ProgrammableMarketing/veir.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 9
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Oct 23, 2026
  1. Programmable
  2. Playbooks
  3. VEIR
VEIR logo

growth playbook · Oct 23, 2026

veir.com (opens in a new tab)

VEIR growth playbook

Diagnosis

VEIR has a strong story (10x power density, a 3 MW STAR demonstration and a $110 million Series C, $225 million raised) and its hiring shows the move from demonstration to commercial projects: a marketing designer to own datasheets and renders, a senior product manager for the SL and ST lines with a guide specification and reference designs, a compliance lead for NEC, IEC and UL listings, and manufacturing, supply chain and test lab roles.

The website lags: no datasheets, a sitemap whose 25 news links all 404, mixed headline numbers, old transmission-line titles and a generic contact form. This playbook fixes those first, then gives engineers what they need to specify VEIR (guide spec, CAD blocks, reference designs, a calculator, a standards page) and builds proof through lab visits, OEM partners and the first deployment.

Growth Score

6/10

Biggest Opportunity

Give the engineers who decide projects the documents they work with, datasheets, guide specs, CAD blocks and reference designs, so VEIR gets written into designs early.

Biggest Risk

A new category asks buyers to trust a young supplier on performance, compliance and delivery at once; any gap in documentation or listing status slows every project.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    One datasheet each for SL-AC, SL-DC and ST, with renders, on the product pages

    Agree the datasheet fields with the Sr. Principal Technical PM.

    High impact First result in 1 month
  2. 2

    Point the sitemap at the news pages that exist: all 25 entries lead to 404s

    Fix the sitemap path in the site code.

    High impact First result in 2 weeks
  3. 3

    One set of headline numbers across the homepage, product pages and search results

    List every number on the site with its page.

    Medium impact First result in 1 month

02

Your idea portfolio

21 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 7 ideas are marked Unexpected: plays you are unlikely to have tried.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 2Big bets · 10Fill-ins · 6Reconsider · 3
Effort →

Showing 21 of 21 ideas

This week 6

Quick wins with a clear first action.

  • 01

    VEIR sells to EPC engineers and hyperscaler power teams who work from datasheets, and its new Marketing Designer is asked to ship datasheets in the first three months. Today the SL and ST pages describe the products in long prose (480 VAC and 800 VDC, 3 to 10 MW in a 4-inch cable, >200 MW at 34.5 kV in about 6 inches), and the resources page has one brochure and two white papers but no datasheet for any product. An engineer who wants to put VEIR into a design has nothing to download and nothing to forward to a colleague.

    High impactMedium effort First result in 1 month Marketing Designer

    First action

    Agree the datasheet fields with the Sr. Principal Technical PM.

    How to measure it

    Datasheet downloads

    Now
    –
    Target
    100 a quarter
    By
    1 quarter

    Steps

    1. 1

      Agree fields

      One template for all three variants.

      Sr. Principal Technical Product Manager 2 days

    2. 2

      Collect values

      Ratings that are released for publication.

      Sr. Principal Technical Product Manager 1 week

    3. 3

      Render

      Cutaways of the conductor assembly and terminations from CAD.

      Marketing Designer – 3D Visualization Specialist 2 weeks

    4. 4

      Lay out

      Two pages per variant in the brand system.

      Marketing Designer – 3D Visualization Specialist 1 week

    5. 5

      Compliance check

      Standards status worded accurately.

      Principal Electrical Compliance Engineer 2 days

    6. 6

      Publish

      Download button and key table on each product page.

      Marketing Lead 1 day

    7. 7

      Track

      Downloads by company domain to the commercial team.

      Marketing Lead weekly

    First result
    1 month
    Cost
    Contract designer time
    Owner
    Marketing Designer – 3D Visualization Specialist

    Smallest test

    Publish the SL-DC datasheet first and send it to five EPC contacts.

    Why it works

    Make a two-page datasheet per variant (SL-AC, SL-DC, ST): ratings (voltage, current, MW per circuit), cable diameter, termination footprint, cooling system footprint and utility needs, maximum run length, bend radius and installation notes, standards status, and a rendered cutaway from the CAD files. Put a download button and the key table on each product page, ungated or with an email-only form, and track downloads by company.

    Engineers shortlist with datasheets, and every download from a hyperscaler or EPC domain is a signal for the commercial team.

    Ready to use

    ChecklistDatasheet template

    [ ] Product name and variant (SL-AC, SL-DC, ST)
    [ ] Voltage and configuration
    [ ] Power and current per circuit
    [ ] Cable outer diameter and weight per metre
    [ ] Termination unit footprint
    [ ] Cooling system footprint and utilities
    [ ] Maximum run length
    [ ] Bend radius and pulling notes
    [ ] Standards and listing status
    [ ] Rendered cutaway
    [ ] Version and date

    Risks and how to handle them

    • Specs still changing

      Mark values as preliminary and date each version.

    • Competitors read them

      Publish ratings, not design details.

    Evidence

    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
    • Your websiteResources (checked October 22, 2026): one brochure ("VEIR Data Center Solutions", April 8, 2026), two white papers (April 1 and June 16, 2026, the latter on lifecycle emissions of superconducting feeders) and videos (the STAR demonstration, a CTO interview and a webinar). There is no datasheet, spec sheet, guide specification or CAD/BIM download for the SL or ST Series.Source
    • HiringSr. Principal Technical Product Manager: owns strategy across the "low voltage (SL Series) and medium voltage (ST Series) product lines"; deliverables include a "Product Requirements Document, guide specification, Cost of Goods Sold (COGS) model, serviceability strategy, customer-facing product and use case presentations"; joins "client, partner, and investor meetings"; shapes "joint development with OEM partners"; and supports Solutions Engineering on "LV AC, LV DC, and MV reference designs" for "hyperscale, neocloud and colocation customers".Source
  • 02

    VEIR's sitemap lists its 25 news stories at /articles/..., and every one returns "Page not found", while the real stories are at /news/.... Search engines are told to crawl dead pages instead of the Series C announcement and the STAR results, and the sitemap also lists /pookla, an unfinished copy of the solutions content.

    High impactLow effort First result in 2 weeks Marketing Lead

    First action

    Fix the sitemap path in the site code.

    How to measure it

    News pages indexed

    Now
    –
    Target
    25 of 25
    By
    30 days

    Steps

    1. 1

      Fix path

      Sitemap outputs /news/.

      Marketing Lead 1 hour

    2. 2

      Redirects

      /articles/* to /news/*.

      Marketing Lead 1 hour

    3. 3

      Remove draft

      /pookla out of the sitemap and index.

      Marketing Lead 1 hour

    4. 4

      Resubmit

      Search Console.

      Marketing Lead 1 hour

    5. 5

      Check

      Indexing report after two weeks.

      Marketing Lead 2 weeks

    6. 6

      Monitor

      Monthly crawl for 404s.

      Marketing Lead monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Marketing Lead

    Smallest test

    Fix the path today and test five URLs.

    Why it works

    Change the sitemap generator to output /news/ URLs, redirect /articles/... to /news/... in case any links use the old path, remove /pookla from the sitemap and unpublish or noindex it, and resubmit the sitemap in Search Console.

    The news section carries VEIR's biggest proof points; it should be the easiest part of the site to find.

    Risks and how to handle them

    • Other paths drift again

      Add a check to the deploy process.

    Evidence

    • Your websiteSitemap (39 URLs, re-checked October 22, 2026): all 25 news entries are listed at /articles/<slug>, and every sampled one returns "Page not found" (404, noindex), while the same stories live at /news/<slug>. The sitemap also lists /pookla, an unfinished copy of the solutions content with repeated blocks, under the homepage title.Source
    • Your websiteOctober 8, 2026: VEIR closed "an oversubscribed $110 million Series C financing round co-led by Matter Venture Partners and Tyche Partners, with participation from LG Technology Ventures, Gates Frontier, Sabanci Climate Ventures, and Hui Capital", bringing total capital raised to $225 million.Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source
  • 03

    VEIR's pages quote different numbers for the same benefit: the homepage says "7x reduction of losses", the search description says "90% less resistive line losses" and "5-10x greater transfer capacity", product pages say "negligible resistive losses", and STAR claims "over 5 times the distance". Technical buyers notice, and a datasheet will make the inconsistency obvious.

    Medium impactLow effort First result in 1 month Marketing Lead

    First action

    List every number on the site with its page.

    How to measure it

    Pages matching the claims sheet

    Now
    –
    Target
    100%
    By
    30 days

    Steps

    1. 1

      Inventory

      Every figure on every page.

      Marketing Lead 1 day

    2. 2

      Agree

      Claims sheet with sources.

      Sr. Principal Technical Product Manager 3 days

    3. 3

      Legal check

      Wording of "up to" claims.

      Legal 2 days

    4. 4

      Update pages

      Site and meta descriptions.

      Marketing Lead 1 day

    5. 5

      Update assets

      Brochure and decks.

      Marketing Designer – 3D Visualization Specialist 1 week

    6. 6

      Govern

      Review with each new test result.

      Sr. Principal Technical Product Manager quarterly

    First result
    1 month
    Cost
    $0
    Owner
    Marketing Lead

    Smallest test

    Fix the homepage meta description today.

    Why it works

    Agree one claims sheet with engineering (each number, its condition and its source test), update the homepage, meta description, solutions, STAR and brochure to match, and footnote each figure with its basis. Give the designer the sheet as the single source for all assets.

    Consistent, sourced numbers build credibility with engineers and protect the company in proposals.

    Risks and how to handle them

    • Smaller numbers look weaker

      State conditions; engineers trust specific over large.

    Evidence

    • Your websiteHomepage: "VEIR unlocks the next generation of AI computing infrastructure with superconducting power solutions"; figures "10x The power density of traditional (copper) solutions", "99.99% Availability", "7x Reduction of losses", "80% Reduction in copper tonnage (up to)", "35% Shortened timeline", "60% Less installation labor". The meta description that search results show says "superconducting power lines that offer 5-10x greater transfer capacity and 90% less resistive line losses".Source
    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source
    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
  • 04

    The About page title still reads "Advancing Electric Transmission Lines" and its description talks of transmission capacity for utilities, while VEIR's focus is now AI data centers behind the meter. Contact, STAR and others reuse the homepage title, so search results show several identical entries.

    Medium impactLow effort First result in 2 weeks Marketing Lead

    First action

    Rewrite the About title and description.

    How to measure it

    Search click-through

    Now
    –
    Target
    +15%
    By
    60 days

    Steps

    1. 1

      List pages

      All 14 main pages.

      Marketing Lead 1 hour

    2. 2

      Write titles

      Unique, under 60 characters.

      Marketing Lead 2 hours

    3. 3

      Write descriptions

      One benefit and one proof point.

      Marketing Lead 2 hours

    4. 4

      Publish

      In the CMS.

      Marketing Lead 1 hour

    5. 5

      Check

      Search Console queries.

      Marketing Lead 1 month

    6. 6

      Template

      News stories get their own titles automatically.

      Marketing Lead 1 day

    First result
    2 weeks
    Cost
    $0
    Owner
    Marketing Lead

    Smallest test

    Change the About page title today.

    Why it works

    Write a unique title and description for every page: About (superconducting power delivery for AI data centers), STAR (3 MW superconducting demonstration for AI racks), Contact (talk to VEIR about a data center project), Resources, Careers and each news story.

    Distinct, current titles improve click-through and stop search results from showing the old positioning.

    Risks and how to handle them

    • None

      Low-risk change.

    Evidence

    • Your websitePage titles and descriptions still carry the earlier positioning or none at all: the About page title is "About VEIR | Advancing Electric Transmission Lines" and its description talks of helping "data centers, energy producers, and utilities to rapidly accelerate growth in electric transmission capacity"; Contact, STAR and /pookla all use the homepage title "VEIR | Superconducting Data Centers".Source
    • HiringVEIR's description in every job post: "a U.S.-based designer and manufacturer of category-defining superconducting power delivery systems"; "~10× higher power density than conventional options, enabling 'speed-to-power'"; "VEIR's initial focus is AI data centers behind the meter, with solutions engineered for repeatable deployment through reference designs and integrated controls".Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source
  • 05

    VEIR's only contact form asks for a free-text message and a required "Date" field, and nothing about the project. Every inquiry, from a hyperscaler with a 200 MW campus to a student, lands in the same box.

    High impactLow effort First result in 2 weeks Marketing Lead

    First action

    Remove the required date field and add organisation type.

    How to measure it

    Qualified inquiries

    Now
    –
    Target
    +40%
    By
    90 days

    Steps

    1. 1

      Fields

      Six project questions.

      Sr. Principal Technical Product Manager 1 day

    2. 2

      Build

      Update the form.

      Marketing Lead 1 day

    3. 3

      Routing

      Commercial team alert.

      Marketing Lead 1 day

    4. 4

      Auto-reply

      Matching datasheet.

      Marketing Lead 1 day

    5. 5

      Log

      Projects by size and stage.

      Marketing Lead weekly

    6. 6

      Review

      Demand report to product.

      Sr. Principal Technical Product Manager monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Marketing Lead

    Smallest test

    Take the required date off the form today.

    Why it works

    Replace it with a short project form: organisation type (hyperscaler, colocation, EPC, OEM, utility, other), LV or MV, power in MW, run length, site stage (planning, design, construction) and target energisation date. Route qualified projects to the commercial team within a day and send a datasheet matching the answer.

    Qualified intake lets a small commercial team answer the right projects first and gives product a view of demand.

    Risks and how to handle them

    • Fewer general inquiries

      Keep a short "other" option.

    Evidence

    • Your websiteContact page: one general form with Full Name, Role, Company, Email, "What can we help you with?" and a required "Date" field. It does not ask for voltage class, power, distance, site stage or timeline.Source
    • HiringSr. Principal Technical Product Manager: owns strategy across the "low voltage (SL Series) and medium voltage (ST Series) product lines"; deliverables include a "Product Requirements Document, guide specification, Cost of Goods Sold (COGS) model, serviceability strategy, customer-facing product and use case presentations"; joins "client, partner, and investor meetings"; shapes "joint development with OEM partners"; and supports Solutions Engineering on "LV AC, LV DC, and MV reference designs" for "hyperscale, neocloud and colocation customers".Source
    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
  • 06

    VEIR's last quarterly newsletter in the archive is from July 2023 and the site has no sign-up. Since then it has run STAR, raised $110 million and moved to data centers. Engineers and buyers who visited once have no way to hear about the next milestone.

    Medium impactLow effort First result in 1 quarter Marketing Lead

    First action

    Add the sign-up form to the news page.

    How to measure it

    Subscribers

    Now
    –
    Target
    500
    By
    2 quarters

    Steps

    1. 1

      Sign-up form

      News and resources pages.

      Marketing Lead 1 day

    2. 2

      Template

      Brand email.

      Marketing Designer – 3D Visualization Specialist 2 days

    3. 3

      First issue

      Series C, STAR, datasheets.

      Marketing Lead 1 week

    4. 4

      Import

      Opted-in contacts.

      Marketing Lead 1 day

    5. 5

      Send

      Quarterly.

      Marketing Lead quarterly

    6. 6

      Measure

      Opens and clicks by company.

      Marketing Lead quarterly

    First result
    1 quarter
    Cost
    Email tool
    Owner
    Marketing Lead

    Smallest test

    Send one issue to recent inquiries.

    Why it works

    Add a sign-up to the news and resources pages, and send a short quarterly update: test results, new datasheets, events and hiring. Import contacts from events and inquiries who agreed to hear from VEIR.

    Long, technical buying cycles need regular, low-pressure contact, and a list is an asset VEIR owns.

    Risks and how to handle them

    • Too little news

      Quarterly is enough; skip filler.

    Evidence

    • Your websiteNewsroom and channels: the most recent newsletter in the news archive is "VEIR Quarterly Newsletter: July 2023" and the site has no newsletter sign-up; the YouTube channel has 14 videos and 36 subscribers.Source
    • Your websiteOctober 8, 2026: VEIR closed "an oversubscribed $110 million Series C financing round co-led by Matter Venture Partners and Tyche Partners, with participation from LG Technology Ventures, Gates Frontier, Sabanci Climate Ventures, and Hui Capital", bringing total capital raised to $225 million.Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source

This quarter 9

The core plays for the next three months.

  • 07

    The Sr. Principal Technical PM owns a "guide specification" among the core product deliverables. In data center and electrical construction, products get used when consulting engineers can write them into the specification. A public guide spec in the format they use makes VEIR the easy choice to specify.

    High impactMedium effort First result in 1 quarter Sr. Principal Technical Produ…

    First action

    Draft Part 2 (products) of the SL guide spec.

    How to measure it

    Guide spec downloads that become projects

    Now
    –
    Target
    5
    By
    3 quarters

    Steps

    1. 1

      Draft

      Three-part format.

      Sr. Principal Technical Product Manager 1 month

    2. 2

      Review

      Compliance and engineering.

      Principal Electrical Compliance Engineer 2 weeks

    3. 3

      Format

      Word and PDF.

      Marketing Designer – 3D Visualization Specialist 1 week

    4. 4

      Publish

      Resources and product pages.

      Marketing Lead 1 day

    5. 5

      Promote

      EPC and consulting-engineer contacts.

      Solutions Engineering Lead 1 month

    6. 6

      Follow up

      Review calls.

      Solutions Engineering Lead ongoing

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Sr. Principal Technical Product Manager

    Smallest test

    Share a draft with two friendly EPC engineers.

    Why it works

    Publish the guide specification for the SL Series (and ST when ready) in the standard three-part format used in construction specifications, as Word and PDF, with an email-only download. Offer a review call with Solutions Engineering for any project that uses it.

    Being written into the specification early is how new electrical products win projects, often before procurement starts.

    Risks and how to handle them

    • Spec ahead of listings

      State listing status plainly in the spec.

    Evidence

    • HiringSr. Principal Technical Product Manager: owns strategy across the "low voltage (SL Series) and medium voltage (ST Series) product lines"; deliverables include a "Product Requirements Document, guide specification, Cost of Goods Sold (COGS) model, serviceability strategy, customer-facing product and use case presentations"; joins "client, partner, and investor meetings"; shapes "joint development with OEM partners"; and supports Solutions Engineering on "LV AC, LV DC, and MV reference designs" for "hyperscale, neocloud and colocation customers".Source
    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
    • Your websiteResources (checked October 22, 2026): one brochure ("VEIR Data Center Solutions", April 8, 2026), two white papers (April 1 and June 16, 2026, the latter on lifecycle emissions of superconducting feeders) and videos (the STAR demonstration, a CTO interview and a webinar). There is no datasheet, spec sheet, guide specification or CAD/BIM download for the SL or ST Series.Source
  • 08

    The designer will build a rendering pipeline from engineering CAD. The same models, simplified, are what EPC and data center designers need to place VEIR in their layouts. Without them, the designer drawing the power room has to model VEIR from scratch or leave it out.

    High impactMedium effort First result in 2 quarters Marketing Designer

    First action

    Simplify the SL termination model.

    How to measure it

    CAD and BIM downloads

    Now
    –
    Target
    50 a quarter
    By
    2 quarters

    Steps

    1. 1

      Pick parts

      Three key components.

      Sr. Principal Technical Product Manager 1 week

    2. 2

      Simplify

      Remove internal detail.

      Mechanical Engineering 2 weeks

    3. 3

      Export

      CAD and BIM formats.

      Marketing Designer – 3D Visualization Specialist 1 week

    4. 4

      Add data

      Clearances and connections.

      Solutions Engineering Lead 1 week

    5. 5

      Publish

      Gated by email only.

      Marketing Lead 1 day

    6. 6

      Track

      Downloads to the commercial team.

      Marketing Lead weekly

    First result
    2 quarters
    Cost
    Staff time only
    Owner
    Marketing Designer – 3D Visualization Specialist

    Smallest test

    Share one block with a design partner.

    Why it works

    Publish simplified 3D blocks (termination units, conductor assembly cross-section, liquid nitrogen system) in common CAD and BIM formats, with clearances and connection points, behind an email-only form.

    Design files put VEIR into early layouts, and each download names a project team.

    Risks and how to handle them

    • IP exposure

      Publish envelopes, not internals.

    Evidence

    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
    • Your websiteResources (checked October 22, 2026): one brochure ("VEIR Data Center Solutions", April 8, 2026), two white papers (April 1 and June 16, 2026, the latter on lifecycle emissions of superconducting feeders) and videos (the STAR demonstration, a CTO interview and a webinar). There is no datasheet, spec sheet, guide specification or CAD/BIM download for the SL or ST Series.Source
  • 09

    VEIR's solutions are "engineered for repeatable deployment through reference designs", Solutions Engineering is developing LV AC, LV DC and MV reference designs, and the Series C funds commercial deployments with reference designs. The site has none of them.

    High impactMedium effort First result in 1 quarter Solutions Engineering Lead

    First action

    Choose the first design that can be public.

    How to measure it

    Design-pack requests

    Now
    –
    Target
    20 a quarter
    By
    2 quarters

    Steps

    1. 1

      Pick design

      Most mature first.

      Solutions Engineering Lead 1 week

    2. 2

      Simplify diagram

      Public version.

      Solutions Engineering Lead 1 week

    3. 3

      Render

      Layout visual.

      Marketing Designer – 3D Visualization Specialist 1 week

    4. 4

      Write page

      Benefits and connections.

      Marketing Lead 1 week

    5. 5

      Publish

      With pack request.

      Marketing Lead 1 day

    6. 6

      Repeat

      Other two designs.

      Solutions Engineering Lead 1 quarter

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Solutions Engineering Lead

    Smallest test

    Publish the LV DC design for 800 VDC.

    Why it works

    For each reference design, publish a page with a one-line diagram, where VEIR sits (power block, white space feeders, campus tie line), the equipment it connects to, the space and copper it saves, and a request for the full design pack.

    Reference designs turn a new technology into a familiar layout and shorten the first engineering conversation.

    Risks and how to handle them

    • Partner sensitivities

      Use generic equipment names.

    Evidence

    • HiringVEIR's description in every job post: "a U.S.-based designer and manufacturer of category-defining superconducting power delivery systems"; "~10× higher power density than conventional options, enabling 'speed-to-power'"; "VEIR's initial focus is AI data centers behind the meter, with solutions engineered for repeatable deployment through reference designs and integrated controls".Source
    • HiringSr. Principal Technical Product Manager: owns strategy across the "low voltage (SL Series) and medium voltage (ST Series) product lines"; deliverables include a "Product Requirements Document, guide specification, Cost of Goods Sold (COGS) model, serviceability strategy, customer-facing product and use case presentations"; joins "client, partner, and investor meetings"; shapes "joint development with OEM partners"; and supports Solutions Engineering on "LV AC, LV DC, and MV reference designs" for "hyperscale, neocloud and colocation customers".Source
    • News coverageVEIR plans to use the Series C "to expand manufacturing, advance its product portfolio and support initial commercial projects" and "is now working with customers and industry partners on commercial deployments and reference designs for AI facilities"; CEO: the round moves VEIR "from demonstrating the potential of superconducting power delivery to manufacturing and deploying systems at commercial scale".Source
    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
  • 10

    VEIR's pages promise up to 80% less copper, 60% less installation labor and far less excavation, but a buyer cannot see what that means for their own run. A calculator that takes power, voltage and distance and returns the copper equivalent makes the case specific.

    High impactMedium effort First result in 1 quarter Sr. Principal Technical Produ…

    First action

    Write the formulas and assumptions with engineering.

    How to measure it

    Study requests

    Now
    –
    Target
    15 a quarter
    By
    2 quarters

    Steps

    1. 1

      Formulas

      Conventional equivalents.

      Sr. Principal Technical Product Manager 2 weeks

    2. 2

      Review

      Engineering sign-off.

      Solutions Engineering Lead 1 week

    3. 3

      Design

      One-screen tool.

      Marketing Designer – 3D Visualization Specialist 1 week

    4. 4

      Build

      On the solutions page.

      Marketing Lead 2 weeks

    5. 5

      Study offer

      Email follow-up.

      Solutions Engineering Lead 1 week

    6. 6

      Track

      Inputs and requests.

      Marketing Lead monthly

    First result
    1 quarter
    Cost
    Development time
    Owner
    Sr. Principal Technical Product Manager

    Smallest test

    Run the math by hand for three past inquiries.

    Why it works

    Build a simple calculator: inputs MW, voltage (480 VAC, 800 VDC, 34.5 kV) and run length; outputs the conventional cable or busway equivalent, copper tonnage, tray or duct space, losses and the VEIR equivalent, with assumptions shown. Offer a full study by email.

    Personal numbers are more persuasive than headline claims, and the inputs qualify the lead.

    Risks and how to handle them

    • Over-simplified results

      Show assumptions and ranges.

    Evidence

    • Your websiteHomepage: "VEIR unlocks the next generation of AI computing infrastructure with superconducting power solutions"; figures "10x The power density of traditional (copper) solutions", "99.99% Availability", "7x Reduction of losses", "80% Reduction in copper tonnage (up to)", "35% Shortened timeline", "60% Less installation labor". The meta description that search results show says "superconducting power lines that offer 5-10x greater transfer capacity and 90% less resistive line losses".Source
    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
  • 11

    VEIR is hiring a Principal Electrical Compliance Engineer to set its framework across NEC, IEC and UL and to lead listing and approval processes. For a new technology, "is it listed, and how will the inspector see it?" comes up in every first meeting, and the site does not address it.

    High impactMedium effort First result in 2 quarters Principal Electrical Complian…

    First action

    List the standards and current status.

    How to measure it

    Deals stalled on compliance

    Now
    –
    Target
    -50%
    By
    3 quarters

    Steps

    1. 1

      List standards

      By product.

      Principal Electrical Compliance Engineer 2 weeks

    2. 2

      Status

      Tests and listings.

      Principal Electrical Compliance Engineer 1 week

    3. 3

      Write

      Plain-language page.

      Marketing Lead 1 week

    4. 4

      Review

      Legal.

      Legal 1 week

    5. 5

      Publish

      Linked from datasheets.

      Marketing Lead 1 day

    6. 6

      Update

      With each milestone.

      Principal Electrical Compliance Engineer quarterly

    First result
    2 quarters
    Cost
    Staff time only
    Owner
    Principal Electrical Compliance Engineer

    Smallest test

    Add a standards section to the SL datasheet.

    Why it works

    Publish a page with the applicable standards, the current status of listings and third-party tests, how VEIR supports authority-having-jurisdiction reviews, and a contact for compliance questions. Update it as listings come through.

    Answering the compliance question openly removes a blocker that otherwise stalls projects for weeks.

    Risks and how to handle them

    • Status looks early

      Show the plan and dates honestly.

    Evidence

    • HiringPrincipal Electrical Compliance Engineer: will "Establish and maintain VEIR's electrical compliance framework" across NEC, NFPA 70E, IEC 61439, IEC 62271, UL 508A, TIA-942 and Uptime Tier requirements, "Lead or support AHJ interactions, third-party inspections, and listing/approval processes", and support "customer-facing technical discussions, proposal development, and pre-sales support".Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source
    • Your websiteResources (checked October 22, 2026): one brochure ("VEIR Data Center Solutions", April 8, 2026), two white papers (April 1 and June 16, 2026, the latter on lifecycle emissions of superconducting feeders) and videos (the STAR demonstration, a CTO interview and a webinar). There is no datasheet, spec sheet, guide specification or CAD/BIM download for the SL or ST Series.Source
  • 12

    VEIR is hiring a Test Lab Manager, and STAR showed 3 MW in a simulated environment. For infrastructure buyers, seeing equipment run is the strongest proof. Woburn is close to Boston, a data center and engineering hub.

    High impactMedium effort First result in 1 quarter Test Lab Manager

    First action

    Pick a date and invite five engineers.

    How to measure it

    Visitor-to-project rate

    Now
    –
    Target
    25%
    By
    3 quarters

    Steps

    1. 1

      Plan

      Safe visitor route.

      Test Lab Manager 2 weeks

    2. 2

      Invite

      Customers and EPCs.

      Chief Product Officer 2 weeks

    3. 3

      Host

      Monthly.

      Test Lab Manager monthly

    4. 4

      Film

      Virtual tour.

      Marketing Designer – 3D Visualization Specialist 1 month

    5. 5

      Publish

      YouTube and STAR page.

      Marketing Lead 1 week

    6. 6

      Follow up

      Each visitor.

      Solutions Engineering Lead ongoing

    First result
    1 quarter
    Cost
    Hosting costs
    Owner
    Test Lab Manager

    Smallest test

    Host one visit this month.

    Why it works

    Run a monthly lab day for invited customer and EPC engineers: live demonstration, termination and cooling walk-through, Q&A with product. Film a ten-minute virtual tour for remote buyers and the YouTube channel.

    Seeing hardware run builds confidence that datasheets and renders cannot.

    Risks and how to handle them

    • Disrupts testing

      Fixed lab days only.

    Evidence

    • HiringTwelve open roles, all in Woburn, MA, many for building and testing product: Lead Manufacturing Engineer – Superconductor Power Terminations, Commodity Manager – Terminations, Logistics Coordinator, Test Lab Manager (posted October 19, 2026), Technical Project Manager and Principal Technical Program Manager.Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source
    • Your websiteNewsroom and channels: the most recent newsletter in the news archive is "VEIR Quarterly Newsletter: July 2023" and the site has no newsletter sign-up; the YouTube channel has 14 videos and 36 subscribers.Source
  • 13

    VEIR works with OEMs and the product lead is to shape "joint development with OEM partners" toward jointly developed power distribution products. Joint products need joint proof: a page and a datasheet both sides can use.

    High impactHigh effort First result in 2 quarters Chief Product Officer

    First action

    Agree one joint offer with an OEM partner.

    How to measure it

    Projects from OEM partners

    Now
    –
    Target
    3
    By
    3 quarters

    Steps

    1. 1

      Pick partner

      Most advanced joint work.

      Chief Product Officer 2 weeks

    2. 2

      Define offer

      Interfaces and scope.

      Sr. Principal Technical Product Manager 1 month

    3. 3

      Joint assets

      Page and datasheet.

      Marketing Designer – 3D Visualization Specialist 1 month

    4. 4

      Approve

      Both legal teams.

      Legal 1 month

    5. 5

      Launch

      Event presentation.

      Chief Product Officer 1 day

    6. 6

      Train

      Both sales teams.

      Solutions Engineering Lead 1 month

    First result
    2 quarters
    Cost
    Staff and event costs
    Owner
    Chief Product Officer

    Smallest test

    Draft a joint one-pager for internal review.

    Why it works

    With one OEM partner, publish a joint solution page and datasheet showing how VEIR connects to their equipment, present it together at a data center event, and train both sales teams.

    OEMs already sell to every data center; a joint offer puts VEIR into their conversations.

    Risks and how to handle them

    • Partner approvals are slow

      Start the legal review early.

    Evidence

    • HiringSr. Principal Technical Product Manager: owns strategy across the "low voltage (SL Series) and medium voltage (ST Series) product lines"; deliverables include a "Product Requirements Document, guide specification, Cost of Goods Sold (COGS) model, serviceability strategy, customer-facing product and use case presentations"; joins "client, partner, and investor meetings"; shapes "joint development with OEM partners"; and supports Solutions Engineering on "LV AC, LV DC, and MV reference designs" for "hyperscale, neocloud and colocation customers".Source
    • Your websiteAbout: VEIR "works with industry leading hyperscalers, chip developers, data center owners and operators, and original equipment manufacturers (OEMs)" and is backed by Microsoft's Climate Innovation Fund, National Grid Partners, Breakthrough Energy Ventures and others. The site shows investor logos but no customer stories or testimonials.Source
    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
  • 14

    Many of VEIR's buyers are licensed engineers who need continuing-education hours. A technical session on superconducting power delivery that counts toward those hours gets them to attend for their own reasons.

    Medium impactMedium effort First result in 2 quarters Marketing Lead

    First action

    Outline the course from the existing webinar.

    How to measure it

    Engineers trained

    Now
    –
    Target
    300
    By
    3 quarters

    Steps

    1. 1

      Outline

      From existing webinar.

      Solutions Engineering Lead 2 weeks

    2. 2

      Slides

      Brand system.

      Marketing Designer – 3D Visualization Specialist 2 weeks

    3. 3

      Approval

      Continuing-education rules.

      Marketing Lead 1 month

    4. 4

      Run

      Monthly online.

      Solutions Engineering Lead monthly

    5. 5

      Firm sessions

      On request.

      Solutions Engineering Lead ongoing

    6. 6

      Track

      Attendees to projects.

      Marketing Lead quarterly

    First result
    2 quarters
    Cost
    Staff time only
    Owner
    Marketing Lead

    Smallest test

    Run the webinar once for one EPC firm.

    Why it works

    Develop a one-hour, non-promotional course ("Superconducting power delivery for AI data centers") with the CTO and Solutions Engineering, apply for continuing-education approval where required, run it monthly online and at firms on request.

    Education reaches the people who write specifications, and credit makes it worth their time.

    Risks and how to handle them

    • Too promotional for credit

      Keep product mentions to the end.

    Evidence

    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
    • Your websiteNewsroom and channels: the most recent newsletter in the news archive is "VEIR Quarterly Newsletter: July 2023" and the site has no newsletter sign-up; the YouTube channel has 14 videos and 36 subscribers.Source
    • Your websiteResources (checked October 22, 2026): one brochure ("VEIR Data Center Solutions", April 8, 2026), two white papers (April 1 and June 16, 2026, the latter on lifecycle emissions of superconducting feeders) and videos (the STAR demonstration, a CTO interview and a webinar). There is no datasheet, spec sheet, guide specification or CAD/BIM download for the SL or ST Series.Source
  • 15

    VEIR's YouTube channel has 14 videos and 36 subscribers. The designer will produce renders every week. Short animated explainers (how a termination works, why a 4-inch cable replaces many copper runs) are easy to share inside buying teams.

    Medium impactLow effort First result in 1 quarter Marketing Designer

    First action

    Script the first explainer on the SL termination.

    How to measure it

    Monthly views

    Now
    –
    Target
    5,000
    By
    2 quarters

    Steps

    1. 1

      Topics

      Six explainers.

      Sr. Principal Technical Product Manager 1 week

    2. 2

      Script

      Engineering review.

      Solutions Engineering Lead 1 week

    3. 3

      Animate

      From renders.

      Marketing Designer – 3D Visualization Specialist 2 weeks

    4. 4

      Publish

      YouTube and LinkedIn.

      Marketing Lead monthly

    5. 5

      Embed

      Product pages.

      Marketing Lead monthly

    6. 6

      Measure

      Views and inquiries.

      Marketing Lead monthly

    First result
    1 quarter
    Cost
    Contract designer time
    Owner
    Marketing Designer – 3D Visualization Specialist

    Smallest test

    Publish one explainer.

    Why it works

    Make one 60-second explainer a month from renders and STAR footage, post on YouTube and LinkedIn, and embed each on the matching product page.

    Short visual explanations travel inside organisations and make complex products easier to champion.

    Risks and how to handle them

    • Over-simplification

      Engineering signs off each script.

    Evidence

    • Your websiteNewsroom and channels: the most recent newsletter in the news archive is "VEIR Quarterly Newsletter: July 2023" and the site has no newsletter sign-up; the YouTube channel has 14 videos and 36 subscribers.Source
    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
    • Your websiteSTAR (Superconducting Technology for AI Racks) demonstration: "more than 3 megawatts (MWs) of power in a simulated environment"; "up to 10 times greater power and over 5 times the distance of conventional options"; compatible with "advanced AC and DC architectures (including 800VDC formats)".Source

Big bets 3

Larger plays that can change the trajectory.

  • 16

    The Series C funds VEIR's move to initial commercial projects, and the site has investor logos but no customer stories. The first deployment story will be the most important sales asset VEIR ever publishes, and it needs data collected from day one.

    High impactHigh effort First result in 4 quarters Chief Product Officer

    First action

    Add a publicity clause discussion to the first project kickoff.

    How to measure it

    Case study published

    Now
    –
    Target
    Within 30 days of energisation
    By
    4 quarters

    Steps

    1. 1

      Agree terms

      What can be shared.

      Chief Product Officer 1 month

    2. 2

      Baseline

      Measures before install.

      Technical Project Manager 1 month

    3. 3

      Document

      Photos and film.

      Marketing Designer – 3D Visualization Specialist ongoing

    4. 4

      Measure

      Results after energisation.

      Solutions Engineering Lead 1 month

    5. 5

      Write

      Case study and video.

      Marketing Lead 1 month

    6. 6

      Launch

      With press.

      CEO & Co-Founder 1 day

    First result
    4 quarters
    Cost
    Production costs
    Owner
    Chief Product Officer

    Smallest test

    Write the measurement plan for the first project.

    Why it works

    Agree with the first customer what can be published, set baseline measures (space, copper, installation hours, schedule), film installation and energisation, and prepare a case study, video and datasheet addendum for launch.

    Proof from a live data center is what moves later buyers from interest to purchase.

    Risks and how to handle them

    • Customer declines naming

      Prepare an anonymous version.

    Evidence

    • News coverageVEIR plans to use the Series C "to expand manufacturing, advance its product portfolio and support initial commercial projects" and "is now working with customers and industry partners on commercial deployments and reference designs for AI facilities"; CEO: the round moves VEIR "from demonstrating the potential of superconducting power delivery to manufacturing and deploying systems at commercial scale".Source
    • Your websiteAbout: VEIR "works with industry leading hyperscalers, chip developers, data center owners and operators, and original equipment manufacturers (OEMs)" and is backed by Microsoft's Climate Innovation Fund, National Grid Partners, Breakthrough Energy Ventures and others. The site shows investor logos but no customer stories or testimonials.Source
    • Your websiteHomepage: "VEIR unlocks the next generation of AI computing infrastructure with superconducting power solutions"; figures "10x The power density of traditional (copper) solutions", "99.99% Availability", "7x Reduction of losses", "80% Reduction in copper tonnage (up to)", "35% Shortened timeline", "60% Less installation labor". The meta description that search results show says "superconducting power lines that offer 5-10x greater transfer capacity and 90% less resistive line losses".Source
  • 17

    Buyers of critical infrastructure worry whether a young supplier can deliver on time. VEIR is hiring a Lead Manufacturing Engineer for terminations, a commodity manager and logistics, and the Series C funds manufacturing capacity.

    Medium impactHigh effort First result in 3 quarters Lead Manufacturing Engineer

    First action

    Draft what can be said about capacity and lead times.

    How to measure it

    Deals raising supply concerns

    Now
    –
    Target
    -50%
    By
    4 quarters

    Steps

    1. 1

      Draft

      Capacity and quality.

      Lead Manufacturing Engineer – Superconductor Power Terminations 1 month

    2. 2

      Supply chain

      Approach summary.

      Commodity Manager - Terminations 1 month

    3. 3

      Film

      Factory video.

      Marketing Designer – 3D Visualization Specialist 1 month

    4. 4

      Review

      Confidentiality.

      Legal 2 weeks

    5. 5

      Publish

      Manufacturing page.

      Marketing Lead 1 day

    6. 6

      Update

      Quarterly.

      Lead Manufacturing Engineer – Superconductor Power Terminations quarterly

    First result
    3 quarters
    Cost
    Production costs
    Owner
    Lead Manufacturing Engineer – Superconductor Power Terminations

    Smallest test

    Add one factory photo set to the About page.

    Why it works

    Publish a manufacturing page: capacity plans, quality system, supply chain approach for superconducting tape and terminations, lead times and a factory video. Update it as capacity grows.

    Visible manufacturing reduces delivery risk in the buyer's mind, which matters as much as performance.

    Risks and how to handle them

    • Revealing suppliers

      Describe approach, not names.

    Evidence

    • HiringTwelve open roles, all in Woburn, MA, many for building and testing product: Lead Manufacturing Engineer – Superconductor Power Terminations, Commodity Manager – Terminations, Logistics Coordinator, Test Lab Manager (posted October 19, 2026), Technical Project Manager and Principal Technical Program Manager.Source
    • News coverageVEIR plans to use the Series C "to expand manufacturing, advance its product portfolio and support initial commercial projects" and "is now working with customers and industry partners on commercial deployments and reference designs for AI facilities"; CEO: the round moves VEIR "from demonstrating the potential of superconducting power delivery to manufacturing and deploying systems at commercial scale".Source
    • HiringVEIR's description in every job post: "a U.S.-based designer and manufacturer of category-defining superconducting power delivery systems"; "~10× higher power density than conventional options, enabling 'speed-to-power'"; "VEIR's initial focus is AI data centers behind the meter, with solutions engineered for repeatable deployment through reference designs and integrated controls".Source
  • 18

    The ST Series can carry over 200 MW at 34.5 kV in existing distribution right-of-ways, and VEIR says campuses needing high-voltage tie lines face "siting and permitting delays". National Grid Partners is an investor. Time to power is the scarcest thing in data center development.

    High impactHigh effort First result in 4 quarters Chief Product Officer

    First action

    List three campuses known to be waiting on tie lines.

    How to measure it

    Studies signed

    Now
    –
    Target
    2
    By
    4 quarters

    Steps

    1. 1

      Define offer

      Screening and study.

      Sr. Principal Technical Product Manager 1 month

    2. 2

      Utility partner

      One interested utility.

      Chief Product Officer 1 quarter

    3. 3

      Developer pilot

      One campus.

      Chief Product Officer 1 quarter

    4. 4

      Study

      Route and permitting.

      Solutions Engineering Lead 1 quarter

    5. 5

      Publish

      Anonymised result.

      Marketing Lead 1 month

    6. 6

      Scale

      More utilities.

      Chief Product Officer 2 quarters

    First result
    4 quarters
    Cost
    Study costs
    Owner
    Chief Product Officer

    Smallest test

    Run one desktop screening for a developer.

    Why it works

    Package an "MV tie line" offer for campuses stuck on interconnection: a site screening, a joint study with the utility, and a route design. Pilot with one utility and one developer.

    Selling months of saved time to developers waiting for power is a large, urgent market beyond the white space.

    Risks and how to handle them

    • Utility timelines are slow

      Run the study in parallel with permitting.

    Evidence

    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
    • Your websiteAbout: VEIR "works with industry leading hyperscalers, chip developers, data center owners and operators, and original equipment manufacturers (OEMs)" and is backed by Microsoft's Climate Innovation Fund, National Grid Partners, Breakthrough Energy Ventures and others. The site shows investor logos but no customer stories or testimonials.Source
    • HiringVEIR's description in every job post: "a U.S.-based designer and manufacturer of category-defining superconducting power delivery systems"; "~10× higher power density than conventional options, enabling 'speed-to-power'"; "VEIR's initial focus is AI data centers behind the meter, with solutions engineered for repeatable deployment through reference designs and integrated controls".Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 19

    VEIR's June white paper argues superconducting feeders reduce lifecycle emissions, and the ST page claims >50% less concrete, backfill and copper. Hyperscalers have sustainability teams with their own budgets and targets, who rarely see power-delivery vendors.

    Medium impactLow effort First result in 1 quarter Marketing Lead

    First action

    Extract the calculation method from the white paper.

    How to measure it

    Sustainability contacts in deals

    Now
    –
    Target
    5
    By
    3 quarters

    Steps

    1. 1

      Method

      From white paper.

      Solutions Engineering Lead 2 weeks

    2. 2

      Build

      Simple calculator.

      Marketing Lead 2 weeks

    3. 3

      Summary

      One page.

      Marketing Designer – 3D Visualization Specialist 1 week

    4. 4

      Review

      Claims check.

      Legal 1 week

    5. 5

      Publish

      Resources page.

      Marketing Lead 1 day

    6. 6

      Introduce

      To sustainability teams.

      Chief Product Officer ongoing

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Marketing Lead

    Smallest test

    Share the one-pager with one hyperscaler sustainability lead.

    Why it works

    Turn the white paper method into a short calculator (embodied carbon of copper, concrete and excavation avoided) and a one-page summary for sustainability teams, and invite them to the engineering conversation.

    A second champion inside the buyer, with a different budget, can speed decisions.

    Risks and how to handle them

    • Greenwashing concerns

      Show the method and sources.

    Evidence

    • Your websiteResources (checked October 22, 2026): one brochure ("VEIR Data Center Solutions", April 8, 2026), two white papers (April 1 and June 16, 2026, the latter on lifecycle emissions of superconducting feeders) and videos (the STAR demonstration, a CTO interview and a webinar). There is no datasheet, spec sheet, guide specification or CAD/BIM download for the SL or ST Series.Source
    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
    • Your websiteHomepage: "VEIR unlocks the next generation of AI computing infrastructure with superconducting power solutions"; figures "10x The power density of traditional (copper) solutions", "99.99% Availability", "7x Reduction of losses", "80% Reduction in copper tonnage (up to)", "35% Shortened timeline", "60% Less installation labor". The meta description that search results show says "superconducting power lines that offer 5-10x greater transfer capacity and 90% less resistive line losses".Source
  • 20

    Real visitors pass Core Web Vitals today, but LCP has slowed by about 25% and the phone lab test takes 5.6s, with about 100 KB of unused JavaScript. The site is about to add renders, datasheets and video.

    Low impactLow effort First result in 1 month Marketing Lead

    First action

    Review Tag Manager for unused tags.

    How to measure it

    75th-percentile LCP

    Now
    –
    Target
    Under 2s
    By
    60 days

    Steps

    1. 1

      Audit tags

      Remove unused.

      Marketing Lead 1 day

    2. 2

      Image rules

      Sizes and formats.

      Marketing Designer – 3D Visualization Specialist 1 day

    3. 3

      Lazy video

      Below the fold.

      Marketing Lead 1 day

    4. 4

      Budget

      Page weight limit.

      Marketing Lead 1 day

    5. 5

      Retest

      PageSpeed.

      Marketing Lead 1 hour

    6. 6

      Monitor

      Monthly field data.

      Marketing Lead monthly

    First result
    1 month
    Cost
    $0
    Owner
    Marketing Lead

    Smallest test

    Remove one unused tag and retest.

    Why it works

    Remove unused scripts and tags in Tag Manager, set image size rules for renders, lazy-load video, and set a page-weight budget for new pages.

    Keeping the site fast while adding heavy assets protects the experience for engineers on site networks.

    Risks and how to handle them

    • Breaking analytics

      Test tags in preview first.

    Evidence

    • PageSpeedGoogle PageSpeed: mobile score 69 (desktop 99), lab LCP 5.6s on a phone, with about 100 KB of unused JavaScript. Real Chrome visitors pass Core Web Vitals (75th-percentile LCP 2.2s, INP 87 ms, CLS 0), though LCP has slowed by about 25%.Source
    • HiringMarketing Designer – 3D Visualization Specialist (6-month contract, Woburn, posted October 16, 2026): will "own all visual communication for VEIR", turning "CAD files from Engineering" into "photorealistic product renderings", and "own consistency across datasheets, brochures, whitepapers, and web assets" for "EPC engineers, power management professionals, and hyperscaler buyers". In the first 3 months: "Ship 5-10 marketing assets (datasheets, infographics, web graphics)"; customers named are "hyperscalers, data center owners and operators, OEMs, EPC firms, utilities".Source
  • 21

    VEIR's pages explain rack power rising from 10–30 kW toward hundreds of kilowatts and the move to 800 VDC, but only inside product pages. Engineers search for these problems directly, and Supernode, MetOx, Nexans and Vertiv each cover only part of the story.

    Medium impactMedium effort First result in 2 quarters Marketing Lead

    First action

    Pick the first guide topic from recent inquiries.

    How to measure it

    Monthly guide visits

    Now
    –
    Target
    3,000
    By
    3 quarters

    Steps

    1. 1

      Topics

      Four problems.

      Solutions Engineering Lead 1 week

    2. 2

      Write

      Technical guides.

      Solutions Engineering Lead 1 month

    3. 3

      Illustrate

      Diagrams.

      Marketing Designer – 3D Visualization Specialist 2 weeks

    4. 4

      Publish

      With links.

      Marketing Lead 1 day

    5. 5

      Promote

      Newsletter and LinkedIn.

      Marketing Lead monthly

    6. 6

      Measure

      Visits and inquiries.

      Marketing Lead monthly

    First result
    2 quarters
    Cost
    Staff time only
    Owner
    Marketing Lead

    Smallest test

    Publish the 800 VDC guide first.

    Why it works

    Write a small set of guides on the problems VEIR solves: overhead congestion in AI white space, 800 VDC distribution, behind-the-meter MV corridors and time to power. Link each to the matching product page, datasheet and calculator.

    Problem-led guides reach engineers before they know superconducting is an option.

    Risks and how to handle them

    • Too promotional

      Explain the problem fully before the product.

    Evidence

    • Your websiteLow Voltage Solutions: the SL Series "supports both 480 VAC and 800 VDC implementations" and "scales from 3 to 10 megawatts (MW) of power capacity in a 4-inch diameter cable"; four components (conductor assembly, termination units, liquid nitrogen cooling system, operations and maintenance control system); SL-AC and SL-DC variants, with "Up to 2 unipolar circuits ... each one carrying up to 5 MW of power at 800 VDC". The page notes rack power "historically ranged from 10 – 30 kW" and is "now moving toward hundreds of kilowatts", with a shift toward DC distribution.Source
    • Your websiteMedium Voltage Solutions: the ST Series for "behind-the-meter and grid connection applications"; "At 34.5 kV, a VEIR ST conductor assembly can deliver >200 MW in an approximately 6-inch diameter cable"; "5× Less Excavation", "3–6 Months Faster", "50% Lower Costs" (up to); a closed-loop design for distances up to 2 miles, with "10 miles or beyond" planned.Source
    • Competitor researchOther companies' own homepages: Supernode designs "superconducting connection systems to connect renewable generation & increase grid interconnection"; MetOx is "a leading U.S. producer of high-temperature superconducting (HTS) wire" for "next-generation power infrastructure"; Nexans designs "advanced cabling systems" in 41 countries; Vertiv sells "critical digital infrastructure" for data centers, including conventional power distribution.Source
    • HiringVEIR's description in every job post: "a U.S.-based designer and manufacturer of category-defining superconducting power delivery systems"; "~10× higher power density than conventional options, enabling 'speed-to-power'"; "VEIR's initial focus is AI data centers behind the meter, with solutions engineered for repeatable deployment through reference designs and integrated controls".Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

ProgrammableTalk

Fill the events in this plan

These ideas are events. Talk gets registrants for them and tells you who's coming and what their company does before the day.

Plan an event (opens programmable.talk in a new tab)
ProgrammableDigital

Show it, don't just describe it

These ideas need something to show: a demo, a video, an animation, graphics or a deck. Digital turns screenshots or the site into all of them, in the company's own brand.

Make a demo (opens programmable.digital in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Chasi AI growth strategyAI agents for equipment dealers and rental companies that answer calls, texts, WhatsApp and web chat 24/7, draft quotes from the dealer's…23 growth ideas
  • RiseGuide growth strategyAn expert-powered self-improvement and microlearning app: daily 15-minute lessons in Communication Mastery, Intelligence Training and…22 growth ideas
  • Ooak Data growth strategyLicenses operational data from real companies (documents, Slack, email, Jira, CRM and more), anonymizes it into structurally faithful…23 growth ideas
  • Simtra BioPharma Solutions growth strategyA contract development and manufacturing organization (CDMO) for sterile injectables: formulation and lyophilization development…21 growth ideas
  • Hanover Park growth strategyAn AI-native fund administrator: a proprietary general ledger, fund administration with expert fund accountants, portfolio intelligence…21 growth ideas
  • Maze growth strategyAn AI-native application security platform whose agents investigate and fix vulnerabilities across code (AI-SAST, AI-SCA) and cloud…20 growth ideas
  • Kate's Real Food growth strategyAn organic snack bar brand born in the Rocky Mountains and made in its own facility in Bedford, PA: honey-sweetened energy bars, protein…22 growth ideas
  • TheFork growth strategyEurope's leading restaurant booking platform: a free diner app and website with verified reviews and the Yums loyalty program, TheFork…21 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on October 23, 2026, and cites them throughout. VEIR did not commission, review or endorse it, and Programmable is not affiliated with VEIR. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how VEIR runs its business.

Something wrong, or do you represent VEIR? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    Datasheets, the sitemap fix, one claims sheet, new titles, the project form and the newsletter; trim scripts.

  2. Days 31 to 6011 ideas

    Guide spec, CAD blocks, reference designs, calculator, standards page, lab days, OEM co-marketing, engineer training and explainers; the emissions calculator and problem guides.

  3. Days 61 to 903 ideas

    Prepare the first deployment case study, the manufacturing page and a grid-connection offer.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value far more power in far less space. The most cited problem: overhead congestion and heavy copper in AI white space.

  • Less copper, excavation and installation labor
  • Waiting for power and high-voltage tie lines
  • In their words: “speed-to-power”

Market

Competitive landscape

4 competitors compared: Conventional copper cable and busway (e.g. Vertiv and other infrastructure vendors), Nexans, Supernode and MetOx.

  • Gap to exploit: Specifiable documentation for superconducting systems
  • Conventional copper cable and busway (e.g. Vertiv and other infrastructure vendors): Weight, space and losses at AI densities
  • Nexans: Not focused on data center white space

Hiring signals

VEIR is moving from demonstration to commercial projects.

  • Marketing Designer – 3D Visualization Specialist: Datasheets, renders and web assets for engineers. Ideas 1, 8, 15.
  • Sr. Principal Technical Product Manager: SL and ST lines, guide specification, reference designs. Ideas 7, 9, 10, 13.
  • Principal Electrical Compliance Engineer: NEC, IEC and UL listings. Idea 11.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks first (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence