Upstream Optimization sells "Optimization as a Service" on outcomes: no upfront CAPEX, goals "like boosting production by 10%", reservoir models "built in weeks". But none of the 109 English pages shows a single field result, for this or any other business; the page ends with "Explore More" and a personal email. Rosenxt is hiring a Customer Project Manager precisely to turn signed contracts into "referenceable field deployments" and to report KPIs that "support performance-based contract terms". An operator asked to share revenue on production gains will want to see one before signing.
First action
Ask the delivery team which deployment has the cleanest before-and-after data.
How to measure it
Operator meetings that reach a pilot proposal
- Now
- –
- Target
- +30%
- By
- 2 quarters
Steps
Pick the deployment
Cleanest baseline and measured change.
Customer Project Manager, Upstream Optimization 1 week
Get operator consent
Anonymised publication terms.
Head of Upstream Optimization 2 weeks
Write the result
Wells, timeline, levers, measured change.
Reservoir & Production Engineer - Data Analytics 1 week
Explain the pricing model
Baseline, measurement, contract length.
Head of Upstream Optimization 1 week
Design the one-pager
Web page and PDF.
Head of Marketing & Communications 1 week
Publish
Upstream page and flow sensor page.
Head of Marketing & Communications 1 day
Use in follow-ups
ADIPEC and ATCE contacts, proposals.
CEO Realization ongoing
Add more
One new result per quarter.
Customer Project Manager, Upstream Optimization quarterly
Why it works
Pick the most advanced deployment and publish an anonymised one-page result: field type and region, number of wells with clamp-on sensors, time from installation to first model, the levers applied (choke, artificial lift, reopened wells) and the measured change in production or deferred production avoided, against the agreed baseline. Add a short "How outcome-based pricing works" section: baseline method, how gains are measured, contract length. Put both on the Upstream page, in the ADIPEC and ATCE follow-ups, and in every proposal.
Outcome-based contracts move risk from the operator to Rosenxt, which is attractive only if the measurement is credible. A real result, even anonymised, answers the first question every reservoir engineer and procurement team will ask and gives sales something to send after each conference conversation.
Ready to use
CopyField result one-pager
Field: <onshore/offshore>, <region>, <mature/brownfield> Scope: <n> wells with clamp-on multiphase sensors, installed in <days>, no intervention Baseline: <method>, agreed with operator on <date> Model: AI top-down reservoir model ready in <weeks> Levers applied: <choke / artificial lift / injection / reopened wells> Result after <months>: <+x% oil rate or +x bbl/d>, <deferred production avoided> Commercial model: outcome-based, no upfront CAPEX, <share of measured gain> Verified by: <operator team / third party> Next step: request a pilot assessment
Risks and how to handle them
Operator will not allow publication
Publish ranges and field type only, or a pilot result from the test facility.
Results questioned
Show the baseline method and who verified it.
Evidence
- Your websiteUpstream Optimization page: "Optimization as a Service ... an outcome-based service model. Rosenxt aligns directly with your production performance - delivering measurable results without upfront CAPEX"; levers include artificial lift, choke settings, injection, infill well planning and "Reopening of inactive wells"; projects start by defining "measurable goals - like boosting production by 10% or cutting costs by 15%"; "reservoir models built in weeks". The page ends with "Explore More" and a named contact.Source
- Your websiteSite crawl of the 109 English pages outside the news archive (October 20, 2026): no page publishes a customer case study or a field result for any business. The only mention of "case studies" is in an event description. The clamp-on EMAT flow sensor page describes a test facility running "Since 2014" and "over 40 years of expertise in oil and gas inspection" but shows no field numbers.Source
- HiringCustomer Project Manager, Upstream Optimization (posted August 13, 2026): owns delivery of "Optimization as a Service" (OaaS) projects for oil and gas operators, "translating signed contracts into successful, referenceable field deployments", and will "Track and report on technical and commercial KPIs to demonstrate value delivered and support performance-based contract terms" and identify "upsell, and expansion opportunities".Source
- HiringProduct Owner, AI-Driven Reservoir Simulation & Optimization (posted September 24, 2026, Germany, UK or the Netherlands): leads "our AI-driven reservoir simulator" combining machine learning with real-time and historical production data, with KPIs for "incremental production, reduced simulation runtime, improved forecast accuracy". A Reservoir & Production Engineer - Data Analytics (posted October 15, 2026) will "Collaborate closely with customers ... and deliver actionable insights".Source
- Your websiteNews: "Rosenxt at GOTECH 2026 in Dubai" (October 2, 2026) - as sponsor and exhibitor, Rosenxt presented "how combining continuously acquired well data with AI-based modelling supports reservoir and production optimization", with a focus on mature fields and "the requirements of operators in the Middle East"; the host operator's CEO visited the stand.Source