ProgrammableMarketing/jeevyfabrication.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 7
  • This quarter · 9
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Nov 10, 2026
  1. Programmable
  2. Playbooks
  3. Jeevy Fabrication
Jeevy Fabrication logo

growth playbook · Nov 10, 2026

jeevyfabrication.com (opens in a new tab)

Jeevy Fabrication growth playbook

Diagnosis

Jeevy has grown quickly from a 2025 Y Combinator start-up into a two-shop, 30-person Texas fabricator with $9M of contracted FY26 capacity, its own software (Gnosis) shipping several releases a day, and engineering hires for an AI estimator, a knowledge graph and controls-integrated skids. The website has not caught up.

It talks to shops and staff ("Join the Network", "Log in") but gives buyers no way to send drawings for a quote. Without JavaScript the homepage shows only a tagline, the Research page lists no papers, there is no sitemap, and the three recent jobs have no detail.

This playbook first opens a buyer front door: a drawing-upload quote request answered by the estimator, a readable homepage, crawl files, and a clear network application. Next come proof (case studies, a sample traceability pack, the buyer's view of Gnosis) and focused pages for data center cooling and controls-integrated skids. The big bets are a launch-site partner shop, measured bid-time savings and a capacity report built from network data.

Growth Score

6/10

Biggest Opportunity

Turn Jeevy's software lead into the buyer's first experience: a drawing upload that returns a fast first-pass quote, followed by visible schedules, photo evidence and traceability.

Biggest Risk

Buyers judge a fabricator on proof and responsiveness. With no quote path, no case studies and out-of-date profiles, Jeevy can look smaller than it is next to instant-quote marketplaces like Xometry and well-funded factories like Hadrian, and its growth depends on hiring enough welders and fitters to deliver.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Give buyers a front door: a "Send us your drawings" quote request on the Capabilities page, answered by the estimator

    Put a "Request a quote" link in the header today, pointing to a simple upload form, even before it connects to Gnosis.

    High impact First result in 2-4 weeks
  2. 2

    Make the homepage say what Jeevy builds before JavaScript runs

    View the homepage source and list what is missing from the raw HTML.

    High impact First result in 1 month
  3. 3

    Tell fabricators who qualifies for the network and what happens after they apply

    Write the five criteria Jeevy actually uses to accept a shop.

    High impact First result in 1 month

02

Your idea portfolio

22 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 8 ideas are marked Unexpected: plays you are unlikely to have tried.

    2 of these are things Programmable can build and run for you.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 4Big bets · 8Fill-ins · 7Reconsider · 3
Effort →

Showing 22 of 22 ideas

This week 7

Quick wins with a clear first action.

  • 01

    The Capabilities page lists five code-certified services and three recent jobs, but its only calls to action are "Join the Network" and "Log in", both aimed at shops and staff. A buyer with a skid or spool package has nowhere to upload drawings: /contact and /quote return 404, and the fallback is a general email address. Meanwhile Jeevy is hiring an Agent Engineer to build an estimator that produces first-pass quotes, and Xometry, a buyer's default alternative, leads with "Upload your files, get an instant quote".

    High impactLow effort First result in 2-4 weeks CEO

    First action

    Put a "Request a quote" link in the header today, pointing to a simple upload form, even before it connects to Gnosis.

    How to measure it

    Website RFQs

    Now
    –
    Target
    8 qualified RFQs a month
    By
    90 days

    Steps

    1. 1

      Define the fields

      Service type, codes, quantity, need-by date, site and upload; under ten fields.

      CEO 1 day

    2. 2

      Build the form

      Header button, a /quote page and links under each recent-work photo; large file uploads.

      Web developer 3 days

    3. 3

      Route into Gnosis

      Each submission creates a quote with the files attached.

      CTO 1 week

    4. 4

      Draft with the estimator

      The estimator agent drafts the BOM and schedule; a person checks it.

      Agent Engineer (Senior) 2 weeks

    5. 5

      Reply in one business day

      First-pass range plus the open questions blocking a firm bid.

      Estimator ongoing

    6. 6

      Confirm next steps

      A confirmation page and email saying what happens next and when.

      Web developer 1 day

    7. 7

      Track

      RFQs, response time, bid conversion and win rate by service.

      CEO monthly

    First result
    2-4 weeks
    Cost
    A few days of web work; estimator time already exists
    Owner
    CEO

    Smallest test

    Add the header link and a basic upload form this week and count submissions for 30 days.

    Why it works

    Add a "Request a quote" button to the header and the Capabilities page. It opens a short form: drawing and spec upload (PDF, STEP, DWG), service type (skid, structural, process piping, launch infrastructure, data center fluids), applicable codes (ASME B31.3, AWS D1.1/D1.2), quantity, need-by date, delivery site and contact details. Each submission becomes a quote in Gnosis, which keeps it off the shop floor until it is won, so the estimator can draft a bill of materials and schedule. An estimator replies within one business day with a first-pass range and the questions that block a firm bid. Add a smaller "Quote a job like this" link under each recent-work photo.

    Buyers of welded assemblies compare several bidders against a deadline, and the one who makes it easy to send a drawing package and answers first usually gets the bid. Jeevy's own thesis is that drawing processing is the slow, costly step (about 9 hours per drawing). A public intake makes that strength the first thing a buyer experiences, and every upload becomes real material for the estimator agent.

    Ready to use

    ChecklistQuote request form

    [ ] "Request a quote" button in the header and on /capabilities
    [ ] Upload: PDF, STEP, DWG, specs (multiple files)
    [ ] Service: skid / structural / process piping / launch infrastructure / data center fluids
    [ ] Codes: ASME B31.3, AWS D1.1, AWS D1.2, other
    [ ] Quantity and need-by date
    [ ] Delivery site and field install needed?
    [ ] Name, company, email, phone
    [ ] Confirmation: first-pass reply within one business day
    [ ] Submission creates a quote in Gnosis

    Risks and how to handle them

    • Small, unqualified requests

      Ask for codes, quantity and need-by date, and route small one-off jobs to network shops.

    • Controlled or export-sensitive drawings

      State how controlled data is handled and offer a secure transfer on request.

    Evidence

    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source
    • HiringAgent Engineer (Senior), posted September 24, 2026 (San Francisco or Fort Worth): builds agents across "quoting, project management, scheduling, procurement, quality, and production", such as an estimator that produces first-pass quotes, a project agent that turns purchase orders into work orders and schedules, and a production agent that flags likely schedule misses; agents may not act "unless their conclusions can be traced back to source documents"; customers are aerospace, energy and infrastructure companies.Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
    • Competitor researchXometry's homepage: "Quote Custom Parts in Seconds" and "Upload your files, get an instant quote, and order online"; 90,000 buyers and 5,000 suppliers; certifications listed include AS9100D, ITAR and CMMC Level 2.Source
  • 02

    Read without running JavaScript, jeevyfabrication.com shows only the logo and "Precision as Responsibility": no services, industries, codes or links. Google renders JavaScript, but many crawlers, link previewers and AI assistants read only the raw HTML, so to them Jeevy is a name and a tagline. The earlier site led with "Aerospace Piping and Skid Assemblies", the words buyers actually search for.

    High impactLow effort First result in 1 month Web developer

    First action

    View the homepage source and list what is missing from the raw HTML.

    How to measure it

    Non-brand search impressions

    Now
    –
    Target
    +50%
    By
    90 days

    Steps

    1. 1

      Check the raw HTML

      Fetch the homepage as text and note what is missing.

      Web developer 1 hour

    2. 2

      Render statically

      Move hero and system copy into server-rendered markup.

      Web developer 2 days

    3. 3

      Rewrite the H1 and subhead

      Name what Jeevy builds and where.

      CEO 1 hour

    4. 4

      Match the meta description

      Same services and codes as the subhead.

      CEO 1 hour

    5. 5

      Add structured data

      Organization and LocalBusiness with the Cleburne address.

      Web developer 2 hours

    6. 6

      Retest

      Text-only fetch shows services and links.

      Web developer 1 hour

    7. 7

      Measure

      Search Console impressions by query.

      Web developer monthly

    First result
    1 month
    Cost
    2-3 days of developer time
    Owner
    Web developer

    Smallest test

    Add a static H1 and two-sentence description to the HTML and recheck with a text-only fetch.

    Why it works

    Statically render the homepage hero and system sections in Next.js so the HTML itself contains the H1, a one-line description naming skids, ASME B31.3 process piping, AWS D1.1 structural work, launch infrastructure and data center fluids, the Cleburne, Texas location, and links to Capabilities and the quote form. Bring a plain-language line like "Aerospace piping and skid assemblies" back into the H1 or subhead, and match the meta description to it.

    Crawlers and AI assistants can only index and quote what they can read. Buyers search by part type and code, not by tagline.

    Risks and how to handle them

    • Design changes break the hero animation

      Keep the video and motion as progressive enhancement over static text.

    Evidence

    • Your websiteHomepage: title "Jeevy Fabrication" and meta description "Engineering, fabrication, and software. One accountable team delivering mission-critical systems."; read without running JavaScript, the page shows only the logo and "Precision as Responsibility", with no services, industries or links; no social share image. The earlier WordPress site led with "Aerospace Piping and Skid Assemblies"; the site now runs on Next.js.Source
    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source
  • 03

    Both /sitemap.xml and /robots.txt return 404. The site has a growing docs area for Gnosis and a very long changelog, plus capabilities, network and careers pages, but nothing tells search engines which pages exist or how often they change.

    Medium impactLow effort First result in 2 weeks Web developer

    First action

    Add app/sitemap.ts and app/robots.ts and deploy.

    How to measure it

    Pages indexed in Search Console

    Now
    –
    Target
    All public pages
    By
    30 days

    Steps

    1. 1

      List pages

      Marketing pages, docs, changelog, careers, network.

      Web developer 1 hour

    2. 2

      Generate the sitemap

      With last-modified dates from the docs content.

      Web developer 2 hours

    3. 3

      Add robots.txt

      Allow public pages and point to the sitemap.

      Web developer 30 minutes

    4. 4

      Submit

      Google Search Console and Bing Webmaster Tools.

      Web developer 30 minutes

    5. 5

      Check coverage

      Fix pages reported as excluded.

      Web developer 1 week

    6. 6

      Keep it current

      New pages appear automatically on deploy.

      Web developer ongoing

    First result
    2 weeks
    Cost
    $0
    Owner
    Web developer

    Smallest test

    Deploy the two files today and submit the sitemap.

    Why it works

    Generate a sitemap from the Next.js app (app/sitemap.ts) listing every public page, including each docs page with its last-modified date, and a robots.txt that points to it. Submit both in Google Search Console and Bing Webmaster Tools, and check which pages are indexed a week later.

    A sitemap gets new and updated pages discovered faster, and the docs show shops the depth of Gnosis before they ever talk to Jeevy.

    Risks and how to handle them

    • Indexing pages meant for logged-in users

      Include only public marketing and docs pages.

    Evidence

    • Your websiteCrawl files (checked November 10, 2026): /sitemap.xml and /robots.txt both return 404, while the site has a multi-section docs area and a changelog over 150,000 characters long.Source
    • Your websiteDocs (Gnosis): "How the app works, one page per screen", written for shop-floor users: quote-to-project, a Gantt task planner with dependencies and conflicts, materials and BOM-driven work orders, "sending work to other shops" and shop profiles, quoting (bids sent as PDF or email), an AI assistant and an inbox agent, time clocks and a shared kiosk. No pricing and no statement of who can sign up.Source
  • 04

    "Research" is in the main navigation and the page promises "We publish our thinking openly" on fabrication networks, capacity planning and the economics of distributed manufacturing, but no papers are listed, and /research returns 404. Jeevy already has a sharp thesis from its launch: about 9 hours to process one drawing, a 10% win rate, about 90 hours of bidding per job won.

    Medium impactMedium effort First result in 1 month CEO

    First action

    Pull bid hours from the last 20 quotes in Gnosis.

    How to measure it

    Paper-assisted RFQs and applications

    Now
    –
    Target
    10
    By
    90 days

    Steps

    1. 1

      Gather data

      Hours per drawing and win rates from recent quotes.

      Estimator 3 days

    2. 2

      Outline

      Problem, method, numbers, what changes.

      CEO 1 day

    3. 3

      Write

      2,000 words with two charts.

      CEO 1 week

    4. 4

      Review

      Check every number against source data.

      CTO 2 days

    5. 5

      Publish

      HTML and PDF; fix the /research redirect.

      Web developer 1 day

    6. 6

      Share

      Founder LinkedIn posts and emails to network shops.

      CEO 1 week

    First result
    1 month
    Cost
    Founder and estimator time
    Owner
    CEO

    Smallest test

    Post the 90-hour math with one chart on LinkedIn and see who replies.

    Why it works

    Write "The bidding tax on American fabrication": the method, the numbers from Jeevy's own quotes (hours per drawing before and after Gnosis), what it costs shops and buyers, and how a network changes it. Publish it ungated as an HTML page with a PDF, link it from the homepage and network page, and redirect /research to /research/white-papers. Until it is live, show "First paper coming" rather than an empty list.

    A specific, numbers-led paper earns links and shares from shop owners and buyers, and it gives the network page a reason to believe the 80% claim.

    Risks and how to handle them

    • Numbers reveal pricing

      Publish hours and ratios, not rates or customer names.

    Evidence

    • Your websiteResearch page (/research/white-papers): "We publish our thinking openly. Each paper reflects a real problem we're solving", covering "fabrication networks, capacity planning, and the economics of distributed manufacturing", but no papers are listed; /research returns 404 although "Research" is in the main navigation.Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
  • 05

    The Network page lists seven strong perks, from the Bid Board to CWI and metallurgist support, but gives no eligibility criteria, member count or next step, and the apply page, as read, shows no form fields or requirements. A shop owner deciding whether to share capacity wants to know which codes are needed, how jobs are assigned and how payment works.

    High impactLow effort First result in 1 month Network Manager

    First action

    Write the five criteria Jeevy actually uses to accept a shop.

    How to measure it

    Qualified applications

    Now
    –
    Target
    10 a month
    By
    90 days

    Steps

    1. 1

      Write criteria

      Processes, codes, inspection, capacity, location.

      Network Manager 1 day

    2. 2

      Explain the flow

      From Bid Board to payment, in four steps.

      Network Manager 1 day

    3. 3

      Build the form

      Seven fields, plain HTML, confirmation email.

      Web developer 2 days

    4. 4

      Route applications

      Into Gnosis or a shared inbox with an owner.

      CTO 1 day

    5. 5

      Reply in three days

      Accept, ask for documents or decline politely.

      Network Manager ongoing

    6. 6

      Track

      Applications, acceptances and first jobs.

      Network Manager monthly

    First result
    1 month
    Cost
    A few days of staff time
    Owner
    Network Manager

    Smallest test

    Add the criteria and a mailto apply button this week.

    Why it works

    Add three blocks to /network: "Who we're looking for" (processes, codes such as AWS D1.1 or ASME B31.3, inspection access, typical job size, open capacity), "How it works" (Bid Board, award, running the job in Gnosis, payment terms) and a short application (shop name, location, processes, certifications, equipment, open capacity, contact). Make sure the form renders as plain HTML, and promise a reply within three business days.

    Clear criteria and a visible next step raise application rates and screen out shops that would not fit, which saves the network team time.

    Risks and how to handle them

    • Too many unqualified shops

      Ask for certifications up front.

    Evidence

    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source
    • Your websiteAbout page: "We're building the AI operating system for post-knowledge fabrication"; a 72-acre Texas facility, 2 fabrication shops in Texas "with expansion planned through a partner network", "$9M" FY26 capacity described as contracted fabrication revenue, and 30 staff (engineers, welders, technicians and project managers); leaders previously worked at SpaceX; Gnosis is "The coordination layer between managers and the shop floor", with live schedules, task assignments, photo evidence and blocker alerts.Source
  • 06

    The homepage has no social share image. Founders, recruiters and network shops share Jeevy links on LinkedIn, in email and by text, and each one shows a bare card with only a name, even though the site has strong shop-floor photos.

    Medium impactLow effort First result in 1 week Web developer

    First action

    Export a 1200x630 image of a finished skid.

    How to measure it

    LinkedIn referral sessions

    Now
    –
    Target
    +30%
    By
    60 days

    Steps

    1. 1

      Pick images

      One per key page from existing photos.

      CEO 1 hour

    2. 2

      Size them

      1200x630 with the logo.

      Web developer 2 hours

    3. 3

      Add tags

      og:image, og:title, og:description per page.

      Web developer 2 hours

    4. 4

      Test

      LinkedIn Post Inspector and a text message preview.

      Web developer 30 minutes

    5. 5

      Reshare

      Repost the careers and network pages.

      CEO 1 day

    6. 6

      Measure

      Referral sessions from LinkedIn.

      Web developer monthly

    First result
    1 week
    Cost
    $0
    Owner
    Web developer

    Smallest test

    Add the homepage image today and check the LinkedIn preview.

    Why it works

    Add Open Graph and Twitter card images and descriptions for each key page: a finished skid on the shop floor for the homepage, the recent-work photos for Capabilities, the team for Careers and a perk summary for Network. Check each in LinkedIn's Post Inspector.

    Rich previews get more clicks from the channels a B2B fabricator actually relies on: LinkedIn, email and referrals.

    Risks and how to handle them

    • Photos show customer hardware

      Use images already cleared for the website.

    Evidence

    • Your websiteHomepage: title "Jeevy Fabrication" and meta description "Engineering, fabrication, and software. One accountable team delivering mission-critical systems."; read without running JavaScript, the page shows only the logo and "Precision as Responsibility", with no services, industries or links; no social share image. The earlier WordPress site led with "Aerospace Piping and Skid Assemblies"; the site now runs on Next.js.Source
    • HiringCareers page: hiring "across operations, engineering, finance, and software" with "shop-floor impact", but no individual roles are listed there (candidates are pointed to careers@); the Ashby board shows three roles, all in software and controls engineering, none for welders, fitters or project managers.Source
  • 07

    Real visitors pass Core Web Vitals (field LCP 1.8s), so this is not a Google problem. But the homepage downloads 11.2 MB, and in Google's phone test the hero video is the largest element, appearing after 3.9s. Field engineers and shop owners often open links on cellular data at a site.

    Low impactLow effort First result in 1 week Web developer

    First action

    Re-encode the hero video and add a poster image.

    How to measure it

    Homepage download size

    Now
    –
    Target
    Under 3 MB, mobile lab LCP under 2.5s
    By
    30 days

    Steps

    1. 1

      Add a poster

      Compressed WebP or AVIF first frame.

      Web developer 1 hour

    2. 2

      Re-encode the video

      Shorter loop, lower bitrate, under 2 MB.

      Web developer 2 hours

    3. 3

      Defer loading

      Load after interaction; respect data-saver.

      Web developer 2 hours

    4. 4

      Self-host fonts

      Remove render-blocking font requests.

      Web developer 2 hours

    5. 5

      Trim JavaScript

      Remove unused code on the homepage.

      Web developer 1 day

    6. 6

      Retest

      PageSpeed mobile and desktop.

      Web developer 30 minutes

    First result
    1 week
    Cost
    $0
    Owner
    Web developer

    Smallest test

    Add the poster image and re-run PageSpeed.

    Why it works

    Use a compressed poster image as the first frame and largest element, then load a shorter, compressed video (under 2 MB) after the page is interactive, and skip autoplay when the browser signals data saving. Self-host the fonts to remove render-blocking requests, and trim unused JavaScript.

    A lighter page loads quickly on weak connections and costs visitors less data, without changing the design.

    Risks and how to handle them

    • The video looks worse

      Compare encodes side by side on a phone before shipping.

    Evidence

    • PageSpeedPageSpeed (November 10, 2026): mobile 88/100, desktop 99; lab mobile LCP 3.9s with the hero video as the largest element; the homepage downloads 11.2 MB; top fixes are render-blocking requests (about 0.75s), unused JavaScript (about 0.45s) and image delivery (about 0.3s). Real visitors pass Core Web Vitals (field LCP 1.8s, CLS 0).Source

This quarter 9

The core plays for the next three months.

  • 08

    Jeevy's recent work is three photos with one-line captions: an aerospace ground support steel assembly, large-bore stainless spools and a high-pressure manifold, with no size, code, schedule or outcome. A rival skid fabricator's case study on 14 NASA launch-site skids gives dimensions, a 60% weld reduction from mandrel bending and a finish "many weeks earlier" than the next bidder, then ends with a quote request.

    High impactMedium effort First result in 1 quarter Project Manager

    First action

    Pick the job with the best photo record in Gnosis and ask the customer for permission.

    How to measure it

    Case-study-assisted RFQs

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      Pick jobs

      Three with good records and willing customers.

      Project Manager 1 week

    2. 2

      Ask permission

      Named, or anonymised by industry.

      CEO 2 weeks

    3. 3

      Pull the facts

      Codes, sizes, weld counts, schedule from Gnosis.

      Project Manager 3 days

    4. 4

      Write

      Problem, spec, approach, schedule, result.

      Project Manager 1 week

    5. 5

      Publish

      Under /capabilities with the quote form.

      Web developer 2 days

    6. 6

      Use in bids

      Attach the closest case study to every quote.

      Estimator ongoing

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Project Manager

    Smallest test

    Expand one caption into a 300-word page with specs and schedule.

    Why it works

    Write one page per job: the problem, the spec (codes, materials, pressures, service), what Jeevy did (tooling, staging, orbital welding, testing), the schedule against plan with Gnosis photo evidence, and the result. Name the customer only with permission; otherwise describe them by type, such as "a launch provider". Finish each page with the quote form.

    Buyers of mission-critical hardware shortlist fabricators who have demonstrably done similar work, and detailed case studies are what engineers forward to procurement.

    Risks and how to handle them

    • Customers decline to be named

      Publish anonymised versions with the technical detail.

    Builds on

    Evidence

    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source
    • Competitor researchHigh Purity Systems case study: 14 process piping skids for a NASA launch-site liquid fueling facility, some 8 ft by 22 ft; mandrel bending cut welds on some skids by about 60%; completion "many weeks earlier" than the next closest bidder; it ends with a request-for-quote link.Source
  • 09

    Data center fluids is one of Jeevy's five services but gets a single line on the Capabilities page. The new controls engineer will lead controls for process skids and fluid systems in markets that explicitly include data centers. Buyers in this market, mechanical contractors and data center builders, search for the specific product, such as cooling distribution manifolds or skid-mounted cooling systems.

    High impactMedium effort First result in 1 quarter CEO

    First action

    List the data center cooling parts Jeevy has built or quoted.

    How to measure it

    Data center cooling RFQs

    Now
    –
    Target
    4
    By
    2 quarters

    Steps

    1. 1

      Define the offer

      Products, sizes, codes and lead times.

      CEO 3 days

    2. 2

      Add controls

      What controls and FAT are included.

      Senior Engineer, Distributed Control Systems 2 days

    3. 3

      Write the page

      Product sections, photos and quote form.

      CEO 1 week

    4. 4

      Publish

      Link from the homepage and Capabilities.

      Web developer 1 day

    5. 5

      Build a target list

      Mechanical contractors on Texas data center projects.

      CEO 1 week

    6. 6

      Reach out

      Short emails linking the page.

      CEO 1 month

    7. 7

      Review

      RFQs, wins and margins by market.

      CEO quarterly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    CEO

    Smallest test

    Publish a one-page version and send it to ten contractors.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Build /capabilities/data-center-cooling covering what Jeevy builds (secondary fluid loop piping, manifolds, skid-mounted modular cooling systems with controls and factory acceptance testing), codes and materials, typical lead times and capacity, how Gnosis gives schedule and photo visibility, and the quote form. Then run direct outreach to mechanical contractors on Texas data center projects, with the page as the landing point.

    A focused page ranks for specific searches and gives outreach a credible link. Cooling skids reuse the piping, skid and controls skills Jeevy already sells to aerospace.

    Risks and how to handle them

    • Capacity pulled from aerospace work

      Route overflow to network shops through the Bid Board.

    Builds on

    Evidence

    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source
    • HiringSenior Engineer, Distributed Control Systems, posted September 1, 2026 (Fort Worth): leads electrical and controls work for process skids, fluid systems, test equipment and ground-support systems (PLC test setups, I/O lists, schematics, panel layouts, FAT and commissioning), works with customers and sets Jeevy's controls standards; markets are aerospace, energy, data centers and critical infrastructure.Source
  • 10

    Jeevy's Y Combinator profile says clients get purchase requests, schedule tracking, document access, photo updates and material traceability, and the About page describes live schedules and photo evidence in Gnosis. Yet the public site presents Gnosis only to shops and staff, and the docs are written for the shop floor. Buyers whose worry is parts that arrive "dirty, out of spec, or late" never see the view built for them.

    High impactMedium effort First result in 1 month CTO

    First action

    Take three screenshots of the buyer view on a finished job and blur customer details.

    How to measure it

    Win rate on quoted jobs

    Now
    –
    Target
    +5 points
    By
    2 quarters

    Steps

    1. 1

      Pick a job

      A finished job with full photo records.

      Project Manager 1 day

    2. 2

      Capture screens

      Schedule, photo evidence, traceability.

      CTO 1 day

    3. 3

      Record a walkthrough

      90 seconds, PO to shipment.

      CTO 2 days

    4. 4

      Write captions

      What the buyer sees and why it matters.

      CEO 1 day

    5. 5

      Publish

      Homepage and Capabilities sections.

      Web developer 2 days

    6. 6

      Use in bids

      Link the walkthrough in every quote email.

      Estimator ongoing

    First result
    1 month
    Cost
    Staff time only
    Owner
    CTO

    Smallest test

    Add the walkthrough link to the next five quotes.

    Why it works

    Add a "For buyers" section to the homepage and Capabilities page with three annotated screenshots (a live job schedule, a photo-verified task, a traceability record), a 90-second screen recording of one job from purchase order to shipment, and a sample of the weekly update a buyer receives. Use a real job with customer details removed.

    It turns Jeevy's software from an internal efficiency into a reason to choose Jeevy over larger or cheaper fabricators: buyers can see that their job is on track without chasing anyone.

    Risks and how to handle them

    • Customer data visible in screenshots

      Use a demo job or redact all names and part numbers.

    Evidence

    • Y CombinatorProfile (Spring 2025 batch, founded 2025): "An AI-powered EPC contractor" matching complex weld jobs to in-network shops; its software turns drawings into a bill of materials and a resource-loaded schedule and cuts shops' bid and scheduling time "by over 80%"; clients get purchase requests, schedule tracking, document access, photo updates and material traceability including domestic content compliance. The profile still shows a team size of 3 and one open role (Backend Data + AI Engineer in Dallas, Cocoa Beach FL or remote).Source
    • Your websiteAbout page: "We're building the AI operating system for post-knowledge fabrication"; a 72-acre Texas facility, 2 fabrication shops in Texas "with expansion planned through a partner network", "$9M" FY26 capacity described as contracted fabrication revenue, and 30 staff (engineers, welders, technicians and project managers); leaders previously worked at SpaceX; Gnosis is "The coordination layer between managers and the shop floor", with live schedules, task assignments, photo evidence and blocker alerts.Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
  • 11

    Jeevy is hiring a Senior Engineer for Distributed Control Systems to lead controls for process skids and fluid systems, run factory acceptance tests and commissioning, and set its controls standards. The Capabilities page mentions "controls-integrated" skids in one phrase but says nothing about panels, platforms, testing or commissioning, so buyers assume they must hire a separate controls integrator.

    High impactMedium effort First result in 1 quarter Senior Engineer

    First action

    Write the FAT checklist the new controls lead will own.

    How to measure it

    Controls package attach rate

    Now
    –
    Target
    40% of skid quotes
    By
    2 quarters

    Steps

    1. 1

      Set standards

      Platforms, panel builds, documentation.

      Senior Engineer, Distributed Control Systems 1 month

    2. 2

      Write the FAT checklist

      Standard steps and sign-off.

      Senior Engineer, Distributed Control Systems 1 week

    3. 3

      Price it

      Adder by I/O count band.

      Estimator 1 week

    4. 4

      Publish

      A controls section on the skid page.

      Web developer 2 days

    5. 5

      Quote both ways

      Every skid quote with and without controls.

      Estimator ongoing

    6. 6

      Review

      Attach rate and margin.

      CEO quarterly

    First result
    1 quarter
    Cost
    Part of the new hire's role
    Owner
    Senior Engineer, Distributed Control Systems

    Smallest test

    Offer FAT and commissioning as a line item on the next three skid quotes.

    Why it works

    Define a single package: mechanical fabrication, control panel, PLC programming, FAT in Cleburne with the buyer present or on video, and field commissioning. Once the new engineer sets the standards, publish the supported platforms, a standard FAT checklist and a pricing structure (a controls adder by I/O count band). Quote every skid with and without the package.

    One accountable contract for the whole skid removes a hand-off between fabricator and integrator, which is where buyers lose schedule, and it raises the value of each job.

    Risks and how to handle them

    • Controls capacity becomes the bottleneck

      Start with standard panels and partner with an integrator for overflow.

    Evidence

    • HiringSenior Engineer, Distributed Control Systems, posted September 1, 2026 (Fort Worth): leads electrical and controls work for process skids, fluid systems, test equipment and ground-support systems (PLC test setups, I/O lists, schematics, panel layouts, FAT and commissioning), works with customers and sets Jeevy's controls standards; markets are aerospace, energy, data centers and critical infrastructure.Source
    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source
  • 12

    Jeevy plans to expand "through a partner network" and promises shops a Bid Board, Gnosis and engineering and quality support. The bidding economics it describes (about 90 hours of bidding per job won) are exactly what a small shop wants to escape. But the network page sells perks generally rather than recruiting the capacity Jeevy actually runs short of.

    High impactMedium effort First result in 1 quarter Network Manager

    First action

    Tag the last 12 months of lost or declined quotes by the reason capacity fell short.

    How to measure it

    Shops with a completed job

    Now
    –
    Target
    8
    By
    2 quarters

    Steps

    1. 1

      Find the gaps

      Processes and codes short of capacity.

      Network Manager 1 week

    2. 2

      Build the list

      Certified shops within trucking range.

      Network Manager 1 week

    3. 3

      Invite with a job

      One live Bid Board job each.

      Network Manager 1 month

    4. 4

      Do the takeoff

      Jeevy prepares BOM and schedule for the bid.

      Estimator ongoing

    5. 5

      Onboard

      Gnosis setup and quality expectations.

      Quality Manager 1 week per shop

    6. 6

      Review

      On-time and quality after three jobs.

      Network Manager quarterly

    First result
    1 quarter
    Cost
    Staff time; estimator hours on takeoffs
    Owner
    Network Manager

    Smallest test

    Invite five shops to bid on one job this month.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    From the last year of quotes, list the processes and codes where Jeevy lacked capacity (for example B31.3 stainless, orbital welding, large structural weldments). Build a target list of shops holding those certifications within a day's trucking of Cleburne, and invite each to bid on one live Bid Board job, with Jeevy doing the takeoff. Onboard winners into Gnosis and track their first three jobs.

    Recruiting against real demand gives shops paid work in their first month, which is the strongest reason to join, and it grows capacity where Jeevy turns away work.

    Risks and how to handle them

    • Quality varies between shops

      First jobs get a Jeevy CWI inspection and photo evidence in Gnosis.

    Builds on

    Evidence

    • Your websiteAbout page: "We're building the AI operating system for post-knowledge fabrication"; a 72-acre Texas facility, 2 fabrication shops in Texas "with expansion planned through a partner network", "$9M" FY26 capacity described as contracted fabrication revenue, and 30 staff (engineers, welders, technicians and project managers); leaders previously worked at SpaceX; Gnosis is "The coordination layer between managers and the shop floor", with live schedules, task assignments, photo evidence and blocker alerts.Source
    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
  • 13

    Gnosis already supports "sending work to other shops" through shop profiles. Every subcontracted job puts another fabricator in front of the software at the moment they are doing paid work in it, which is the best demonstration Jeevy could give.

    Medium impactMedium effort First result in 1 quarter CTO

    First action

    Count how many jobs went to outside shops in the last six months.

    How to measure it

    Guest-to-member conversion

    Now
    –
    Target
    30%
    By
    2 quarters

    Steps

    1. 1

      Size it

      Jobs sent to outside shops per quarter.

      Project Manager 1 day

    2. 2

      Design the guest view

      One job, its tasks, photos and messages.

      CTO 1 week

    3. 3

      Build it

      Invite link from the send-to-shop flow.

      CTO 3 weeks

    4. 4

      Write the invite

      Keep your history; join the network.

      Network Manager 1 day

    5. 5

      Launch

      On the next outside job.

      Project Manager 1 week

    6. 6

      Measure

      Guest shops to accounts and members.

      CTO monthly

    First result
    1 quarter
    Cost
    Engineering time
    Owner
    CTO

    Smallest test

    Give one outside shop a guest login on the next job and ask for feedback.

    Why it works

    When a job goes to a shop that is not yet on Gnosis, give that shop a guest workspace for the job: schedule, tasks, photo uploads and messages. When the job closes, invite them to keep a free shop account and apply to the network, with their job history already in place. Track how many guest shops convert.

    Shops trust software they have already been paid through. The loop recruits network members and Gnosis users as a side effect of normal work.

    Risks and how to handle them

    • Shops see too much of other jobs

      Guest access is limited to the single job.

    Builds on

    Evidence

    • Your websiteDocs (Gnosis): "How the app works, one page per screen", written for shop-floor users: quote-to-project, a Gantt task planner with dependencies and conflicts, materials and BOM-driven work orders, "sending work to other shops" and shop profiles, quoting (bids sent as PDF or email), an AI assistant and an inbox agent, time clocks and a shared kiosk. No pricing and no statement of who can sign up.Source
    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source
  • 14

    Gnosis ships constantly: ten changelog entries in three days in early November 2026, including BOM tree spreadsheet import and parts drafted from prints. But the changelog is a long page inside the docs, so shop managers who would benefit most rarely see what changed.

    Medium impactLow effort First result in 1 month CTO

    First action

    Pick the five most useful changes from October and November.

    How to measure it

    Active shops

    Now
    –
    Target
    +20%
    By
    2 quarters

    Steps

    1. 1

      Pick five

      Most time-saving changes of the month.

      CTO 1 hour

    2. 2

      Capture visuals

      Screenshot or 10-second clip each.

      CTO 2 hours

    3. 3

      Write

      One sentence per change, one tip, one story.

      CTO 2 hours

    4. 4

      Send

      To network shops and Gnosis users.

      Network Manager 1 hour

    5. 5

      Post

      Short LinkedIn version.

      CEO 30 minutes

    6. 6

      Measure

      Opens and feature usage after the send.

      CTO monthly

    First result
    1 month
    Cost
    Half a day a month
    Owner
    CTO

    Smallest test

    Send one note to current users this month.

    Why it works

    Once a month, email network shops and Gnosis users the five changes that save them the most time, each with a screenshot or short clip and one sentence on why it matters, plus one tip and one shop story. Post a short version on LinkedIn. Link each item to its docs page.

    Users who know about new features use them, and visible progress keeps shops engaged with the network between jobs.

    Risks and how to handle them

    • Too much detail for shop managers

      Five items maximum, written in shop-floor language.

    Evidence

    • Your websiteChangelog: frequent releases, for example ten entries dated November 7-9, 2026 (BOM tree spreadsheet export and import, parts drafted from prints named from the sheet title, the assistant running up to 100 steps per message); entries go back at least to September 27, 2026.Source
    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source
  • 15

    Jeevy's Y Combinator profile still shows a team of 3 and one open role in Dallas or Cocoa Beach, while the About page says 30 staff, two Texas shops and $9M of contracted FY26 capacity, and the Ashby board lists three different roles in Fort Worth and San Francisco. Buyers doing diligence, candidates and AI assistants all read these profiles, and they describe a much smaller company.

    Medium impactLow effort First result in 2 weeks CEO

    First action

    Update the YC profile's team size and jobs link today.

    How to measure it

    Listings updated

    Now
    –
    Target
    All top 10 listings
    By
    30 days

    Steps

    1. 1

      Write the fact sheet

      Description, services, codes, size, address.

      CEO 2 hours

    2. 2

      Update YC

      Team size, description, jobs link.

      CEO 30 minutes

    3. 3

      Update LinkedIn

      Company page and founder headlines.

      CEO 1 hour

    4. 4

      Claim Google Business Profile

      Cleburne shop with photos and services.

      CEO 1 hour

    5. 5

      Update directories

      Main industrial supplier directories.

      CEO 1 day

    6. 6

      Review

      Every quarter or after big changes.

      CEO quarterly

    First result
    2 weeks
    Cost
    $0
    Owner
    CEO

    Smallest test

    Fix the YC profile this week.

    Why it works

    Update the YC profile (team size, one-line description naming skids, B31.3 piping and launch infrastructure, a jobs link to Ashby), LinkedIn, a Google Business Profile for the Cleburne shop, and the main industrial supplier directories, all with the same description, services, codes and address. Keep a one-page fact sheet so every listing stays consistent.

    Consistent, current facts across profiles build trust with procurement teams and help search engines and AI assistants describe Jeevy accurately.

    Risks and how to handle them

    • Third-party sites keep old data

      Request corrections and link to the fact sheet.

    Evidence

    • Y CombinatorProfile (Spring 2025 batch, founded 2025): "An AI-powered EPC contractor" matching complex weld jobs to in-network shops; its software turns drawings into a bill of materials and a resource-loaded schedule and cuts shops' bid and scheduling time "by over 80%"; clients get purchase requests, schedule tracking, document access, photo updates and material traceability including domestic content compliance. The profile still shows a team size of 3 and one open role (Backend Data + AI Engineer in Dallas, Cocoa Beach FL or remote).Source
    • Your websiteAbout page: "We're building the AI operating system for post-knowledge fabrication"; a 72-acre Texas facility, 2 fabrication shops in Texas "with expansion planned through a partner network", "$9M" FY26 capacity described as contracted fabrication revenue, and 30 staff (engineers, welders, technicians and project managers); leaders previously worked at SpaceX; Gnosis is "The coordination layer between managers and the shop floor", with live schedules, task assignments, photo evidence and blocker alerts.Source
    • HiringAgent Engineer (Senior), posted September 24, 2026 (San Francisco or Fort Worth): builds agents across "quoting, project management, scheduling, procurement, quality, and production", such as an estimator that produces first-pass quotes, a project agent that turns purchase orders into work orders and schedules, and a production agent that flags likely schedule misses; agents may not act "unless their conclusions can be traced back to source documents"; customers are aerospace, energy and infrastructure companies.Source
  • 16

    Jeevy tells investors that clients get material traceability including domestic content compliance, and its founding story is about parts that arrive "out of spec". Quality and procurement teams in aerospace and energy ask for the documentation package before they award work, but the website shows no example of it.

    High impactMedium effort First result in 1 month Quality Manager

    First action

    Choose a finished B31.3 job and collect its documentation.

    How to measure it

    Quote-to-award rate

    Now
    –
    Target
    +5 points
    By
    2 quarters

    Steps

    1. 1

      Pick a job

      A finished, well-documented piping job.

      Quality Manager 1 day

    2. 2

      Assemble the pack

      Weld map, procedures, MTRs, tests, photos.

      Quality Manager 1 week

    3. 3

      Redact

      Remove customer names and part numbers.

      Quality Manager 1 day

    4. 4

      Design

      Cover page and index.

      CEO 1 day

    5. 5

      Publish

      Download on Capabilities and in quote emails.

      Web developer 1 day

    6. 6

      Automate

      Generate packs from Gnosis job records.

      CTO 1 quarter

    First result
    1 month
    Cost
    Staff time only
    Owner
    Quality Manager

    Smallest test

    Attach the sample pack to the next three quotes.

    Why it works

    Build a redacted sample pack from a real job: weld map, list of welding procedures and welder qualifications, material test reports tied to heat numbers, NDE and pressure test reports, the Gnosis photo log, and a domestic content statement. Publish it as a downloadable PDF on the Capabilities page and attach it to every quote.

    It answers the quality manager's questions before they are asked and shows the paperwork discipline that separates Jeevy from cheaper shops.

    Risks and how to handle them

    • Revealing customer or proprietary data

      Have the customer approve the redacted version, or build it from an internal job.

    Evidence

    • Y CombinatorProfile (Spring 2025 batch, founded 2025): "An AI-powered EPC contractor" matching complex weld jobs to in-network shops; its software turns drawings into a bill of materials and a resource-loaded schedule and cuts shops' bid and scheduling time "by over 80%"; clients get purchase requests, schedule tracking, document access, photo updates and material traceability including domestic content compliance. The profile still shows a team size of 3 and one open role (Backend Data + AI Engineer in Dallas, Cocoa Beach FL or remote).Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source

Big bets 3

Larger plays that can change the trajectory.

  • 17

    Launch infrastructure, including field installation and proof testing, is one of Jeevy's five services, and the company plans to expand "through a partner network". Its Y Combinator jobs listing already names Cocoa Beach, Florida as a location. Launch-site work needs crews and a shop near the pad, not a two-day truck ride away in Texas.

    High impactHigh effort First result in 2 quarters CEO

    First action

    List Space Coast shops with B31.3 and field-install experience and call three.

    How to measure it

    Field install jobs via the partner

    Now
    –
    Target
    2
    By
    3 quarters

    Steps

    1. 1

      Shortlist partners

      Space Coast shops with B31.3 and field crews.

      CEO 2 weeks

    2. 2

      Audit quality

      Procedures, welder qualifications, safety record.

      Quality Manager 2 weeks

    3. 3

      Agree terms

      Rates, liability, Gnosis use.

      CEO 1 month

    4. 4

      Onboard to Gnosis

      Shop profile, crews, equipment.

      Network Manager 2 weeks

    5. 5

      Pilot one job

      Built in Texas, installed in Florida.

      Project Manager 1 quarter

    6. 6

      Publish the offer

      Launch infrastructure page with the pilot as proof.

      CEO 2 weeks

    7. 7

      Decide

      Expand, change partner or stop.

      CEO after the pilot

    First result
    2 quarters
    Cost
    Travel, audit and pilot margin
    Owner
    CEO

    Smallest test

    Quote one current launch customer a field-install option with a named partner.

    Why it works

    Sign one established fabrication shop on Florida's Space Coast as Jeevy's first out-of-state network partner. Put it on Gnosis, give it Jeevy's quality support and bid it as "Texas fabrication, Florida installation": skids and spools built in Cleburne, then installed, tie-in welded and proof tested by the Florida partner under Jeevy's project management. Prove it on one job before marketing it.

    Launch customers want one contractor from shop to pad. A local partner adds field capacity without Jeevy building a second campus, and it tests whether the network model works beyond Texas.

    Risks and how to handle them

    • Partner quality or safety issues at the pad

      Jeevy CWI on site for the pilot, with photo evidence for every task.

    • Not enough launch-site demand

      Pilot only against a signed job.

    Builds on

    Evidence

    • Your websiteCapabilities page (read twice on November 10, 2026): five services (skid fabrication; structural to AWS D1.1/D1.2; process piping to ASME B31.3 including orbital welding and cryogenic service; launch infrastructure with field installation and proof testing; data center fluids: cooling distribution piping, manifolds and skid-mounted modular systems) and three "recent work" photos (an aerospace ground support steel assembly, large-bore stainless spools, a high-pressure manifold) with no customer, size or schedule detail. The only calls to action are "Join the Network" and "Log in"; there is no request-a-quote, RFQ or drawing upload, only a phone number and a general email address, and /contact and /quote return 404.Source
    • Your websiteAbout page: "We're building the AI operating system for post-knowledge fabrication"; a 72-acre Texas facility, 2 fabrication shops in Texas "with expansion planned through a partner network", "$9M" FY26 capacity described as contracted fabrication revenue, and 30 staff (engineers, welders, technicians and project managers); leaders previously worked at SpaceX; Gnosis is "The coordination layer between managers and the shop floor", with live schedules, task assignments, photo evidence and blocker alerts.Source
    • Y CombinatorProfile (Spring 2025 batch, founded 2025): "An AI-powered EPC contractor" matching complex weld jobs to in-network shops; its software turns drawings into a bill of materials and a resource-loaded schedule and cuts shops' bid and scheduling time "by over 80%"; clients get purchase requests, schedule tracking, document access, photo updates and material traceability including domestic content compliance. The profile still shows a team size of 3 and one open role (Backend Data + AI Engineer in Dallas, Cocoa Beach FL or remote).Source
  • 18

    Since its 2025 launch Jeevy has said its software cuts shops' bid and scheduling time "by over 80%", against a baseline of about 9 hours per drawing. It is now hiring to build the estimator and project agents, and it offers the "AI Gnosis ERP System" as a network perk, but nothing public shows a measured result and the docs list no pricing.

    High impactHigh effort First result in 2 quarters Agent Engineer

    First action

    Add timestamps for drawing upload and bid sent to every quote in Gnosis.

    How to measure it

    Hours per drawing

    Now
    –
    Target
    Under 2 hours
    By
    2 quarters

    Steps

    1. 1

      Instrument

      Timestamps for upload, draft and send.

      Agent Engineer (Senior) 1 week

    2. 2

      Set the baseline

      Manual bids for one month.

      Estimator 1 month

    3. 3

      Run the estimator

      Agent drafts; people correct.

      Agent Engineer (Senior) 1 quarter

    4. 4

      Measure accuracy

      BOM lines accepted without edits.

      Software Engineer - Knowledge monthly

    5. 5

      Publish

      Results and method on the network page.

      CEO 2 weeks

    6. 6

      Price Gnosis

      Plan for outside shops based on hours saved.

      CEO 1 month

    First result
    2 quarters
    Cost
    Engineering time already planned for the estimator
    Owner
    Agent Engineer (Senior)

    Smallest test

    Time ten drawings by hand and ten with the estimator.

    Why it works

    Instrument Gnosis to record time from drawing upload to a sent bid, with and without the estimator, across Jeevy's shops and network shops. After one quarter, publish the measured numbers with the method: median hours per drawing, the share of BOM lines accepted without edits, and schedule accuracy. Use the result to set a price for Gnosis for shops outside the network.

    A measured, repeatable number is far more persuasive to shop owners than a launch claim, and it turns Gnosis from a perk into a product with its own revenue.

    Risks and how to handle them

    • Measured savings fall short of 80%

      Publish the real number; any large, honest saving still sells.

    Builds on

    Evidence

    • Y CombinatorProfile (Spring 2025 batch, founded 2025): "An AI-powered EPC contractor" matching complex weld jobs to in-network shops; its software turns drawings into a bill of materials and a resource-loaded schedule and cuts shops' bid and scheduling time "by over 80%"; clients get purchase requests, schedule tracking, document access, photo updates and material traceability including domestic content compliance. The profile still shows a team size of 3 and one open role (Backend Data + AI Engineer in Dallas, Cocoa Beach FL or remote).Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
    • HiringAgent Engineer (Senior), posted September 24, 2026 (San Francisco or Fort Worth): builds agents across "quoting, project management, scheduling, procurement, quality, and production", such as an estimator that produces first-pass quotes, a project agent that turns purchase orders into work orders and schedules, and a production agent that flags likely schedule misses; agents may not act "unless their conclusions can be traced back to source documents"; customers are aerospace, energy and infrastructure companies.Source
    • Your websiteDocs (Gnosis): "How the app works, one page per screen", written for shop-floor users: quote-to-project, a Gantt task planner with dependencies and conflicts, materials and BOM-driven work orders, "sending work to other shops" and shop profiles, quoting (bids sent as PDF or email), an AI assistant and an inbox agent, time clocks and a shared kiosk. No pricing and no statement of who can sign up.Source
  • 19

    Jeevy's Research page promises work on "fabrication networks, capacity planning, and the economics of distributed manufacturing". Through the Bid Board and Gnosis it sees real lead times, open capacity and material costs across several shops, data that buyers in aerospace, energy and data centers cannot get anywhere else.

    Medium impactHigh effort First result in 2 quarters CEO

    First action

    Check which lead-time and capacity fields Gnosis already records.

    How to measure it

    Buyer subscribers

    Now
    –
    Target
    150
    By
    3 quarters

    Steps

    1. 1

      Audit the data

      Lead times, backlog, capacity, PO prices.

      Software Engineer - Knowledge 2 weeks

    2. 2

      Set privacy rules

      Minimum shop counts per figure.

      CTO 1 week

    3. 3

      Build the queries

      Quarterly aggregates.

      Software Engineer - Knowledge 2 weeks

    4. 4

      Write the report

      Four charts and a short commentary.

      CEO 1 week

    5. 5

      Publish

      Page, PDF and email sign-up.

      Web developer 2 days

    6. 6

      Promote

      LinkedIn and buyer emails.

      CEO quarterly

    First result
    2 quarters
    Cost
    Engineering and writing time
    Owner
    CEO

    Smallest test

    Publish one chart of Jeevy's own lead times by process.

    Why it works

    Publish a short quarterly report: lead times by process (B31.3 stainless, structural, skids), weeks of backlog, open welding capacity, and material cost trends from purchase orders, all anonymised and aggregated across shops. Release it as a page and PDF, offer quarterly email delivery, and brief buyers on it.

    Planning data is valuable to buyers and gives them a recurring reason to visit Jeevy, and it shows the network is real and growing.

    Risks and how to handle them

    • Too few shops for robust figures

      Start with Jeevy's own shops and add network data as it grows.

    Builds on

    Evidence

    • Your websiteResearch page (/research/white-papers): "We publish our thinking openly. Each paper reflects a real problem we're solving", covering "fabrication networks, capacity planning, and the economics of distributed manufacturing", but no papers are listed; /research returns 404 although "Research" is in the main navigation.Source
    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source
    • Your websiteDocs (Gnosis): "How the app works, one page per screen", written for shop-floor users: quote-to-project, a Gantt task planner with dependencies and conflicts, materials and BOM-driven work orders, "sending work to other shops" and shop profiles, quoting (bids sent as PDF or email), an AI assistant and an inbox agent, time clocks and a shared kiosk. No pricing and no statement of who can sign up.Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 20

    The Gnosis app already lets users switch between English and Spanish; the support FAQ explains how. But the website, including the Network and Careers pages, is English only, with no language switch, so shop owners and floor leads who prefer Spanish never learn that the tool works for them.

    Medium impactLow effort First result in 1 month Network Manager

    First action

    Translate the Network page and have a native speaker on the floor review it.

    How to measure it

    Spanish-page applications

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      Pick pages

      Network, careers summary, quickstart.

      Network Manager 1 day

    2. 2

      Translate

      Professional translation, shop-floor terms.

      Network Manager 1 week

    3. 3

      Review

      A Spanish-speaking floor lead checks wording.

      Operations Manager 2 days

    4. 4

      Publish

      /es pages with hreflang and a header link.

      Web developer 2 days

    5. 5

      Promote

      Spanish recruiting posts and invitations.

      Network Manager 1 month

    6. 6

      Measure

      Applications by language.

      Network Manager monthly

    First result
    1 month
    Cost
    Translation of three pages
    Owner
    Network Manager

    Smallest test

    Post one Spanish recruiting message linking a translated network page.

    Why it works

    Publish Spanish versions of the Network page, a careers summary and the Gnosis quickstart, with a language link in the header. Say in recruiting posts and Bid Board invitations that the app runs in Spanish on the shop floor, and have a Spanish speaker on the team handle replies.

    Recruiting in the language people work in removes friction, and Jeevy has already built the product side of it.

    Risks and how to handle them

    • Replies arrive with no Spanish speaker to answer

      Name a bilingual owner before launch.

    Builds on

    Evidence

    • Your websiteSupport page: a contact form that opens the visitor's own email client, a support@ inbox and replies within "up to one business day"; FAQs on clocking in, PIN resets, task photos and switching the app language between English and Spanish.Source
    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source
    • HiringCareers page: hiring "across operations, engineering, finance, and software" with "shop-floor impact", but no individual roles are listed there (candidates are pointed to careers@); the Ashby board shows three roles, all in software and controls engineering, none for welders, fitters or project managers.Source
  • 21

    Jeevy's Agent Engineer post sets a firm rule: agents may not act "unless their conclusions can be traced back to source documents", and the knowledge engineer is building a graph linking drawings, specifications, processes and project data. Buyers of mission-critical hardware are wary of AI-generated quotes and schedules, and that rule is the answer, but today it lives only in a job post.

    Medium impactLow effort First result in 1 month Software Engineer Knowledge

    First action

    Write the four rules the agents already follow in plain language.

    How to measure it

    First-time buyer win rate

    Now
    –
    Target
    +5 points
    By
    2 quarters

    Steps

    1. 1

      Write the rules

      Traceability, human approval, flags, data handling.

      Software Engineer - Knowledge 1 day

    2. 2

      Build an example

      One redacted quote line with its source.

      Agent Engineer (Senior) 2 days

    3. 3

      Review

      Accuracy and anything sensitive.

      CTO 1 day

    4. 4

      Publish

      Linked from the quote form and Capabilities.

      Web developer 1 day

    5. 5

      Use in bids

      Link it in every first-time buyer quote.

      Estimator ongoing

    6. 6

      Update

      When agent behaviour changes.

      Software Engineer - Knowledge quarterly

    First result
    1 month
    Cost
    Staff time only
    Owner
    Software Engineer Knowledge

    Smallest test

    Add a two-paragraph explanation to the quote confirmation email.

    Why it works

    Publish a short page explaining how Jeevy's AI works on a buyer's job: every quote line links back to a drawing sheet or spec clause, a named estimator approves every bid, schedule risks are flagged early and reviewed by a project manager, and controlled drawings are handled under stated access rules. Show one redacted example of a quote line with its source reference.

    It turns a likely objection ("is a machine pricing my job?") into a reason to trust Jeevy: more traceable than a hand-built estimate.

    Risks and how to handle them

    • Over-promising on AI accuracy

      Describe the checks, not accuracy figures, until they are measured (see idea 18).

    Builds on

    Evidence

    • HiringAgent Engineer (Senior), posted September 24, 2026 (San Francisco or Fort Worth): builds agents across "quoting, project management, scheduling, procurement, quality, and production", such as an estimator that produces first-pass quotes, a project agent that turns purchase orders into work orders and schedules, and a production agent that flags likely schedule misses; agents may not act "unless their conclusions can be traced back to source documents"; customers are aerospace, energy and infrastructure companies.Source
    • HiringSoftware Engineer - Knowledge, posted June 30, 2026 (Fort Worth): builds the knowledge graph linking "engineering drawings, specifications, manufacturing processes, and project data", with ingestion and retrieval pipelines, for "the operating system for fabrication."Source
    • Y CombinatorLaunch post: outsourced precision parts "often arrive dirty, out of spec, or late"; processing one drawing properly takes about 9 hours, so at a 10% win rate a small shop spends about 90 hours to win one job; Jeevy bids, buys materials, assigns jobs to network shops with open capacity and owns each job end to end.Source
  • 22

    The Careers page says Jeevy is hiring "across operations, engineering, finance, and software" with "shop-floor impact", but it lists no roles, and the Ashby board shows only three software and controls engineering roles. With $9M of contracted FY26 capacity and 30 staff, the limit on growth is skilled hands: certified welders, pipe fitters, inspectors and project managers, none of whom can find an opening to apply for.

    High impactLow effort First result in 1 month Operations Manager

    First action

    Write the welder and pipe fitter postings and publish them on Ashby this week.

    How to measure it

    Qualified applicants per opening

    Now
    –
    Target
    5
    By
    60 days

    Steps

    1. 1

      List openings

      Roles, counts and start dates by shop.

      Operations Manager 1 day

    2. 2

      Write postings

      Pay range, shift, certifications, photos.

      Operations Manager 2 days

    3. 3

      Publish

      Ashby, with the board embedded on Careers.

      Web developer 1 day

    4. 4

      Reach schools

      Local welding programmes and job fairs.

      Operations Manager 1 month

    5. 5

      Use the network

      Share via the staffing perk.

      Network Manager ongoing

    6. 6

      Track

      Applicants, weld tests passed, hires.

      Operations Manager monthly

    First result
    1 month
    Cost
    Staff time; optional job board spend
    Owner
    Operations Manager

    Smallest test

    Publish one welder posting with a pay range and count applicants in two weeks.

    Why it works

    Post the shop-floor and operations roles on Ashby with pay ranges, shifts, required certifications (for example 6G pipe, orbital welding, CWI) and photos of the Cleburne shop. List all open roles directly on the Careers page, share them with local welding schools and through the network's staffing perk, and mention Gnosis as the tool crews use every day.

    For a fabricator with contracted backlog, every qualified welder hired is revenue delivered on time. Clear postings with pay and certifications attract experienced tradespeople who skip vague "we're hiring" pages.

    Risks and how to handle them

    • Applicants without the right certifications

      Require a weld test before interview.

    Evidence

    • HiringCareers page: hiring "across operations, engineering, finance, and software" with "shop-floor impact", but no individual roles are listed there (candidates are pointed to careers@); the Ashby board shows three roles, all in software and controls engineering, none for welders, fitters or project managers.Source
    • Your websiteAbout page: "We're building the AI operating system for post-knowledge fabrication"; a 72-acre Texas facility, 2 fabrication shops in Texas "with expansion planned through a partner network", "$9M" FY26 capacity described as contracted fabrication revenue, and 30 staff (engineers, welders, technicians and project managers); leaders previously worked at SpaceX; Gnosis is "The coordination layer between managers and the shop floor", with live schedules, task assignments, photo evidence and blocker alerts.Source
    • Your websiteNetwork page: "The best work together"; seven member perks (the Jeevy Bid Board with "jobs tailored for your shop", the "AI Gnosis ERP System", project management, engineering support for takeoffs and manufacturability, staffing for surge needs, quality support from CWIs and metallurgists, and R&D technology) and an "Apply" link to /network/apply. The page gives no eligibility criteria, member count or description of what happens after applying, and the apply page, as read, shows no form fields or requirements.Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

Have it built

ProgrammableAgency

2 of the 22 ideas are things Programmable builds and runs for its customers: pages, outreach, prospect lists, booking flows and monitors. Pick one, or send the whole list.

Prospect lists2The list compiled from public sources, verified, deduplicated and delivered to your CRM.

A 30-minute session with the engineer who would build it, not a sales call. You leave with a plan whether or not you hire us.

Book a working session

Usually live within days.

More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • CONUS growth strategyA platform and app that structures medical device information for surgical teams: implant variants and surgical technique documents from…24 growth ideas
  • Harvey growth strategyAn AI platform for legal and professional services: agents, Vault, Knowledge research, Spaces, Contract Intelligence, Command Center and…22 growth ideas
  • Lorikeet growth strategyAn AI customer concierge that resolves complex support end to end across chat, email, SMS, WhatsApp and voice, working inside existing…22 growth ideas
  • The Advocates (PNW) growth strategyA personal injury law firm led in the Pacific Northwest by Ken and Doni, handling car, truck, motorcycle, bicycle, pedestrian, dog bite…21 growth ideas
  • Pure Rose growth strategyIngestible and skincare products made from organic Bulgarian roses grown on the company's own farms: Rose Nectar drink drops, Rose Yummies…23 growth ideas
  • 829 Studios growth strategyA Boston-based, technology-enabled integrated digital marketing agency: paid search and social, programmatic, retail media, SEO and AI…22 growth ideas
  • Hospitable growth strategySoftware that runs short-term rentals across Airbnb, Vrbo, Booking.com and Agoda: unified inbox, automated and AI guest messaging, dynamic…21 growth ideas
  • Free Coffee growth strategyA small custom software agency from New Orleans that builds business apps, internal tools, automations, dashboards and AI features that…22 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on November 10, 2026, and cites them throughout. Jeevy Fabrication did not commission, review or endorse it, and Programmable is not affiliated with Jeevy Fabrication. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Jeevy Fabrication runs its business.

Something wrong, or do you represent Jeevy Fabrication? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    Open the buyer front door: quote request with drawing upload, a crawlable homepage, sitemap and robots, the first white paper, a clear network application, share images and a lighter homepage.

  2. Days 31 to 6011 ideas

    Proof and focus: case studies, a data center cooling page, the buyer's view of Gnosis, the controls-integrated skid package, network recruitment, the subcontracting loop, the monthly release note, consistent profiles, a sample traceability pack, Spanish recruiting and shop-floor hiring.

  3. Days 61 to 904 ideas

    Commit to the big bets: a Florida launch-site partner, measured bid-time savings, the capacity report, and a public explanation of how AI quotes are checked.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value one accountable partner that owns the job from bid to delivery. The most cited problem: outsourced parts that arrive dirty, out of spec or late.

  • Live schedules and photo evidence from the shop floor
  • Slow, costly bidding: about 9 hours to process one drawing
  • In their words: “skids”

Market

Competitive landscape

3 competitors compared: Xometry, Hadrian and High Purity Systems.

  • Gap to exploit: Fast first-pass quotes for complex welded assemblies from drawings
  • Xometry: Homepage centres on machining, printing and sheet and tube work, not code-stamped welded skids and piping
  • Hadrian: Focused on precision components, not welded fluid systems and field installation

Hiring signals

Jeevy's three open roles are all about turning its software into the way work gets won and run.

  • Agent Engineer (Senior): Estimator, project and production agents traced to source documents. Ideas 1, 18, 21.
  • Senior Engineer, Distributed Control Systems: Controls, FAT and commissioning for skids; data centers named. Ideas 9, 11.
  • Software Engineer - Knowledge: Knowledge graph of drawings, specs and project data. Ideas 19, 21.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks firstNew accounts get 100,000 free enrichment credits with code BETA100K (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammableMediaAn AI note taker, interpreter and webinar host for your calls (opens programmable.media in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence