Founder & CTO 2 days

    2. 2

      Draw the architecture

      Managed and Sovereign data flows.

      Co-Founder & CTO 3 days

    3. 3

      Write the page

      Retention, access, subprocessors, SOC 2.

      Co-Founder & CTO 1 week

    4. 4

      Build the pack

      Questionnaire answers and DPA.

      Member of Nontechnical Staff (GTM) 1 week

    5. 5

      Add the NDA request

      Report request on the page.

      AI Engineer 1 day

    6. 6

      Update at Type 2

      Refresh the page when the audit completes.

      Co-Founder & CTO on completion

    First result
    1 quarter
    Cost
    Staff time; legal review of the DPA
    Owner
    Co Founder & CTO

    Smallest test

    Turn the existing security section into its own page with an NDA report request.

    Why it works

    Publish /security with an architecture diagram for Managed and Sovereign, data flow and retention, model and subprocessor policy (no training on customer data, if true), access control, SOC 2 status with the expected Type 2 window, and a "request the report under NDA" button. Prepare a standard questionnaire pack (security questionnaire answers, data processing addendum, insurance summary) that the GTM hire can send on the first call.

    Enterprise deals stall in security review; answering up front shortens it and stops Torus losing on paperwork.

    Risks and how to handle them

    • Overclaiming controls

      Only publish what the SOC 2 auditor has seen.

    Evidence

    • Your websiteProduct and security sections: a per-project email inbox ("When a message changes a design value, Torus redrafts every sheet it touches and sends them to your engineer to check"; the primer adds that a CC'd thread yields a drafted RFI, transmittal or memo); Managed deployment (isolated tenant, request data dropped after each request) or Sovereign ("nothing leaves your network"); SOC 2 Type 1 complete, Type 2 in progress.Source
    • Competitor researchStructured AI (getstructured.ai): "The AI drawing review platform for architects and engineers"; reviews sheets for errors, code issues and clashes; shows logos including Mott MacDonald and Syska Hennessy Group; states a recurring SOC 2 Type 2 audit with the report under NDA; "Book a Demo" on every section.Source
  • 13

    The pilot asks visitors to "send us a project basis", but nowhere does the site say what a basis is, which file types Torus reads, or which formats and tools the package arrives in, beyond "your firm's format". The AI engineer role is building ingestion for CAD files, drawings and spec packages. Gradon lists dozens of named tools on its homepage because that is the first question an engineering manager asks.

    Medium impactLow effort First result in 1 month AI Engineer

    First action

    List the input and output formats the product handles today.

    How to measure it

    Usable-basis rate

    Now
    –
    Target
    60% of requests
    By
    90 days

    Steps

    1. 1

      List formats

      Supported inputs and outputs today.

      AI Engineer 1 day

    2. 2

      Show a basis

      The meter station basis, redacted.

      Physical Infrastructure Engineer 1 day

    3. 3

      Write the page

      Inputs, outputs, standards, review.

      AI Engineer 2 days

    4. 4

      Add to FAQ

      Two new questions linking to it.

      Member of Nontechnical Staff (GTM) 1 hour

    5. 5

      Link the intake

      Next to the upload field.

      AI Engineer 1 hour

    6. 6

      Update

      As ingestion adds formats.

      AI Engineer monthly

    First result
    1 month
    Cost
    $0
    Owner
    AI Engineer

    Smallest test

    Add a "What is a project basis?" answer to the FAQ.

    Why it works

    Publish a single page: a sample project basis (the redacted basis behind the meter station package), accepted inputs (PDF drawings, CAD files, spreadsheets, spec packages, email threads), outputs (PDF sets, editable native files, registers), the firm standards Torus learns, and what the engineer reviews. Link it from the pilot intake so prospects send a usable basis the first time.

    It removes the "will this work with our files?" doubt before the first call and raises the quality of incoming pilots.

    Risks and how to handle them

    • Listing a format sets an expectation

      Mark formats as supported or in pilot.

    Builds on

    Evidence

    • Your websiteFAQ: seven questions covering scope ("P&IDs, PFDs and heat and material balances", one-lines, datasheets, calculations, specifications and estimates "in your firm's format"), the 9.7x timing, approval ("your engineer is credited as the preparer"), provenance ("the sheet, revision and line it came from"), the two example packages and data handling. Nothing on pricing, pilot scope or length, input file types, CAD tools or design standards.Source
    • HiringAI Engineer (interested in physical infrastructure), $150K-$250K: ingests messy engineering inputs (CAD files, drawings, spec packages), gets an extraction pipeline into production in the first month, and builds the engineer-facing workspaces and the path for outputs into a Fortune 500 partner's workflow; the agent is backed by domain engineers including electrical PEs and process engineers.Source
    • Competitor researchGradon (heygradon.com): "The AI partner for your AEC firm"; works inside Civil 3D, Revit, ETABS, Bluebeam and dozens more named tools; claims "75% less time per project"; "Request access" books an intro call through a scheduling page.Source
  • 14

    Buyers will meet three alternatives: drawing review platforms such as Structured AI ("The AI drawing review platform for architects and engineers"), AEC assistants such as Gradon that work inside Civil 3D and Revit, and EPCs building their own, as Kent says it has for P&IDs. Torus's FAQ already answers "Does Torus only check documents? No. Torus drafts the package." That one line is its clearest differentiator, and it is buried.

    Medium impactLow effort First result in 1 month Co Founder & CEO

    First action

    List the alternatives prospects named in the last ten conversations.

    How to measure it

    Comparison-page assisted meetings

    Now
    –
    Target
    5 a quarter
    By
    2 quarters

    Steps

    1. 1

      List alternatives

      From recent conversations.

      Member of Nontechnical Staff (GTM) 1 day

    2. 2

      Check claims

      Each category's current offer, from their own pages.

      Member of Nontechnical Staff (GTM) 2 days

    3. 3

      Write the page

      Fair, with when-to-choose guidance.

      Co-Founder & CEO 3 days

    4. 4

      Legal read

      Trademark and fairness check.

      Co-Founder & CEO 2 days

    5. 5

      One-pager

      For meetings and events.

      Member of Nontechnical Staff (GTM) 1 day

    6. 6

      Refresh

      Every quarter.

      Member of Nontechnical Staff (GTM) quarterly

    First result
    1 month
    Cost
    Staff time only
    Owner
    Co Founder & CEO

    Smallest test

    Move the "Does Torus only check documents?" answer onto the homepage.

    Why it works

    Publish one fair comparison page by category, not by naming rivals in a hostile way: review tools (check finished drawings), AEC assistants (task-level help inside design tools), in-house builds (one firm's own data), Torus (a complete, consistent multi-discipline package with traced values, Managed or Sovereign). Include when each is the right choice. Give the GTM hire a one-page version for meetings.

    Category clarity helps buyers explain Torus internally, and comparison searches are high intent.

    Risks and how to handle them

    • Out-of-date claims about others

      Compare categories, date the page and cite sources.

    Evidence

    • Competitor researchStructured AI (getstructured.ai): "The AI drawing review platform for architects and engineers"; reviews sheets for errors, code issues and clashes; shows logos including Mott MacDonald and Syska Hennessy Group; states a recurring SOC 2 Type 2 audit with the report under NDA; "Book a Demo" on every section.Source
    • Competitor researchGradon (heygradon.com): "The AI partner for your AEC firm"; works inside Civil 3D, Revit, ETABS, Bluebeam and dozens more named tools; claims "75% less time per project"; "Request access" books an intro call through a scheduling page.Source
    • Competitor researchKent, an energy engineering and project delivery firm, said on 16 May 2025 that its own AI agents generate P&IDs: a deliverable that took "upwards of 30/40 hours" now takes "approximately five", with engineers validating the output.Source
    • Your websiteFAQ: seven questions covering scope ("P&IDs, PFDs and heat and material balances", one-lines, datasheets, calculations, specifications and estimates "in your firm's format"), the 9.7x timing, approval ("your engineer is credited as the preparer"), provenance ("the sheet, revision and line it came from"), the two example packages and data handling. Nothing on pricing, pilot scope or length, input file types, CAD tools or design standards.Source
  • 15

    The only offer on the site is "Send us a project basis. We draft one package from it." There is nothing on pilot length, cost, what the firm must provide, or what counts as success, and the FAQ is silent on all of it. Open-ended pilots with large firms tend to drift, and a team of eight cannot run many at once.

    High impactMedium effort First result in 1 quarter Co Founder & CEO

    First action

    Write down the scope and outcome of every pilot run so far.

    How to measure it

    Pilot conversion rate

    Now
    –
    Target
    50%
    By
    2 quarters

    Steps

    1. 1

      Review past pilots

      Scope, length, outcome.

      Co-Founder & CEO 2 days

    2. 2

      Set the scope

      Package size and inputs required.

      Co-Founder & CEO 2 days

    3. 3

      Define the pass test

      Hours, check findings, schedule.

      Physical Infrastructure Engineer 2 days

    4. 4

      Price it

      Paid, or credited against a contract.

      Co-Founder & CEO 1 day

    5. 5

      Publish the outline

      On the site and in the intake.

      Member of Nontechnical Staff (GTM) 1 day

    6. 6

      Hold a close review

      Decision meeting at pilot end.

      Co-Founder & CEO per pilot

    First result
    1 quarter
    Cost
    Founder time
    Owner
    Co Founder & CEO

    Smallest test

    Use a written pass test in the next pilot.

    Why it works

    Define the pilot as a product: one package of agreed scope, a set calendar length, named client engineer reviewers, a pass test agreed up front (engineer hours against their baseline, issues found in check, schedule saved), and a priced conversion to a project or annual contract. Decide whether the pilot is paid or credited against the first contract. Publish the outline on the site and in the intake.

    Clear scope and a pre-agreed pass test turn pilots into decisions, and a paid or credited pilot filters for serious buyers.

    Risks and how to handle them

    • A price reduces pilot requests

      Credit the fee against the first contract.

    Builds on

    Evidence

    • Your websitePilot request (checked November 9, 2026): the "Request a pilot" button is a mailto link to [email protected]; the closing "Transmittal · Pilot request" block says "Send us a project basis. We draft one package from it." and "A founder replies within 24 hours.", with "Email us", Outlook on the web and Gmail compose links. There is no form, no input field and no calendar link, and both blog posts end with the same mailto button.Source
    • Your websiteFAQ: seven questions covering scope ("P&IDs, PFDs and heat and material balances", one-lines, datasheets, calculations, specifications and estimates "in your firm's format"), the 9.7x timing, approval ("your engineer is credited as the preparer"), provenance ("the sheet, revision and line it came from"), the two example packages and data handling. Nothing on pricing, pilot scope or length, input file types, CAD tools or design standards.Source
    • Y Combinator profileSummer 2026 batch, founded 2026, team of 8, San Francisco; tagline "Superintelligence for Infrastructure"; "Torus lets engineering firms and project owners build infrastructure 10x faster to reindustrialize America and the West."Source
  • 16

    Torus's sharpest claim isn't first-draft speed but what happens after a change: "When a message changes a design value, Torus redrafts every sheet it touches." The CTO's tie-point post explains why this matters: interface tables go stale after freeze and the mismatch surfaces in commissioning. Every EPC engineer has lived through a late change rippling through dozens of sheets, yet the site shows only the finished package.

    High impactMedium effort First result in 1 month Physical Infrastructure Engin…

    First action

    Pick one basis value whose change touches at least four volumes.

    How to measure it

    Demo-assisted pilot requests

    Now
    –
    Target
    30% of all requests
    By
    2 quarters

    Steps

    1. 1

      Pick the change

      One value touching four or more volumes.

      Physical Infrastructure Engineer 1 day

    2. 2

      Run it

      Capture affected sheets and traces.

      Physical Infrastructure Engineer 2 days

    3. 3

      Record

      Two-minute screen video with narration.

      Co-Founder & CTO 1 day

    4. 4

      Publish

      Homepage section and outbound link.

      AI Engineer 1 day

    5. 5

      Offer the ripple test

      One past change from a prospect's project.

      Member of Nontechnical Staff (GTM) ongoing

    6. 6

      Measure

      Views to pilot requests.

      Member of Nontechnical Staff (GTM) monthly

    First result
    1 month
    Cost
    About a week of staff time
    Owner
    Physical Infrastructure Engineer

    Smallest test

    Post the affected-sheet list for one change as a LinkedIn image.

    Why it works

    Build a two-minute recorded demo and a live version: change one value in the meter station basis (for example design flow or outlet pressure) and show the list of affected sheets across process, piping, electrical and instrumentation, with the redrafted values and their trace. Put the video on the homepage, use it in outbound and at events, and offer "send us one change from a past project and we'll show its ripple" as a lighter first step than a full pilot.

    It dramatises the pain engineers feel most (rework and change orders), and it is something a review-only tool cannot show.

    Risks and how to handle them

    • The live demo fails in front of a buyer

      Lead with the recording; run live only on the prepared basis.

    Evidence

    • Your websiteProduct and security sections: a per-project email inbox ("When a message changes a design value, Torus redrafts every sheet it touches and sends them to your engineer to check"; the primer adds that a CC'd thread yields a drafted RFI, transmittal or memo); Managed deployment (isolated tenant, request data dropped after each request) or Sovereign ("nothing leaves your network"); SOC 2 Type 1 complete, Type 2 in progress.Source
    • Your websiteFEL2 tie-point post: tie-point tables are "the contract between two scopes", go stale when the line list or PFD changes after freeze, and the mismatch usually surfaces in commissioning; it proposes three checks (stream identity, condition reconciliation, owner attestation). The B31.3 post lists four deterministic checks Torus runs on every package version.Source
  • 17

    Torus's FAQ says the client's engineer approves every sheet and "is credited as the preparer". These engineers are the ones whose hours Torus saves, and they move between projects and firms often, more so with a tight labour market (3 jobs for every qualified engineer, by the site's own figure). Today there is no programme to keep them close once a pilot ends.

    Medium impactLow effort First result in 1 quarter Member of Nontechnical Staff

    First action

    List every client engineer who has approved a Torus sheet.

    How to measure it

    Champion-sourced opportunities

    Now
    –
    Target
    3 a quarter
    By
    3 quarters

    Steps

    1. 1

      List champions

      Engineers who approved sheets.

      Member of Nontechnical Staff (GTM) 1 day

    2. 2

      Set benefits

      Early access and a private channel.

      Co-Founder & CEO 2 days

    3. 3

      Invite

      Personal note from a founder.

      Co-Founder & CEO 1 week

    4. 4

      Run the channel

      Discipline engineers answer questions.

      Physical Infrastructure Engineer weekly

    5. 5

      Watch job moves

      Reach out when a champion changes role.

      Member of Nontechnical Staff (GTM) monthly

    6. 6

      Track

      Opportunities by champion.

      Member of Nontechnical Staff (GTM) quarterly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    Invite the engineers from the timed study into a shared channel.

    Why it works

    Create a light champion programme for engineers who have approved Torus sheets: early access to new disciplines, a private channel with Torus's discipline engineers, credit in anonymised studies (with their employer's consent), and a simple "bring Torus to your next project" path that goes straight to the CEO. Track the number of new opportunities that come from a champion moving to a new project or firm.

    In enterprise engineering, the user who saved the hours is the most credible seller, and job moves carry the product into new firms.

    Risks and how to handle them

    • Client firms dislike direct contact with their staff

      Agree the programme with each client's project lead first.

    Evidence

    • Your websiteFAQ: seven questions covering scope ("P&IDs, PFDs and heat and material balances", one-lines, datasheets, calculations, specifications and estimates "in your firm's format"), the 9.7x timing, approval ("your engineer is credited as the preparer"), provenance ("the sheet, revision and line it came from"), the two example packages and data handling. Nothing on pricing, pilot scope or length, input file types, CAD tools or design standards.Source
    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source

Big bets 3

Larger plays that can change the trajectory.

  • 18

    A full-package pilot asks an EPC to hand over a project basis and trust a new tool with a whole deliverable set, which is a big first step for a firm Torus has never worked with. Torus already has a smaller product inside it: CC Torus on a project email thread and it drafts the RFI, transmittal or memo, and flags when a message changes a design value. That lives in email, where every project team already works.

    High impactHigh effort First result in 1 quarter Co Founder & CTO

    First action

    Ask two current partners whether they would CC Torus on one live project's thread.

    How to measure it

    Inbox-to-package conversion

    Now
    –
    Target
    40%
    By
    3 quarters

    Steps

    1. 1

      Scope the entry product

      RFIs, transmittals, memos and a change log.

      Co-Founder & CTO 2 weeks

    2. 2

      Harden the inbox

      Approval flow and firm templates.

      AI Engineer 1 month

    3. 3

      Price it

      Per project per month.

      Co-Founder & CEO 1 week

    4. 4

      Run two projects

      With current partners.

      Physical Infrastructure Engineer 60 days

    5. 5

      Show the ripple

      Sheets touched by logged changes.

      Physical Infrastructure Engineer 1 week

    6. 6

      Offer the package

      Pilot proposal from the evidence.

      Co-Founder & CEO 1 week

    7. 7

      Decide

      Keep as an entry product or fold back in.

      Co-Founder & CEO 2 quarters

    First result
    1 quarter
    Cost
    About one engineer-quarter
    Owner
    Co Founder & CTO

    Smallest test

    Run the inbox on one partner project for 30 days and count drafted items approved.

    Why it works

    Package the project inbox as an entry product for one live project: Torus reads the CC'd thread, drafts RFIs, transmittals and memos for approval, and keeps a running list of design values changed in correspondence. After 60 days, show the team which sheets those changes would have touched (the bridge to full drafting) and offer the package pilot. Deploy it in Managed or Sovereign like the core product.

    A small, low-risk first step builds trust and usage inside the project team, and the change log builds the case for the full package with the buyer's own data.

    Risks and how to handle them

    • Firms buy the inbox and stop there

      Price it to credit toward a package contract.

    • Email contains sensitive commercial content

      Offer Sovereign deployment and clear retention rules.

    Builds on

    Evidence

    • Your websiteProduct and security sections: a per-project email inbox ("When a message changes a design value, Torus redrafts every sheet it touches and sends them to your engineer to check"; the primer adds that a CC'd thread yields a drafted RFI, transmittal or memo); Managed deployment (isolated tenant, request data dropped after each request) or Sovereign ("nothing leaves your network"); SOC 2 Type 1 complete, Type 2 in progress.Source
    • Your websitePilot request (checked November 9, 2026): the "Request a pilot" button is a mailto link to [email protected]; the closing "Transmittal · Pilot request" block says "Send us a project basis. We draft one package from it." and "A founder replies within 24 hours.", with "Email us", Outlook on the web and Gmail compose links. There is no form, no input field and no calendar link, and both blog posts end with the same mailto button.Source
    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source
  • 19

    The CTO's blog already publishes the logic: three checks for FEL2 tie-point tables (stream identity, condition reconciliation, owner attestation) and four deterministic B31.3 checks between the line list and piping classes, which Torus runs on every package version. Those checks are useful on their own to any process or piping engineer with a spreadsheet, and the AI engineer is already building the extraction pipeline that reads messy inputs.

    High impactHigh effort First result in 2 quarters AI Engineer

    First action

    Turn the seven published checks into a test suite run against the meter station's own line list.

    How to measure it

    Checker-sourced pilot requests

    Now
    –
    Target
    10 a quarter
    By
    3 quarters

    Steps

    1. 1

      Codify the checks

      The seven published rules as tests.

      AI Engineer 2 weeks

    2. 2

      Build the parser

      Spreadsheet and PDF line lists.

      AI Engineer 1 month

    3. 3

      Validate

      Engineers test on sample and public data.

      Physical Infrastructure Engineer 2 weeks

    4. 4

      Ship the tool

      Upload, report, data dropped after each run.

      AI Engineer 2 weeks

    5. 5

      Launch

      Blog post, outbound and events.

      Member of Nontechnical Staff (GTM) 1 month

    6. 6

      Follow up

      Founder note on reports with real findings.

      Co-Founder & CEO weekly

    First result
    2 quarters
    Cost
    About one engineer-quarter plus hosting
    Owner
    AI Engineer

    Smallest test

    Offer the check as a free service by email to ten prospects.

    Why it works

    Release a free web tool: upload a line list and tie-point table (spreadsheet or PDF), get a report of mismatches against the published checks, with data dropped after each request, as in Managed. The report ends with "Torus drafts the whole package this consistently" and the pilot intake. Require a work email only to download the full report. Offer a Sovereign version for firms that cannot upload.

    A tool that finds a real error in an engineer's own document is the most convincing demo there is, and it brings in leads by discipline and project phase.

    Risks and how to handle them

    • False positives annoy engineers

      Launch with the deterministic checks only and label each finding with its rule.

    • Firms won't upload project data

      State retention plainly and offer the Sovereign version.

    Builds on

    Evidence

    • Your websiteFEL2 tie-point post: tie-point tables are "the contract between two scopes", go stale when the line list or PFD changes after freeze, and the mismatch usually surfaces in commissioning; it proposes three checks (stream identity, condition reconciliation, owner attestation). The B31.3 post lists four deterministic checks Torus runs on every package version.Source
    • HiringAI Engineer (interested in physical infrastructure), $150K-$250K: ingests messy engineering inputs (CAD files, drawings, spec packages), gets an extraction pipeline into production in the first month, and builds the engineer-facing workspaces and the path for outputs into a Fortune 500 partner's workflow; the agent is backed by domain engineers including electrical PEs and process engineers.Source
    • Your websiteProduct and security sections: a per-project email inbox ("When a message changes a design value, Torus redrafts every sheet it touches and sends them to your engineer to check"; the primer adds that a CC'd thread yields a drafted RFI, transmittal or memo); Managed deployment (isolated tenant, request data dropped after each request) or Sovereign ("nothing leaves your network"); SOC 2 Type 1 complete, Type 2 in progress.Source
  • 20

    Torus's YC profile says it lets "engineering firms and project owners" build infrastructure faster, and its job posts mention Fortune 500 partners alongside EPCs. The website speaks only to EPCs ("AI drafting for EPCs", "your engineers"). Owners (utilities, midstream operators, data center developers) feel the schedule and change-order cost directly, and the homepage's own argument ("fewer change orders and projects reach delivery sooner") is an owner's argument.

    High impactHigh effort First result in 2 quarters Co Founder & CEO

    First action

    Ask current Fortune 500 partners whether they act as owner or EPC and what they would buy as an owner.

    How to measure it

    Owner pilots signed

    Now
    –
    Target
    2
    By
    3 quarters

    Steps

    1. 1

      Interview owners

      Five owner-side engineering leads.

      Co-Founder & CEO 1 month

    2. 2

      Define the offer

      FEL package, stage-gate check or both.

      Co-Founder & CEO 2 weeks

    3. 3

      Write the page

      Schedule, change orders, traced values.

      Member of Nontechnical Staff (GTM) 1 week

    4. 4

      Agree EPC framing

      Work with, not around, the owner's EPC.

      Co-Founder & CEO 1 week

    5. 5

      Run two pilots

      With owner-side teams.

      Physical Infrastructure Engineer 1 quarter

    6. 6

      Decide

      Scale or stay EPC-first.

      Co-Founder & CEO 2 quarters

    First result
    2 quarters
    Cost
    Founder time plus one engineer for pilots
    Owner
    Co Founder & CEO

    Smallest test

    Add one owner paragraph to the homepage and track intake responses that choose "owner".

    Why it works

    Create an owner page and offer: Torus drafts the FEL package an owner uses to scope, compare bids or check an EPC's work, with traced values the owner keeps. Position it as working with the owner's EPC, not around it: owners can specify Torus-drafted packages or use Torus to check consistency at stage gates. Test with two owner conversations before building more.

    Owners control budgets and schedules across many projects; one owner relationship can bring several EPCs to Torus.

    Risks and how to handle them

    • EPC customers see Torus as a threat

      Position owner use as a way to specify and check, sharing the drafted package with the EPC.

    Builds on

    Evidence

    • Y Combinator profileSummer 2026 batch, founded 2026, team of 8, San Francisco; tagline "Superintelligence for Infrastructure"; "Torus lets engineering firms and project owners build infrastructure 10x faster to reindustrialize America and the West."Source
    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source
    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source

Wildcards 2

Unexpected experiments, each with a cheap way to test it.

  • 21

    Torus's GTM post lists billboards among the top-of-funnel tests, and its engineering posts point to Houston, Tulsa and Kansas City as partner locations. A billboard is usually unmeasurable, but a sheet from the package (a P&ID or one-line) with "Drafted in hours. Every value traced." and a unique short URL is both striking to an engineer and measurable through the intake.

    Medium impactMedium effort First result in 2 months Member of Nontechnical Staff

    First action

    Price two board options and set a cost-per-meeting ceiling.

    How to measure it

    Billboard cost per meeting

    Now
    –
    Target
    At or below the events channel
    By
    1 quarter

    Steps

    1. 1

      Set the ceiling

      Maximum cost per qualified meeting.

      Member of Nontechnical Staff (GTM) 1 day

    2. 2

      Pick the location

      Near engineering offices or a major event.

      Member of Nontechnical Staff (GTM) 1 week

    3. 3

      Design

      One sheet, one line, one short URL.

      Member of Nontechnical Staff (GTM) 1 week

    4. 4

      Build the page

      Dedicated landing page with intake.

      AI Engineer 2 days

    5. 5

      Run

      Four to eight weeks.

      Member of Nontechnical Staff (GTM) 1-2 months

    6. 6

      Compare

      Against events and outbound.

      Member of Nontechnical Staff (GTM) 1 week

    First result
    2 months
    Cost
    A few thousand dollars for one board for a month, depending on location
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    One digital board for four weeks near a large energy event.

    Why it works

    Run one small, time-boxed test: a billboard or digital board near an energy engineering district in Houston, showing a real sheet from the sample package and a unique short URL that opens a dedicated page with the package and the pilot intake (idea 1). Compare cost per qualified meeting against events and outbound before buying more.

    An engineering drawing on a billboard is unusual enough to be talked about, and the unique URL keeps the test honest.

    Risks and how to handle them

    • No measurable response

      Cap the spend and treat a null result as an answer.

    Builds on

    Evidence

    • HiringMember of Nontechnical Staff (GTM), San Francisco, $100K-$150K: finds and runs events and conferences and books meetings around them, builds outbound target lists and sequences, prepares the CEO for meetings, tests ads and billboards, and owns attribution (which channels produce meetings); measured on "qualified meetings booked for our CEO"; a GTM team of two in a company of about eight.Source
    • HiringPhysical Infrastructure Engineer (any discipline) and Electrical Engineer (San Francisco or Houston), $100K-$200K: Torus is "working with multiple Fortune 500s and major EPCs" on data centers, refineries, chemical plants and energy installations; it hires process, electrical, mechanical, civil, I&C, piping, structural and environmental engineers to own an agent's deliverables for a Fortune 500 partner within a month (electrical: SLDs, cable schedules, load lists); travel to Houston, Tulsa and Kansas City; the posts say Torus turns design work "that took 6 weeks into 6 hours".Source
  • 22

    Torus's whole case rests on an engineering capacity gap (137,000 firms, 3 jobs per qualified engineer, 25% retiring in 5 years) and its YC profile frames the mission as reindustrialisation. Nobody in its category owns that story with data. Once the figures are sourced (idea 5), Torus can publish the reference document that press, investors and EPC leaders cite.

    Medium impactMedium effort First result in 2 quarters Member of Nontechnical Staff

    First action

    List the public datasets that back each of the three homepage figures.

    How to measure it

    Brief downloads with work email

    Now
    –
    Target
    300
    By
    2 quarters after launch

    Steps

    1. 1

      Gather data

      Public workforce and project data.

      Member of Nontechnical Staff (GTM) 3 weeks

    2. 2

      Run a survey

      EPC engineering leads, short form.

      Member of Nontechnical Staff (GTM) 1 month

    3. 3

      Add Torus data

      Anonymised hours per deliverable.

      Co-Founder & CTO 2 weeks

    4. 4

      Write

      Ten pages with sources.

      Co-Founder & CEO 2 weeks

    5. 5

      Launch

      Event talk and trade press.

      Member of Nontechnical Staff (GTM) 1 month

    6. 6

      Repeat

      Yearly, same method.

      Member of Nontechnical Staff (GTM) yearly

    First result
    2 quarters
    Cost
    Staff time plus survey incentives
    Owner
    Member of Nontechnical Staff (GTM)

    Smallest test

    Publish one sourced chart on engineering workforce retirements.

    Why it works

    Publish a short annual brief: public workforce and project-pipeline data, plus a survey of EPC engineering leads on backlog, hiring and hours per package. Add Torus's own anonymised measurements of hours per deliverable type with and without drafting help. Launch it at an industry event, pitch it to trade press, and gate the full PDF behind the pilot intake's light version.

    A cited reference document earns links, press and invitations to speak, and it positions Torus as the authority on the problem it solves.

    Risks and how to handle them

    • Low survey response

      Start with public data and the champion group from idea 17.

    Builds on

    Evidence

    • Your websiteHomepage (checked November 9, 2026): title "Torus | AI drafting for EPCs"; H1 "Torus drafts complete engineering packages."; "your engineers can draft them 9.7x faster", based on one unnamed EPC timing its engineers with and without Torus; a sample gas receipt meter station package of 11 volumes, 256 documents and 1,949 pages drafted in "~5 hours" of engineer time; it names plants, pipelines, substations and treatment plants but not data centers or refineries; mission figures of "137,000" engineering firms, "3 jobs" for every qualified engineer and "25%" of the workforce retiring in 5 years, with no source cited; no named customers and no pricing.Source
    • Y Combinator profileSummer 2026 batch, founded 2026, team of 8, San Francisco; tagline "Superintelligence for Infrastructure"; "Torus lets engineering firms and project owners build infrastructure 10x faster to reindustrialize America and the West."Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

ProgrammableInfo

Turn the research into a list you can act on

These ideas start with finding the right companies. Info finds them and the right person at each, researches every one and drafts the outreach, then asks before it sends.

  • Build this list in Info for idea #11 (opens programmable.info in a new tab)

New accounts: 100,000 free credits with code BETA100K

Find the companies (opens programmable.info in a new tab)
ProgrammableTalk

Fill the events in this plan

These ideas are events. Talk gets registrants for them and tells you who's coming and what their company does before the day.

Plan an event (opens programmable.talk in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Truelogic growth strategyNearshore staff augmentation, managed teams, development centers, project outsourcing and AI Agile Labs (forward-deployed AI teams)…22 growth ideas
  • Sierra growth strategyA platform for customer-facing AI agents across chat, voice, SMS, WhatsApp, email and ChatGPT, with tools to build, test and improve them…21 growth ideas
  • Dan Martell (Martell Media) growth strategyBusiness education from Dan Martell: a YouTube channel with about 3.1 million subscribers, the Martell Method newsletter, the books Buy…20 growth ideas
  • Mars by GHC growth strategyAn Indian direct-to-consumer men's health brand from Good Health Company in Hyderabad, selling hair-loss, beard, performance, wellness and…21 growth ideas
  • Voltaiq growth strategyAn enterprise Battery AI platform that collects and harmonizes data from battery test and production equipment, links it to materials and…23 growth ideas
  • Agiloft growth strategyA no-code, data-first contract lifecycle management platform with Astra AI contract intelligence (including Screens), an integration hub…22 growth ideas
  • Scalar Field growth strategyAn agentic trading desk: research on point-in-time financial data, backtests in Python, and strategy agents that trade through connected…24 growth ideas
  • Automation Ace growth strategyA solo AI and automation consultancy that builds, fixes and maintains Zapier, Make, Airtable, API and webhook workflows, with a $25-a-week…24 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on November 10, 2026, and cites them throughout. Torus did not commission, review or endorse it, and Programmable is not affiliated with Torus. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Torus runs its business.

Something wrong, or do you represent Torus? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 306 ideas

    Fix the funnel and the proof: pilot intake with attribution, clean sample titles, empty category pages, one speed claim, sourced statistics, and get the sample package indexed.

  2. Days 31 to 6011 ideas

    Give the GTM hire channels it can measure, and give buyers what procurement asks for: a data center sample, the timing method, discipline briefs, an event kit, sample-led outbound, security and inputs pages, a comparison page, a fixed pilot, the change-impact demo and preparer champions.

  3. Days 61 to 905 ideas

    Commit to the bigger bets: the project inbox as a smaller first sale, a free consistency checker, a path for project owners, a tracked billboard test and a sourced engineering-capacity brief.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value A complete package in the firm's own format, not single drawings. The most cited problem: thousands of pages of drawings and calculations for each project.

  • Every value traced to the sheet, revision and line it came from
  • Too few qualified engineers and a retiring workforce
  • In their words: “project basis”

Market

Competitive landscape

4 competitors compared: Structured AI, Gradon, Kent (in-house AI) and DraftAid.

  • Gap to exploit: Complete, multi-discipline packages rather than single drawings or review
  • Structured AI: Reviews drawings rather than drafting full packages
  • Gradon: Civil, structural and MEP focus rather than EPC process packages

Hiring signals

Torus is an eight-person YC Summer 2026 company hiring for two things at once.

  • Member of Nontechnical Staff (GTM): First GTM hire measured on qualified CEO meetings and attribution. Ideas 1, 10, 11, 21.
  • Physical Infrastructure Engineer (any discipline): Eight disciplines, Fortune 500 and EPC deliverables. Ideas 2, 9, 16.
  • Electrical Engineer (San Francisco or Houston): SLDs, cable schedules and load lists for data centers and energy sites. Ideas 7, 21.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks firstNew accounts get 100,000 free enrichment credits with code BETA100K (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammableMediaAn AI note taker, interpreter and webinar host for your calls (opens programmable.media in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence