ProgrammableMarketing/spm.us (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 7
  • This quarter · 11
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Nov 10, 2026
  1. Programmable
  2. Playbooks
  3. Super Powers Mobility (SPM)
Super Powers Mobility (SPM) logo

growth playbook · Nov 10, 2026

spm.us (opens in a new tab)

Super Powers Mobility (SPM) growth playbook

Diagnosis

SPM is a four-person Y Combinator (Fall 2026) battery company with real hardware, over $400,000 in contracted revenue, demonstrations to special operations forces, and two open engineering roles to scale pack production.

Its new government site, spm.us, explains the products well (the PEK page has full specs, a runtime calculator and a brochure) but leaves out what government buyers need to act: How to Buy lists OTA, SBIR and direct-purchase paths yet gives no UEI, CAGE, NAICS codes or capability statement, the EVK has no datasheet, there is no compliance list, no proof page, and public EVK prices differ by site.

This playbook first makes SPM easy to buy from and easy to forward inside a program office, then opens the markets its hiring already points to (unmanned systems, MRZR fleet upgrades against Polaris's 5 kW option, commercial silent power), and finally sets up the big bets: base-scale storage, OEM powertrain supply and power rental.

Growth Score

6/10

Biggest Opportunity

Polaris has just been funded to field a 5 kW export-power MRZR; SPM already demonstrates 12-15 kW of silent power on MRZR-class vehicles. Making SPM procurement-ready and easy to forward lets that demo record turn into orders.

Biggest Risk

A four-person team spread across defense, commercial and consumer lines, against established military battery makers (Bren-Tronics, Epsilor) and Polaris itself, with long government buying cycles that can outlast early runway.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Put a procurement block on How to Buy: UEI, CAGE code, NAICS codes and a one-page capability statement

    Confirm the SAM.gov registration and CAGE code, then add them to /how-to-buy.

    High impact First result in 2-4 weeks
  2. 2

    Give the EVK a downloadable datasheet like the PEK brochure

    Copy the PEK brochure layout and fill in EVK figures already on the site.

    High impact First result in 2 weeks
  3. 3

    Turn the PEK runtime calculator result into a printable power budget a program office can attach to a funding request

    Mock up the one-page PDF from the calculator's current example (1.09 kW, about 11 hours).

    High impact First result in 1 month

02

Your idea portfolio

24 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 8 ideas are marked Unexpected: plays you are unlikely to have tried.

    2 of these are things Programmable can build and run for you.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 2Big bets · 10Fill-ins · 9Reconsider · 3
Effort →

Showing 24 of 24 ideas

This week 7

Quick wins with a clear first action.

  • 01

    SPM's How to Buy page tells government buyers they can purchase by direct award, OTA, SBIR/STTR, through a prime or as a commercial item, but it gives none of the identifiers a contracting officer or a prime's supplier team needs to start: no UEI, no CAGE code, no NAICS codes, no capability statement and no contract vehicles. After a field demo, the person who wants a PEK has to email [email protected] and wait just to learn whether SPM can be paid.

    High impactLow effort First result in 2-4 weeks Founder & CEO

    First action

    Confirm the SAM.gov registration and CAGE code, then add them to /how-to-buy.

    How to measure it

    Government and prime inquiry-to-quote rate

    Now
    –
    Target
    +30%
    By
    90 days

    Steps

    1. 1

      Confirm registration

      Check the SAM.gov entity record, UEI and CAGE; renew or complete it if needed.

      Founder & CEO 1 day (registration can take a few weeks)

    2. 2

      Choose NAICS codes

      Primary and secondary codes for battery and vehicle manufacturing and R&D.

      Founder & CEO 2 hours

    3. 3

      Write the capability statement

      One page: core products, key specs, demonstrations, differentiators, identifiers, contact.

      Business Development Lead 2 days

    4. 4

      Add the block

      Top of /how-to-buy and a footer link on every page.

      Founder & CEO 2 hours

    5. 5

      List payment paths

      Purchase order, purchase card where allowed, through a prime, commercial terms.

      Business Development Lead 1 hour

    6. 6

      Use it in follow-up

      Attach the capability statement to every post-demo email.

      Business Development Lead ongoing

    7. 7

      Track

      Downloads and quote requests from government and prime inquiries.

      Founder & CEO monthly

    First result
    2-4 weeks
    Cost
    $0 (SAM.gov registration is free)
    Owner
    Founder & CEO

    Smallest test

    Email the capability statement to the last five government inquiries and count replies.

    Why it works

    Add a short "For contracting officers and primes" block at the top of /how-to-buy and in the site footer: legal name, UEI and CAGE code (or a clear note on registration status), primary NAICS codes for battery and vehicle manufacturing and engineering services, small-business status, Pittsburgh address, accepted payment paths (including government purchase cards where allowed), and a downloadable one-page capability statement covering the PEK, EVK, custom development, demonstrations and contact details. If the SAM.gov registration is not yet active, complete it first; it is free and it is the gate for most of the buying paths the page lists.

    Government buyers and prime supply-chain teams check a new vendor's identifiers before anything else. Putting them on the page removes an email round trip at the moment of highest interest, lets a champion forward one link and one PDF inside their unit, and makes SPM findable in vendor searches. It also backs up the page's own claim that the products are "sold to the public today".

    Ready to use

    ChecklistProcurement block for /how-to-buy

    [ ] Legal name: Super Powers Mobility Inc.
    [ ] UEI and CAGE code (or registration status)
    [ ] Primary and secondary NAICS codes
    [ ] Small-business status
    [ ] Address: Pittsburgh, PA
    [ ] Payment paths: PO, purchase card where allowed, via prime, commercial terms
    [ ] Capability statement PDF (dated)
    [ ] Contact for contracting questions
    [ ] Note on controlled information (keep the existing ITAR/EAR warning)

    Risks and how to handle them

    • Registration is still pending

      Say so on the page and offer purchase through a prime meanwhile.

    • Capability statement drifts out of date

      Date it and review it every quarter.

    Evidence

    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source
    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source
    • Your websiteElectric Vehicle Kit page: bolt-on electric or series-hybrid drivetrain for any UTV, including MRZR-class vehicles; up to 15 kW of power export; 165 hp peak and 162 lb-ft; thermal signature "around one-fifth" of combustion; five battery/range-extender configurations from Lightest to All-electric; silent power export demonstrated to special operations forces on MRZR-class vehicles and shown at TEVCON; a YouTube video of the kit in a Polaris RZR XP1000. No datasheet, price, lead time or standards are listed, unlike the PEK page, which has a brochure.Source
    • Y CombinatorCompany profile: Fall 2026 batch, founded 2023, team of 4, Pittsburgh; started by building 470V off-road EVs, then shifted to battery packs and power export systems for military and consumer use; reports over $400,000 in contracted revenue since it started direct sales; listed news includes "Pittsburgh startup pitches EV kit to elite troops" (July 18, 2026).Source
  • 02

    The PEK page offers a brochure PDF with every interface and rating. The EVK page, SPM's flagship drivetrain, has only web copy and a video: no datasheet, no standards, no lead time. Program offices and fleet managers circulate PDFs, not URLs.

    High impactLow effort First result in 2 weeks Battery Pack Design Engineer

    First action

    Copy the PEK brochure layout and fill in EVK figures already on the site.

    How to measure it

    EVK quote requests

    Now
    –
    Target
    +25%
    By
    60 days

    Steps

    1. 1

      Collect figures

      Specs from the EVK page, the custom page and the partner listing.

      Battery Pack Design Engineer 1 day

    2. 2

      Fill gaps

      Weights, voltages, install time, platforms.

      Battery Pack Design Engineer 1 day

    3. 3

      Lay out

      Same template as the PEK brochure.

      Founder & CEO 1 day

    4. 4

      Check export rules

      Keep to public, non-controlled data as the site already does.

      Founder & CEO 2 hours

    5. 5

      Publish

      Link on /evk and /how-to-buy.

      Founder & CEO 1 hour

    6. 6

      Measure

      Downloads against EVK inquiries.

      Business Development Lead monthly

    First result
    2 weeks
    Cost
    Staff time only
    Owner
    Battery Pack Design Engineer

    Smallest test

    Send a draft datasheet to three recent EVK inquirers.

    Why it works

    Publish a two-page EVK datasheet: motor, inverter, battery options (10 and 20 kWh), the five configurations, export-power outputs and voltages, weights, compatible platforms, install time, thermal-signature claim with test conditions, and contact details. Link it next to "Request an EVK quote".

    A datasheet is what gets forwarded to the engineer and the budget holder who never visit the site. It also answers the first technical questions before the call.

    Risks and how to handle them

    • Specs still changing

      Version and date the sheet.

    Evidence

    • Your websiteElectric Vehicle Kit page: bolt-on electric or series-hybrid drivetrain for any UTV, including MRZR-class vehicles; up to 15 kW of power export; 165 hp peak and 162 lb-ft; thermal signature "around one-fifth" of combustion; five battery/range-extender configurations from Lightest to All-electric; silent power export demonstrated to special operations forces on MRZR-class vehicles and shown at TEVCON; a YouTube video of the kit in a Polaris RZR XP1000. No datasheet, price, lead time or standards are listed, unlike the PEK page, which has a brochure.Source
    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
    • Partner listingFuel2Electric's EVK listing names Super Powers Mobility Inc. as manufacturer and partner: $30,000 for 10 kWh or $35,000 for 20 kWh; compatible with the Polaris RZR family now, with Can-Am, Yamaha and Kawasaki listed as future models; Alpha deliveries in Q3 2026 and general deliveries in Q2 2027, a "tentative goal".Source
  • 03

    The same EVK is priced in public at $29,000 (RideApart), $30,000 and $35,000 (Fuel2Electric), while spm.us and SPM.FUN show no price at all. A budget holder who searches finds three numbers from other people and none from SPM.

    Medium impactLow effort First result in 1 month Founder & CEO

    First action

    Decide the current list prices for each EVK battery option.

    How to measure it

    Qualified inquiry share

    Now
    –
    Target
    +20%
    By
    60 days

    Steps

    1. 1

      Set prices

      EVK 10 and 20 kWh; PEK per pack range.

      Founder & CEO 1 day

    2. 2

      Update spm.us

      "From" prices on /evk and /pek.

      Founder & CEO 2 hours

    3. 3

      Update SPM.FUN

      Same numbers on the consumer kit page.

      Founder & CEO 2 hours

    4. 4

      Align partners

      Ask Fuel2Electric to match.

      Business Development Lead 1 week

    5. 5

      Add ROM promise

      Two-business-day budgetary quote.

      Business Development Lead 1 hour

    6. 6

      Review

      Inquiry quality after 60 days.

      Founder & CEO 60 days

    First result
    1 month
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Add the EVK price to /evk only and compare inquiry quality for a month.

    Why it works

    Set one "from" price for the 10 kWh and 20 kWh EVK and a budgetary range for the PEK per 15 kWh pack, show them on /evk, /pek and SPM.FUN, and ask Fuel2Electric to match. For government buyers, add "ROM in two business days" next to the price.

    Published starting prices pre-qualify inquiries, help a program office budget before it calls, and stop partner listings from setting the price anchor.

    Risks and how to handle them

    • Price seen as too high by hobby buyers

      Show what the kit replaces and the install time.

    • Government quotes vary by configuration

      Label prices as starting points, not offers.

    Evidence

    • Partner listingFuel2Electric's EVK listing names Super Powers Mobility Inc. as manufacturer and partner: $30,000 for 10 kWh or $35,000 for 20 kWh; compatible with the Polaris RZR family now, with Can-Am, Yamaha and Kawasaki listed as future models; Alpha deliveries in Q3 2026 and general deliveries in Q2 2027, a "tentative goal".Source
    • PressRideApart (September 12, 2025): the DIY EV swap kit at $29,000 and a turn-key vehicle from $50,000, with a $100 refundable reservation; the kit installs in about 12 hours; a goal of 500 to 1,000 units over one to two years, starting with about 10 Alpha customers.Source
    • Your websiteSPM.FUN, SPM's commercial site: the EPEX turn-key electric UTV with a founders pre-order of 30 builds and a refundable $100 hold; the EVK DIY kit; an LB 60/60 battery pack in a separate shop; Special Projects for custom NDAA-compliant battery packs, linking to spm.us; a dealer locator and demo-ride booking; Facebook, Instagram and YouTube links; no prices beyond the deposit.Source
    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source
  • 04

    The PEK page already has the most useful tool on the site: pick the equipment, see the load and hours of silent runtime, and "Send this load profile to SPM". But the result stays on SPM's side. The person who ran it still has to explain the need to a budget holder in their own words.

    High impactMedium effort First result in 1 month Founder & CEO

    First action

    Mock up the one-page PDF from the calculator's current example (1.09 kW, about 11 hours).

    How to measure it

    Calculator-to-quote rate

    Now
    –
    Target
    25% of downloads
    By
    90 days

    Steps

    1. 1

      Design the page

      Load table, packs, runtime, assumptions, price range.

      Founder & CEO 2 days

    2. 2

      Check the math

      Match the calculator and the brochure.

      Battery Pack Design Engineer 1 day

    3. 3

      Build the export

      Client-side PDF from the calculator.

      Founder & CEO 3 days

    4. 4

      Pre-fill the form

      Send the profile with the quote request.

      Founder & CEO 1 day

    5. 5

      Add identifiers

      UEI, CAGE and contact on the PDF footer.

      Business Development Lead 1 hour

    6. 6

      Follow up

      Call within two days of a download with contact details.

      Business Development Lead ongoing

    7. 7

      Measure

      Downloads, sends and quotes.

      Founder & CEO monthly

    First result
    1 month
    Cost
    About a week of web work
    Owner
    Founder & CEO

    Smallest test

    Email a hand-made power budget to the next three PEK inquirers.

    Why it works

    Add a "Download power budget" button that produces a one-page PDF: the equipment list and wattage, total load, packs needed, runtime, assumptions (90% usable capacity, 90% conversion efficiency), weight, the matching PEK configuration, a budgetary price range and SPM's identifiers. Sending the profile to SPM stays as the second button and pre-fills the quote form.

    In government buying, the internal champion has to justify the purchase on paper. Giving them a ready-made, specific document makes SPM the default answer in that paper, and every downloaded budget is a warm lead with the load already defined.

    Risks and how to handle them

    • Runtime estimates taken as guarantees

      Keep the page's existing caveats on load profile, temperature and duty cycle.

    Builds on

    Evidence

    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source
  • 05

    SPM's form already qualifies every inquiry by timeline and budget status and promises it reaches engineering and business development, not a general inbox. It does not say when the reply comes, and a funded, immediate request is treated the same as an exploratory one.

    Medium impactLow effort First result in 2 weeks Business Development Lead

    First action

    Add a notification rule for "immediate and funded" submissions.

    How to measure it

    Funded inquiry reply time

    Now
    –
    Target
    Under 4 business hours
    By
    30 days

    Steps

    1. 1

      Set targets

      Reply times per timeline answer.

      Founder & CEO 1 hour

    2. 2

      Route

      Funded inquiries alert by phone.

      Business Development Lead 1 day

    3. 3

      Auto-reply

      Capability statement and the right datasheet.

      Business Development Lead 1 day

    4. 4

      Update the form

      Show the reply target after submit.

      Founder & CEO 1 hour

    5. 5

      Log

      Reply time per inquiry.

      Business Development Lead ongoing

    6. 6

      Review

      Win rate by reply speed.

      Founder & CEO monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Business Development Lead

    Smallest test

    Answer every funded inquiry within four hours for a month and compare with last quarter.

    Why it works

    Set reply targets by answer: "immediate and funded" the same business day, "within 6 months" in one business day, exploratory in three. Show the target on the thank-you message, route funded inquiries to the founder's phone, and auto-send the capability statement and relevant datasheet at once.

    Funded requests usually go to several vendors at once; the first credible technical reply often sets the requirement. A stated reply time also builds trust in a small team.

    Risks and how to handle them

    • Small team misses targets during travel

      Set a backup responder for travel weeks.

    Evidence

    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source
    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source
  • 06

    The About page says SPM "was founded in 2024"; SPM's Y Combinator profile and its own job posts say 2023, as does Technical.ly. Vendor vetting in defense checks exactly these facts, and a mismatch on the first one invites questions.

    Low impactLow effort First result in 1 week Founder & CEO

    First action

    Correct the founding year on /about.

    How to measure it

    Profiles with matching facts

    Now
    –
    Target
    100%
    By
    30 days

    Steps

    1. 1

      Decide facts

      Founding year, address, team size.

      Founder & CEO 1 hour

    2. 2

      Update About

      Add the facts box.

      Founder & CEO 2 hours

    3. 3

      Update SPM.FUN

      Same facts.

      Founder & CEO 1 hour

    4. 4

      Update profiles

      Y Combinator, LinkedIn, partner listings.

      Founder & CEO 2 hours

    5. 5

      Add structured data

      Organization schema on spm.us.

      Founder & CEO 1 hour

    6. 6

      Recheck

      Every quarter.

      Founder & CEO quarterly

    First result
    1 week
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Fix the year today.

    Why it works

    Pick the correct year and add a facts box on /about: legal name, founded, headquarters and shop location, team size, backers, identifiers (from idea 1), products and contact. Keep it identical on SPM.FUN and in the capability statement.

    Consistent basic facts are the cheapest trust signal for a young supplier and help search engines and AI assistants describe SPM correctly.

    Risks and how to handle them

    • Different dates are both true (incorporation vs. product start)

      State both plainly.

    Builds on

    Evidence

    • Your websiteAbout page: "Super Powers Mobility was founded in 2024"; led by engineers from high-volume EV production; a vertically integrated engineering shop; the Alpha Prototype pictured with the Mayor of Pittsburgh outside the SPM facility; no team, careers or press section.Source
    • Y CombinatorCompany profile: Fall 2026 batch, founded 2023, team of 4, Pittsburgh; started by building 470V off-road EVs, then shifted to battery packs and power export systems for military and consumer use; reports over $400,000 in contracted revenue since it started direct sales; listed news includes "Pittsburgh startup pitches EV kit to elite troops" (July 18, 2026).Source
    • PressTechnical.ly (August 21, 2025): founded 2023, seven people at the time, headquarters in New Kensington, PA; target users include recreational riders, farmers, land management companies and off-grid resorts, with the US military as a potential customer; the long-term aim is to become a powertrain supplier; plans for live demo days and a stronger social media presence; $235,000 of investor funding and $20,000 of grants.Source
  • 07

    SPM is hiring a Battery Pack Design Engineer and a Battery Pack Manufacturing Engineer/Technician in Pittsburgh to scale module and pack production, but spm.us has no careers page; its seven-page sitemap ends at About. Engineers who find SPM through a demo story or a conference cannot see that it is hiring.

    Medium impactLow effort First result in 2 weeks Founder & CEO

    First action

    Publish /careers linking both Y Combinator job posts.

    How to measure it

    Qualified applicants

    Now
    –
    Target
    10 per role
    By
    60 days

    Steps

    1. 1

      Write the page

      Roles, pay, location, what you build.

      Founder & CEO 2 hours

    2. 2

      Add shop photos

      Pack assembly and test bench (no controlled data).

      Battery Pack Manufacturing Engineer/Technician 1 hour

    3. 3

      Link it

      Footer, About, SPM.FUN.

      Founder & CEO 30 minutes

    4. 4

      Reach schools

      Local university career offices and Formula SAE teams.

      Founder & CEO 1 week

    5. 5

      Share

      LinkedIn and YC channels.

      Founder & CEO 1 day

    6. 6

      Track

      Source of each applicant.

      Founder & CEO monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Add a footer link to the YC jobs page today.

    Why it works

    Add /careers with both roles, salary ranges, the on-site Pittsburgh shop, the products they will build (470 V packs, PEK modules, in-house BMS) and photos of the shop. Link it in the footer and on About, and post it to local engineering programs and Formula SAE teams (the design role already prefers Formula SAE leadership).

    For a four-person company, the next two hires decide how fast it can deliver orders. A careers page also tells buyers SPM is scaling production, not just prototyping.

    Risks and how to handle them

    • Page goes stale after hires

      Mark roles filled the same day.

    Evidence

    • Your websiteSitemap (checked November 9, 2026): seven URLs (home, /evk, /pek, /custom-development, /how-to-buy, /about, /privacy), all last modified October 30, 2026; no careers, news, compliance, case-study or contracting pages.Source
    • HiringBattery Pack Design Engineer (Pittsburgh, on-site, $95K-$130K): design packs from 3.6 V to 800 V and up to 100 kWh, with MWh-scale systems planned, including the in-house BMS; applications listed as stationary energy storage, manned and unmanned ground vehicles, Class 1-4 drones and watercraft; SPM calls itself a "dual use company" serving civilian, enterprise and government customers.Source
    • HiringBattery Pack Manufacturing Engineer/Technician (Pittsburgh, $62K-$110K): scale production of 1s5p, 14s5p and 14s9p modules, with 14s5p modules built into a 112s5p, 470 V pack and an in-house BMS; the powertrain is used in an unmanned ground vehicle; the role writes work instructions, runs quality checks and improves manufacturability.Source

This quarter 11

The core plays for the next three months.

  • 08

    The homepage calls SPM's products defense-compliant and SPM.FUN advertises NDAA-compliant packs, but only the PEK page names standards (MIL-STD-1332 power quality, MIL-PRF-62122E slave receptacle, IP54). The EVK and custom pages cite none. Engineers screening suppliers look for a list, not an adjective.

    High impactMedium effort First result in 1 month Battery Pack Design Engineer

    First action

    List every standard SPM designs to and what evidence exists for each.

    How to measure it

    Pre-quote technical emails

    Now
    –
    Target
    -30%
    By
    90 days

    Steps

    1. 1

      Inventory

      Standards and test evidence per product.

      Battery Pack Design Engineer 1 week

    2. 2

      Classify status

      Designed, tested, certified, planned.

      Battery Pack Design Engineer 2 days

    3. 3

      Check claims

      Remove anything without evidence.

      Founder & CEO 1 day

    4. 4

      Publish

      /compliance, linked from each product page.

      Founder & CEO 1 day

    5. 5

      Align SPM.FUN

      Same wording on Special Projects.

      Founder & CEO 1 hour

    6. 6

      Plan tests

      Next third-party tests in order of buyer demand.

      Battery Pack Design Engineer 1 week

    7. 7

      Update

      Each time a test completes.

      Battery Pack Design Engineer ongoing

    First result
    1 month
    Cost
    Staff time; third-party tests budgeted separately
    Owner
    Battery Pack Design Engineer

    Smallest test

    Add a standards section to the EVK page first.

    Why it works

    Add /compliance with a table per product: standard, scope, status (designed to, tested in-house, third-party tested, certified), and date. Cover power quality, interfaces, ingress, shock and vibration, EMI, transport of lithium batteries and sourcing (NDAA cell origin), with only the claims SPM can document.

    A dated, honest matrix shortens technical vetting, shows primes where SPM fits, and makes the test roadmap a sales tool.

    Risks and how to handle them

    • Showing gaps

      Show dates for planned tests; buyers prefer honesty to surprises.

    Evidence

    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
    • Your websiteSPM.FUN, SPM's commercial site: the EPEX turn-key electric UTV with a founders pre-order of 30 builds and a refundable $100 hold; the EVK DIY kit; an LB 60/60 battery pack in a separate shop; Special Projects for custom NDAA-compliant battery packs, linking to spm.us; a dealer locator and demo-ride booking; Facebook, Instagram and YouTube links; no prices beyond the deposit.Source
    • Your websiteCustom Development page: battery packs, power export systems and complete vehicles built in Pittsburgh from prototype to production; a five-step process (Define, Design, Prototype, Validate, Produce) in which SPM can help write the requirement; example builds include a 470 V / 10 kWh vehicle-mounted export pack (about 120 lb added, engine retained) demonstrated on MRZR-class vehicles; no formal standards cited.Source
  • 09

    SPM's strongest proof is scattered: demonstrations of silent power export to special operations forces, TEVCON, the Polaris RZR video, and press about the troop demos are each mentioned in a line or live off-site. There is no single page a buyer can forward that shows SPM's hardware has been in the field.

    Medium impactLow effort First result in 1 month Founder & CEO

    First action

    List every demonstration with date, platform and shareable result.

    How to measure it

    Demo requests

    Now
    –
    Target
    4 a quarter
    By
    2 quarters

    Steps

    1. 1

      List events

      Date, place type, platform, result.

      Founder & CEO 1 day

    2. 2

      Clear for release

      Confirm what can be shown with each audience.

      Business Development Lead 1 week

    3. 3

      Gather media

      Photos, video, measured data.

      Battery Pack Design Engineer 2 days

    4. 4

      Publish

      /field-record linked from home and product pages.

      Founder & CEO 1 day

    5. 5

      Add the button

      Request a demonstration.

      Founder & CEO 1 hour

    6. 6

      Keep adding

      After each event.

      Founder & CEO ongoing

    First result
    1 month
    Cost
    Staff time only
    Owner
    Founder & CEO

    Smallest test

    Add a short "Field record" section to the homepage.

    Why it works

    Publish /field-record: a dated list of demonstrations and shows (described generically where units cannot be named), with photos, the EVK video, the measured results that can be shared (runtime, export kW, noise), and links to press. Add a "Request a demonstration" button.

    For a young supplier, evidence of real hardware in real conditions is what moves an evaluation forward; a dated record also shows momentum.

    Risks and how to handle them

    • Naming military audiences without approval

      Describe them generically unless cleared.

    Evidence

    • Your websiteElectric Vehicle Kit page: bolt-on electric or series-hybrid drivetrain for any UTV, including MRZR-class vehicles; up to 15 kW of power export; 165 hp peak and 162 lb-ft; thermal signature "around one-fifth" of combustion; five battery/range-extender configurations from Lightest to All-electric; silent power export demonstrated to special operations forces on MRZR-class vehicles and shown at TEVCON; a YouTube video of the kit in a Polaris RZR XP1000. No datasheet, price, lead time or standards are listed, unlike the PEK page, which has a brochure.Source
    • Y CombinatorCompany profile: Fall 2026 batch, founded 2023, team of 4, Pittsburgh; started by building 470V off-road EVs, then shifted to battery packs and power export systems for military and consumer use; reports over $400,000 in contracted revenue since it started direct sales; listed news includes "Pittsburgh startup pitches EV kit to elite troops" (July 18, 2026).Source
    • Your websiteSitemap (checked November 9, 2026): seven URLs (home, /evk, /pek, /custom-development, /how-to-buy, /about, /privacy), all last modified October 30, 2026; no careers, news, compliance, case-study or contracting pages.Source
  • 10

    How to Buy mentions evaluation units in one line. For a unit that wants to try silent power before a larger buy, "ask us" is a negotiation; a fixed offer is a purchase.

    High impactMedium effort First result in 1 quarter Business Development Lead

    First action

    Set the evaluation price, term and credit rule for the PEK.

    How to measure it

    Evaluation-to-order rate

    Now
    –
    Target
    40%
    By
    2 quarters

    Steps

    1. 1

      Set terms

      Price, term, credit, return.

      Founder & CEO 2 days

    2. 2

      Write the test plan

      Runtime, noise, thermal, charging.

      Battery Pack Design Engineer 2 days

    3. 3

      Prepare units

      Set aside evaluation stock.

      Battery Pack Manufacturing Engineer/Technician 2 weeks

    4. 4

      Publish

      Button on product and How to Buy pages.

      Founder & CEO 1 day

    5. 5

      Pitch

      To every past demo audience.

      Business Development Lead 2 weeks

    6. 6

      Report results

      Joint report at the end of each evaluation.

      Battery Pack Design Engineer per evaluation

    First result
    1 quarter
    Cost
    Evaluation stock and support time
    Owner
    Business Development Lead

    Smallest test

    Offer one PEK evaluation to the most engaged past demo audience.

    Why it works

    Create "PEK Evaluation" and "EVK Evaluation": a fixed price (credited toward a fleet order), a 60- or 90-day term, delivery and training, a simple test plan (runtime, noise, thermal, charging) and a joint results report. Put it on /pek, /evk and /how-to-buy as its own button.

    A small, fixed-price evaluation fits small purchase budgets and creates the test data that justifies the follow-on order.

    Risks and how to handle them

    • Units tied up without orders

      Charge for evaluations and cap how many run at once.

    Builds on

    Evidence

    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source
    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
  • 11

    In May 2026 the Marine Corps funded Polaris's first 5 kW exportable-power MRZR Alpha variant (the standard one offers 1 kW), with more than 500 MRZR Alphas already in service. That confirms demand for vehicle power, and it leaves the existing fleet and higher-power needs open: SPM demonstrates up to 15 kW with the EVK and a 10 kWh vehicle-mounted pack on MRZR-class vehicles with the engine kept.

    High impactMedium effort First result in 1 quarter Founder & CEO

    First action

    Write the power comparison table from public figures.

    How to measure it

    MRZR-related quote requests

    Now
    –
    Target
    10 a quarter
    By
    2 quarters

    Steps

    1. 1

      Build the table

      1 kW, 5 kW, SPM pack, EVK.

      Battery Pack Design Engineer 2 days

    2. 2

      Map loads

      Which payloads need more than 5 kW.

      Battery Pack Design Engineer 2 days

    3. 3

      Write the page

      Retrofit, weight, mounting, runtime.

      Founder & CEO 3 days

    4. 4

      Fact check

      Use only published competitor figures.

      Founder & CEO 1 day

    5. 5

      Outreach

      Units and offices that run MRZR fleets.

      Business Development Lead 1 month

    6. 6

      Approach Polaris

      As a higher-power supplier option.

      Founder & CEO 1 quarter

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Founder & CEO

    Smallest test

    Send the comparison table to three MRZR operators met at demos.

    Why it works

    Publish a page for MRZR-class operators and program offices: what each option adds (power, voltage outputs, weight, silent runtime), how SPM's pack mounts on vehicles already in service, and which loads need more than 5 kW. Position it as a complement to the vehicle, not a replacement, and offer the same to Polaris as a supplier.

    A buyer who has just seen the value of exportable power is the easiest one to sell more power to, and retrofit avoids waiting for new vehicles.

    Risks and how to handle them

    • Seen as attacking a likely partner

      Frame it as adding power to their vehicle.

    Builds on

    Evidence

    • Competitor researchThe Defense Post (May 26, 2026): the US Marine Corps awarded Polaris a five-year contract worth up to $98 million for MRZR Alpha production, including for the first time a 5 kW exportable power variant at 24 V (the standard variant offers 1 kW); more than 500 MRZR Alphas are in USMC service.Source
    • Your websiteElectric Vehicle Kit page: bolt-on electric or series-hybrid drivetrain for any UTV, including MRZR-class vehicles; up to 15 kW of power export; 165 hp peak and 162 lb-ft; thermal signature "around one-fifth" of combustion; five battery/range-extender configurations from Lightest to All-electric; silent power export demonstrated to special operations forces on MRZR-class vehicles and shown at TEVCON; a YouTube video of the kit in a Polaris RZR XP1000. No datasheet, price, lead time or standards are listed, unlike the PEK page, which has a brochure.Source
    • Your websiteCustom Development page: battery packs, power export systems and complete vehicles built in Pittsburgh from prototype to production; a five-step process (Define, Design, Prototype, Validate, Produce) in which SPM can help write the requirement; example builds include a 470 V / 10 kWh vehicle-mounted export pack (about 120 lb added, engine retained) demonstrated on MRZR-class vehicles; no formal standards cited.Source
  • 12

    "Defense prime or integrator" is one of the four organization types on SPM's form, and How to Buy offers subcontracting as a subsystem supplier, yet no page speaks to that buyer. Primes choose subsystem suppliers on interfaces, integration effort and production readiness.

    High impactMedium effort First result in 1 quarter Business Development Lead

    First action

    Collect the public interface data already on the PEK and custom pages.

    How to measure it

    Teaming agreements signed

    Now
    –
    Target
    2
    By
    2 quarters

    Steps

    1. 1

      Gather data

      Interfaces, envelopes, weights.

      Battery Pack Design Engineer 2 days

    2. 2

      Write the page

      What SPM supplies and how it integrates.

      Business Development Lead 3 days

    3. 3

      State capacity

      Current and planned production.

      Battery Pack Manufacturing Engineer/Technician 1 day

    4. 4

      Template

      Teaming agreement and NDA.

      Founder & CEO 1 week

    5. 5

      Target list

      Integrators of light tactical and unmanned vehicles.

      Business Development Lead 1 week

    6. 6

      Outreach

      Technical intro calls.

      Business Development Lead ongoing

    First result
    1 quarter
    Cost
    Staff time; legal review for templates
    Owner
    Business Development Lead

    Smallest test

    Send the interface summary to three integrators.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Publish /integrators: public interface summaries (NATO slave, M40/M60 receptacles, 28 V DC, 120/208 V AC, 470 V traction), mounting envelopes, comms and controls options, integration support, production capacity and the teaming paths SPM supports. Offer a teaming-agreement template and a technical intro call.

    Selling through primes multiplies a four-person team's reach and fits programs that will not buy directly from a startup.

    Risks and how to handle them

    • Primes ask for controlled detail

      Keep public data public and move the rest to proper channels, as the site already advises.

    Builds on

    Evidence

    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source
    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source
    • Competitor researchRivals' own homepages: Bren-Tronics, "Intelligent military batteries & charging systems"; Epsilor, "Power to Defend", with NATO 6T and high-voltage Li-ion batteries for defense vehicles and robotics; Volcon, electric off-road vehicles with a Military/Fleets section and a Military Sales page.Source
  • 13

    SPM's job posts say its packs go into stationary storage, manned and unmanned ground vehicles, Class 1-4 drones and watercraft, and that its powertrain is used in an unmanned ground vehicle. spm.us shows only UTVs, trailers and shelters, so an unmanned-systems buyer would not know SPM makes packs for them.

    High impactMedium effort First result in 1 quarter Battery Pack Design Engineer

    First action

    Add "Unmanned system pack" to the form's area of interest.

    How to measure it

    Unmanned pack inquiries

    Now
    –
    Target
    6 a quarter
    By
    2 quarters

    Steps

    1. 1

      Add the form option

      Area of interest: unmanned system pack.

      Founder & CEO 30 minutes

    2. 2

      Write the page

      Ranges, modules, BMS, process.

      Battery Pack Design Engineer 3 days

    3. 3

      Add visuals

      Module photos, no controlled data.

      Battery Pack Manufacturing Engineer/Technician 1 day

    4. 4

      Link it

      From Custom Development and the homepage.

      Founder & CEO 1 hour

    5. 5

      Outreach

      Unmanned-vehicle makers and integrators.

      Business Development Lead 1 month

    6. 6

      Review

      Inquiries and quotes.

      Founder & CEO quarterly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Battery Pack Design Engineer

    Smallest test

    Add the form option and count inquiries for a month.

    Why it works

    Add /unmanned-systems: the voltage and energy range SPM designs (3.6 V to 800 V, up to 100 kWh), the module building blocks (1s5p to 14s9p), in-house BMS, and what a custom pack program looks like, with the same inquiry form tagged "unmanned". Add the option to the form's area-of-interest list.

    Unmanned systems need custom, high-density packs in volume, which is exactly the module production SPM is scaling; one page opens a market the company already serves.

    Risks and how to handle them

    • Spreading a small team thin

      Quote only programs that reuse existing modules.

    Evidence

    • HiringBattery Pack Design Engineer (Pittsburgh, on-site, $95K-$130K): design packs from 3.6 V to 800 V and up to 100 kWh, with MWh-scale systems planned, including the in-house BMS; applications listed as stationary energy storage, manned and unmanned ground vehicles, Class 1-4 drones and watercraft; SPM calls itself a "dual use company" serving civilian, enterprise and government customers.Source
    • HiringBattery Pack Manufacturing Engineer/Technician (Pittsburgh, $62K-$110K): scale production of 1s5p, 14s5p and 14s9p modules, with 14s5p modules built into a 112s5p, 470 V pack and an in-house BMS; the powertrain is used in an unmanned ground vehicle; the role writes work instructions, runs quality checks and improves manufacturability.Source
    • Your websiteSitemap (checked November 9, 2026): seven URLs (home, /evk, /pek, /custom-development, /how-to-buy, /about, /privacy), all last modified October 30, 2026; no careers, news, compliance, case-study or contracting pages.Source
  • 14

    The PEK page lists job sites, film sets and disaster response as uses where noise, fumes and fuel are a problem, but all the copy is written for silent watch and counter-UAS payloads. A production manager or emergency planner lands on a military page.

    Medium impactMedium effort First result in 1 month Business Development Lead

    First action

    Write the film-set page with a lighting runtime example.

    How to measure it

    Commercial PEK quote requests

    Now
    –
    Target
    8 a quarter
    By
    2 quarters

    Steps

    1. 1

      Pick examples

      Typical loads for each use.

      Battery Pack Design Engineer 1 day

    2. 2

      Write pages

      Three short pages.

      Business Development Lead 1 week

    3. 3

      Calculator presets

      Film, construction, emergency loads.

      Founder & CEO 2 days

    4. 4

      Search test

      Small budget on high-intent terms.

      Business Development Lead 1 month

    5. 5

      Route

      Commercial leads to a commercial reply.

      Business Development Lead 1 day

    6. 6

      Review

      Cost per inquiry by page.

      Founder & CEO monthly

    First result
    1 month
    Cost
    Small search budget
    Owner
    Business Development Lead

    Smallest test

    Publish the film-set page and run one ad group for a month.

    Why it works

    Create three short landing pages with the same specs translated into their terms: hours of lighting or tools per pack, noise compared with a generator, indoor and fume-free use, charging from shore power, and a runtime example for each. Run small search campaigns on "silent generator" and "battery generator for film sets".

    Commercial buyers decide faster and in smaller amounts than government, which smooths revenue while defense programs take time.

    Risks and how to handle them

    • Price too high against rental generators

      Lead with rental (idea 22) or total cost over a season.

    Builds on

    Evidence

    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
    • Your websiteSPM.FUN, SPM's commercial site: the EPEX turn-key electric UTV with a founders pre-order of 30 builds and a refundable $100 hold; the EVK DIY kit; an LB 60/60 battery pack in a separate shop; Special Projects for custom NDAA-compliant battery packs, linking to spm.us; a dealer locator and demo-ride booking; Facebook, Instagram and YouTube links; no prices beyond the deposit.Source
  • 15

    SPM lists SBIR/STTR and OTA among its custom-program paths and can "help write the requirement", but nothing shows it is pursuing them. For a funded, non-dilutive first program, these are the most realistic entry points for a four-person hardware company.

    High impactMedium effort First result in 2 quarters Founder & CEO

    First action

    Create saved topic searches with five keywords.

    How to measure it

    Proposals submitted

    Now
    –
    Target
    3
    By
    2 quarters

    Steps

    1. 1

      Saved searches

      Five keywords across SBIR and innovation portals.

      Founder & CEO 2 hours

    2. 2

      Weekly review

      Go/no-go on each topic.

      Founder & CEO weekly

    3. 3

      Proposal library

      Team, facility, past results, technical approach.

      Battery Pack Design Engineer 2 weeks

    4. 4

      Line up endorsers

      Ask demo audiences about support letters where allowed.

      Business Development Lead ongoing

    5. 5

      Submit

      First proposal.

      Founder & CEO per topic

    6. 6

      Debrief

      Ask for feedback on each decision.

      Founder & CEO per decision

    First result
    2 quarters
    Cost
    Founder time; optional proposal consultant
    Owner
    Founder & CEO

    Smallest test

    Read this month's topics and score three.

    Why it works

    Set up saved searches on the federal SBIR and innovation-unit portals for topics on exportable power, silent watch, hybrid tactical vehicles, unmanned-system batteries and energy storage. Review weekly, keep a short go/no-go sheet, and pre-write reusable proposal sections (team, facility, PEK and EVK results).

    Topics often describe exactly what SPM already builds; a ready library of proposal sections turns a short submission window into a feasible bid.

    Risks and how to handle them

    • Proposals pull engineers off production

      Bid only topics that fund work already planned.

    Builds on

    Evidence

    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source
    • Your websiteCustom Development page: battery packs, power export systems and complete vehicles built in Pittsburgh from prototype to production; a five-step process (Define, Design, Prototype, Validate, Produce) in which SPM can help write the requirement; example builds include a 470 V / 10 kWh vehicle-mounted export pack (about 120 lb added, engine retained) demonstrated on MRZR-class vehicles; no formal standards cited.Source
  • 16

    Fuel2Electric already sells the EVK under SPM's name, and SPM.FUN has a dealer locator, but the terms differ (price, deposit refund rules, delivery dates) and spm.us does not mention resellers. Each new reseller would invent its own version.

    Medium impactMedium effort First result in 1 quarter Business Development Lead

    First action

    Agree updated terms and copy with Fuel2Electric.

    How to measure it

    Reseller kit orders

    Now
    –
    Target
    10
    By
    2 quarters

    Steps

    1. 1

      Set terms

      Prices, margins, deposits, delivery.

      Founder & CEO 1 week

    2. 2

      Build the pack

      Datasheet, photos, copy, training.

      Business Development Lead 2 weeks

    3. 3

      Align Fuel2Electric

      Update their listing.

      Business Development Lead 2 weeks

    4. 4

      Recruit shops

      UTV performance and install shops.

      Business Development Lead 1 month

    5. 5

      Train

      Install training at the Pittsburgh shop.

      Battery Pack Manufacturing Engineer/Technician per shop

    6. 6

      List

      On the SPM.FUN dealer locator.

      Founder & CEO per shop

    First result
    1 quarter
    Cost
    Margin and training time
    Owner
    Business Development Lead

    Smallest test

    Sign one more shop and track its first quarter.

    Why it works

    Write one reseller pack: list prices and margins, deposit and refund rules, delivery windows, install training, the datasheet, approved photos and copy, and lead routing (resellers get commercial leads in their area). Sign two or three UTV shops beyond Fuel2Electric and list them on SPM.FUN.

    Shops that already install UTV parts can sell and fit kits locally, which a small Pittsburgh team cannot do nationally.

    Risks and how to handle them

    • Install quality varies

      Certify installers before listing them.

    Builds on

    Evidence

    • Partner listingFuel2Electric's EVK listing names Super Powers Mobility Inc. as manufacturer and partner: $30,000 for 10 kWh or $35,000 for 20 kWh; compatible with the Polaris RZR family now, with Can-Am, Yamaha and Kawasaki listed as future models; Alpha deliveries in Q3 2026 and general deliveries in Q2 2027, a "tentative goal".Source
    • Your websiteSPM.FUN, SPM's commercial site: the EPEX turn-key electric UTV with a founders pre-order of 30 builds and a refundable $100 hold; the EVK DIY kit; an LB 60/60 battery pack in a separate shop; Special Projects for custom NDAA-compliant battery packs, linking to spm.us; a dealer locator and demo-ride booking; Facebook, Instagram and YouTube links; no prices beyond the deposit.Source
  • 17

    SPM.FUN links to Facebook, Instagram and YouTube for riders, but spm.us links to no social profile at all, and in 2025 the company said it planned a stronger social presence. Defense program staff, primes and engineers follow suppliers on LinkedIn.

    Medium impactLow effort First result in 1 quarter Founder & CEO

    First action

    Link a LinkedIn page from the spm.us footer.

    How to measure it

    Followers

    Now
    –
    Target
    1,000
    By
    2 quarters

    Steps

    1. 1

      Set up the page

      Same facts as idea 6.

      Founder & CEO 1 hour

    2. 2

      Link it

      spm.us footer.

      Founder & CEO 15 minutes

    3. 3

      Plan clips

      Six months of topics.

      Founder & CEO 2 hours

    4. 4

      Film

      Phone video in the shop and on test days.

      Battery Pack Manufacturing Engineer/Technician monthly

    5. 5

      Post

      One clip a month.

      Founder & CEO monthly

    6. 6

      Review

      Which clips bring inquiries.

      Founder & CEO quarterly

    First result
    1 quarter
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Post the existing EVK video this week.

    Why it works

    Create or tidy the company LinkedIn page, link it from spm.us, and post one short hardware clip a month: a PEK runtime test, an EVK silent drive-by, a pack build in the shop, a demo recap. Reuse each clip on the field record page (idea 9).

    Regular proof of real hardware builds credibility with the slow-moving audience that will buy in 6-12 months, and helps hiring.

    Risks and how to handle them

    • Showing controlled detail

      Review clips against the site's own export rules.

    Builds on

    Evidence

    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source
    • Your websiteSPM.FUN, SPM's commercial site: the EPEX turn-key electric UTV with a founders pre-order of 30 builds and a refundable $100 hold; the EVK DIY kit; an LB 60/60 battery pack in a separate shop; Special Projects for custom NDAA-compliant battery packs, linking to spm.us; a dealer locator and demo-ride booking; Facebook, Instagram and YouTube links; no prices beyond the deposit.Source
    • PressTechnical.ly (August 21, 2025): founded 2023, seven people at the time, headquarters in New Kensington, PA; target users include recreational riders, farmers, land management companies and off-grid resorts, with the US military as a potential customer; the long-term aim is to become a powertrain supplier; plans for live demo days and a stronger social media presence; $235,000 of investor funding and $20,000 of grants.Source
  • 18

    SPM shows running hardware at defense mobility events such as TEVCON, but a booth conversation usually ends with a business card. The PEK calculator could capture each visitor's actual load profile on the spot.

    Medium impactLow effort First result in Next event Business Development Lead

    First action

    Add an event tag parameter to the calculator link.

    How to measure it

    Show lead-to-quote rate

    Now
    –
    Target
    20%
    By
    2 quarters

    Steps

    1. 1

      Tag the link

      Event parameter on the calculator.

      Founder & CEO 1 hour

    2. 2

      Print the QR

      On hardware and handouts.

      Business Development Lead 1 day

    3. 3

      Booth script

      Ask about the load first.

      Business Development Lead 1 hour

    4. 4

      48-hour follow-up

      Power budget, datasheet, evaluation offer.

      Business Development Lead per event

    5. 5

      Track

      Quotes by event.

      Founder & CEO per event

    6. 6

      Decide

      Which shows to repeat.

      Founder & CEO yearly

    First result
    Next event
    Cost
    Printing only
    Owner
    Business Development Lead

    Smallest test

    Use the QR at the next event and compare with the last one.

    Why it works

    At every show, put a QR code on the hardware that opens the runtime calculator with an event tag. Visitors enter their loads; SPM follows up within 48 hours with their power budget (idea 4), the datasheet and an evaluation offer (idea 10).

    A follow-up based on the visitor's own load is far more specific than a generic thank-you, and the event tag shows which shows pay off.

    Risks and how to handle them

    • Poor signal at venues

      Have a tablet with the calculator at the booth.

    Builds on

    Evidence

    • Your websiteElectric Vehicle Kit page: bolt-on electric or series-hybrid drivetrain for any UTV, including MRZR-class vehicles; up to 15 kW of power export; 165 hp peak and 162 lb-ft; thermal signature "around one-fifth" of combustion; five battery/range-extender configurations from Lightest to All-electric; silent power export demonstrated to special operations forces on MRZR-class vehicles and shown at TEVCON; a YouTube video of the kit in a Polaris RZR XP1000. No datasheet, price, lead time or standards are listed, unlike the PEK page, which has a brochure.Source
    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source

Big bets 3

Larger plays that can change the trajectory.

  • 20

    The PEK already stacks to 32 packs (about 480 kWh), and SPM's design-engineer post says MWh-scale systems are planned. A containerized, generator-hybrid stack would take SPM from vehicle accessories to site power, a much larger purchase.

    High impactHigh effort First result in 3 quarters Battery Pack Design Engineer

    First action

    Sketch a 240 kWh configuration from 16 PEK packs and price it.

    How to measure it

    Stationary pilot signed

    Now
    –
    Target
    1
    By
    3 quarters

    Steps

    1. 1

      Define

      Sizes, inputs, outputs, enclosure.

      Battery Pack Design Engineer 1 month

    2. 2

      Validate demand

      Ten conversations with site operators.

      Business Development Lead 1 month

    3. 3

      Prototype

      One stack from production modules.

      Battery Pack Manufacturing Engineer/Technician 1 quarter

    4. 4

      Test

      Bench and site tests.

      Battery Pack Design Engineer 1 month

    5. 5

      Pilot

      Paid pilot with fuel-saved measurement.

      Founder & CEO 1 quarter

    6. 6

      Fund

      Pursue program funding through idea 15.

      Founder & CEO ongoing

    First result
    3 quarters
    Cost
    Prototype materials and engineering time
    Owner
    Battery Pack Design Engineer

    Smallest test

    Quote a 240 kWh stack to two operators and see if they engage.

    Why it works

    Design a skid or container product from standard PEK modules: 100-500 kWh, three-phase output, generator and solar inputs, and a simple remote monitor. Run it with one government or commercial site as a paid pilot, measuring generator hours and fuel saved.

    It reuses the modules SPM is already scaling, so more volume lowers cost across every product, and fuel saved is a measurable, budget-friendly benefit.

    Risks and how to handle them

    • Stationary safety and certification costs

      Start with temporary and off-grid sites before grid-tied ones.

    Builds on

    Evidence

    • HiringBattery Pack Design Engineer (Pittsburgh, on-site, $95K-$130K): design packs from 3.6 V to 800 V and up to 100 kWh, with MWh-scale systems planned, including the in-house BMS; applications listed as stationary energy storage, manned and unmanned ground vehicles, Class 1-4 drones and watercraft; SPM calls itself a "dual use company" serving civilian, enterprise and government customers.Source
    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
  • 21

    SPM said in 2025 that its long-term aim is to be a powertrain supplier, and its partner listing already plans Can-Am, Yamaha and Kawasaki fitments after the Polaris RZR. Selling one kit at a time to riders caps volume; one OEM or upfitter program could exceed the 500-1,000 unit goal on its own.

    High impactHigh effort First result in 3-4 quarters Founder & CEO

    First action

    List ten UTV makers and upfitters without an electric drivetrain of their own.

    How to measure it

    OEM development agreements

    Now
    –
    Target
    1
    By
    4 quarters

    Steps

    1. 1

      Target list

      Makers and upfitters without in-house EV drivetrains.

      Business Development Lead 2 weeks

    2. 2

      OEM pack

      Specs, integration support, pricing at volume.

      Founder & CEO 1 month

    3. 3

      Capacity plan

      Module and pack output by quarter.

      Battery Pack Manufacturing Engineer/Technician 1 month

    4. 4

      Reference vehicle

      Use the Alpha Prototype and RZR build.

      Battery Pack Design Engineer ongoing

    5. 5

      Approach

      Engineering intro meetings.

      Founder & CEO 1 quarter

    6. 6

      Development deal

      Paid integration on one model.

      Founder & CEO 2 quarters

    First result
    3-4 quarters
    Cost
    Business development time; integration engineering funded by partner
    Owner
    Founder & CEO

    Smallest test

    Pitch two upfitters and see whether they fund a prototype.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Package the EVK drivetrain (motor, inverter, 470 V pack, BMS, thermal, harness) as an OEM and upfitter offer with integration engineering, a production-capacity plan in Pittsburgh and a reference vehicle. Target smaller UTV makers and military upfitters first, where an outside powertrain is most welcome.

    Supplier volume is what lowers pack cost, and an OEM program turns SPM's hardware into recurring production revenue rather than custom projects.

    Risks and how to handle them

    • OEMs build in-house

      Start with makers too small to justify their own EV program.

    Builds on

    Evidence

    • PressTechnical.ly (August 21, 2025): founded 2023, seven people at the time, headquarters in New Kensington, PA; target users include recreational riders, farmers, land management companies and off-grid resorts, with the US military as a potential customer; the long-term aim is to become a powertrain supplier; plans for live demo days and a stronger social media presence; $235,000 of investor funding and $20,000 of grants.Source
    • Partner listingFuel2Electric's EVK listing names Super Powers Mobility Inc. as manufacturer and partner: $30,000 for 10 kWh or $35,000 for 20 kWh; compatible with the Polaris RZR family now, with Can-Am, Yamaha and Kawasaki listed as future models; Alpha deliveries in Q3 2026 and general deliveries in Q2 2027, a "tentative goal".Source
    • PressRideApart (September 12, 2025): the DIY EV swap kit at $29,000 and a turn-key vehicle from $50,000, with a $100 refundable reservation; the kit installs in about 12 hours; a goal of 500 to 1,000 units over one to two years, starting with about 10 Alpha customers.Source
    • HiringBattery Pack Manufacturing Engineer/Technician (Pittsburgh, $62K-$110K): scale production of 1s5p, 14s5p and 14s9p modules, with 14s5p modules built into a 112s5p, 470 V pack and an in-house BMS; the powertrain is used in an unmanned ground vehicle; the role writes work instructions, runs quality checks and improves manufacturability.Source
  • 22

    Film sets and job sites, two of the PEK's listed uses, normally rent their generators by the day or week rather than buy them. Selling a 15 kWh battery system outright to them is a hard sale; renting it is the way that market already buys.

    High impactHigh effort First result in 2 quarters Founder & CEO

    First action

    Ask three local production and construction firms what they pay for generator rental per week.

    How to measure it

    Fleet utilization

    Now
    –
    Target
    50% of days
    By
    3 quarters

    Steps

    1. 1

      Price check

      Local generator rental and fuel costs.

      Business Development Lead 2 weeks

    2. 2

      Build fleet

      Three to five PEKs.

      Battery Pack Manufacturing Engineer/Technician 1 quarter

    3. 3

      Terms

      Daily and weekly rates, damage, delivery.

      Founder & CEO 2 weeks

    4. 4

      Launch locally

      Film and construction firms near Pittsburgh.

      Business Development Lead 1 month

    5. 5

      Partner

      Rental houses in other regions.

      Business Development Lead 2 quarters

    6. 6

      Convert

      Offer rent-to-own to repeat renters.

      Founder & CEO ongoing

    First result
    2 quarters
    Cost
    Fleet inventory (capital) and insurance
    Owner
    Founder & CEO

    Smallest test

    Rent one PEK to one production for a week.

    Why it works

    Build a small fleet of PEKs for daily and weekly rental in the Pittsburgh region, then through rental-house partners elsewhere. Price against diesel generator rental plus fuel and include delivery and charging. Use rental days to build field data and convert repeat renters to buyers.

    Rental removes the upfront cost barrier, earns recurring revenue from the same hardware, and creates a stream of commercial users and data the defense pitch can cite.

    Risks and how to handle them

    • Capital tied up in inventory

      Start with evaluation units and partner rental houses.

    • Damage and charging logistics

      Deliver charged units and collect them.

    Builds on

    Evidence

    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
    • Your websiteHow to buy: the EVK and PEK are "sold to the public today" and commercial-item procedures may apply; quotes from one unit to a fleet, rough order of magnitude (ROM) estimates, evaluation units, and direct purchase or purchase through a prime; custom programs via direct award, OTA, SBIR/STTR, subcontracting to a prime or commercial engineering agreements. The page lists no UEI, CAGE code, NAICS codes, contract vehicles, capability statement, prices or lead times; the only next step is the inquiry form or [email protected].Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 19

    SPM already has a photo of its Alpha Prototype with the Mayor of Pittsburgh outside its facility, and the PEK page names disaster response as a use. A local public pilot is the fastest way to get a named, quotable government user without a long federal process.

    Medium impactMedium effort First result in 1 quarter Founder & CEO

    First action

    Ask the mayor's office who runs emergency power for public events.

    How to measure it

    Named local government reference

    Now
    –
    Target
    1
    By
    2 quarters

    Steps

    1. 1

      Find the owner

      Emergency management or special events office.

      Founder & CEO 2 weeks

    2. 2

      Offer the loan

      90 days, one PEK, training.

      Founder & CEO 1 week

    3. 3

      Set the log

      Hours, loads, fuel avoided.

      Battery Pack Design Engineer 1 day

    4. 4

      Support

      On call during use.

      Battery Pack Manufacturing Engineer/Technician 90 days

    5. 5

      Publish

      Results with permission.

      Founder & CEO 1 week

    6. 6

      Repeat

      Other cities and utilities.

      Business Development Lead ongoing

    First result
    1 quarter
    Cost
    One unit on loan
    Owner
    Founder & CEO

    Smallest test

    Offer a PEK for one public event.

    Why it works

    Offer one PEK on a 90-day loan to a city or county emergency-management office for shelters, cooling centers or public events, with a simple logbook (hours, loads, generator fuel avoided). Publish the results with permission and use them for other cities and utilities.

    Local governments buy through simpler processes, value home-grown manufacturers, and give public references that federal customers often cannot.

    Risks and how to handle them

    • No budget to buy afterwards

      Agree a purchase or lease option at the start.

    Evidence

    • Your websiteAbout page: "Super Powers Mobility was founded in 2024"; led by engineers from high-volume EV production; a vertically integrated engineering shop; the Alpha Prototype pictured with the Mayor of Pittsburgh outside the SPM facility; no team, careers or press section.Source
    • Your websitePower Export Kit page: 15 kWh packs (48 V) stackable to 32; 28 V DC at 14 kW continuous through a NATO slave receptacle (MIL-PRF-62122E); 120/208 V AC three-phase at 12 kW continuous (24 kW option); AC power quality to MIL-STD-1332; IP54; 350 lb with 15 kWh; uses from radios, sensors and counter-UAS payloads to job sites, film sets and disaster response; a runtime calculator (a 1.09 kW silent-watch example runs about 11 hours on one pack) with "Send this load profile to SPM"; a downloadable PEK brochure (PDF); no price or lead time.Source
  • 23

    SPM reports over $400,000 in contracted revenue since direct sales began, yet spm.us names no customer or program and has no case studies. Buyers cannot see that anyone has bought.

    Medium impactLow effort First result in 1 month Business Development Lead

    First action

    List contracts and ask each customer what can be shared.

    How to measure it

    Profiles live

    Now
    –
    Target
    3
    By
    1 quarter

    Steps

    1. 1

      List contracts

      What was built and delivered.

      Founder & CEO 1 day

    2. 2

      Ask permission

      What each customer allows.

      Business Development Lead 2 weeks

    3. 3

      Write

      Problem, build, timeline, results.

      Business Development Lead 1 week

    4. 4

      Review

      Customer approval and controlled-data check.

      Founder & CEO 1 week

    5. 5

      Publish

      On Custom Development and the field record page.

      Founder & CEO 1 day

    6. 6

      Upgrade

      Add names and quotes when allowed.

      Business Development Lead ongoing

    First result
    1 month
    Cost
    $0
    Owner
    Business Development Lead

    Smallest test

    Publish one profile this month.

    Why it works

    Write three short profiles without names where needed: the type of customer (for example "a defense integrator" or "an industrial customer"), the problem, what SPM built, timeline from inquiry to delivery, and measured results. Ask each customer whether a name or quote can be added later.

    Even anonymized, specific stories of paid delivery reduce the perceived risk of buying from a four-person company.

    Risks and how to handle them

    • Customers decline

      Publish a combined summary of work types and volumes instead.

    Builds on

    Evidence

    • Y CombinatorCompany profile: Fall 2026 batch, founded 2023, team of 4, Pittsburgh; started by building 470V off-road EVs, then shifted to battery packs and power export systems for military and consumer use; reports over $400,000 in contracted revenue since it started direct sales; listed news includes "Pittsburgh startup pitches EV kit to elite troops" (July 18, 2026).Source
    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source
  • 24

    SPM runs two sites that send buyers to each other: spm.us points civilians to SPM.FUN, and SPM.FUN's Special Projects points to spm.us. With one small team answering both, it needs to know which pages, sites and partners produce funded inquiries.

    Medium impactLow effort First result in 1 month Founder & CEO

    First action

    Add a hidden page-and-site field to both inquiry forms.

    How to measure it

    Source coverage

    Now
    –
    Target
    95%
    By
    30 days

    Steps

    1. 1

      Add fields

      Site, page, campaign, event tag.

      Founder & CEO 1 day

    2. 2

      One list

      Shared inquiry sheet or CRM.

      Business Development Lead 1 day

    3. 3

      Tag partners

      Links from Fuel2Electric and resellers.

      Business Development Lead 1 day

    4. 4

      Log outcomes

      Quote, evaluation, order.

      Business Development Lead ongoing

    5. 5

      Review

      Sources by funded outcome.

      Founder & CEO monthly

    6. 6

      Reallocate

      Do more of what works.

      Founder & CEO monthly

    First result
    1 month
    Cost
    $0
    Owner
    Founder & CEO

    Smallest test

    Tag the next 20 inquiries by hand.

    Why it works

    Add a hidden source field to every form (site, page, campaign, partner, event tag), keep one shared inquiry sheet or CRM for both sites, and review monthly which sources produce quotes and orders. Use it to decide where to spend the next month's effort.

    With few inquiries, each one matters; knowing which page produced a funded buyer tells a founder-led team what to repeat.

    Risks and how to handle them

    • Too few inquiries to read patterns

      Review quarterly as well as monthly.

    Evidence

    • Your websiteSPM.FUN, SPM's commercial site: the EPEX turn-key electric UTV with a founders pre-order of 30 builds and a refundable $100 hold; the EVK DIY kit; an LB 60/60 battery pack in a separate shop; Special Projects for custom NDAA-compliant battery packs, linking to spm.us; a dealer locator and demo-ride booking; Facebook, Instagram and YouTube links; no prices beyond the deposit.Source
    • Your websiteHomepage: "High-performance battery packs and power export systems" for government, defense and industry; three offers (Power Export Kit, Electric Vehicle Kit, Custom Development); a "Request a quote" form asking organization type (government agency or military unit, defense prime or integrator, commercial or industrial, other), platform (for example MRZR, Polaris RZR, a trailer or shelter), timeline (immediate and funded, within 6 months, 6-12 months, exploratory) and budget status, which it says goes to the engineering and business development team; no named customers or programs; footer links only to email, About, How to buy and Privacy (no social profiles); a dual-use section sends civilian buyers to SPM.FUN.Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

Have it built

ProgrammableAgency

2 of the 24 ideas are things Programmable builds and runs for its customers: pages, outreach, prospect lists, booking flows and monitors. Pick one, or send the whole list.

Prospect lists2The list compiled from public sources, verified, deduplicated and delivered to your CRM.

A 30-minute session with the engineer who would build it, not a sales call. You leave with a plan whether or not you hire us.

Book a working session

Usually live within days.

Tools for the rest

ProgrammableInfo

Turn the research into a list you can act on

These ideas start with finding the right companies. Info finds them and the right person at each, researches every one and drafts the outreach, then asks before it sends.

  • Build this list in Info for idea #13 (opens programmable.info in a new tab)

New accounts: 100,000 free credits with code BETA100K

Find the companies (opens programmable.info in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Veeva Systems growth strategyThe industry cloud for life sciences: Vault applications for clinical, regulatory, safety, quality and commercial work, Vault CRM, data…22 growth ideas
  • Takealot Group growth strategySouth Africa's largest online retailer and marketplace (takealot.com), with Mr D for food, grocery and retail delivery, Takealot…22 growth ideas
  • Sarilla growth strategyMakes organic, alcohol-free sparkling teas brewed from Rwandan tea and botanicals (Green Tea, Lemon Tea, Chamomile Lime and a new…22 growth ideas
  • Terra growth strategyA digital marketing and creative agency: strategy, design, websites, inbound and AEO/SEO, paid campaigns and AI marketing, plus its own AI…21 growth ideas
  • DeepIntent growth strategyA healthcare marketing platform: Cortex (a healthcare demand side platform), Helix (a healthcare marketing cloud for agencies), Helix AI…21 growth ideas
  • Zatanna growth strategyTurns software workflows that only work through a human interface (EHR and dental practice systems, ERPs, carrier, insurance and other…23 growth ideas
  • Ramain growth strategyAI employees ("digital workers") that learn a business process once and then run it through the screens of the systems a team already uses…22 growth ideas
  • Flowtel growth strategyAn AI operating layer for hotels: Lila, an AI voice agent that answers every guest call and books into the PMS; Hotel OS, a system of…24 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on November 10, 2026, and cites them throughout. Super Powers Mobility (SPM) did not commission, review or endorse it, and Programmable is not affiliated with Super Powers Mobility (SPM). Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Super Powers Mobility (SPM) runs its business.

Something wrong, or do you represent Super Powers Mobility (SPM)? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    Procurement block on How to Buy, EVK datasheet, one public EVK price, printable power budget, reply times on the form, company facts and a careers page.

  2. Days 31 to 6013 ideas

    Compliance matrix, field record, packaged evaluation units, the MRZR upgrade page, integrator page, unmanned-systems packs, commercial silent-power pages, SBIR/OTA watch, resellers, LinkedIn, trade-show follow-up, program profiles and inquiry tracking.

  3. Days 61 to 904 ideas

    Start the bigger bets: a city emergency-power pilot, base-scale PEK stacks, OEM powertrain supply and a PEK rental fleet.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value silent power instead of idling engines or towed generators. The most cited problem: acoustic and thermal signatures and fuel resupply.

  • Bolt-on kits that fit vehicles already in the fleet
  • Not enough exportable power on light tactical vehicles
  • In their words: “silent watch”

Market

Competitive landscape

4 competitors compared: Polaris Government & Defense, Bren-Tronics, Epsilor and Volcon.

  • Gap to exploit: High exportable power on vehicles already fielded
  • Polaris Government & Defense: 5 kW of export power, against SPM's 12-15 kW
  • Bren-Tronics: Portable batteries rather than vehicle drivetrains

Hiring signals

SPM is hiring to make batteries at production scale, not to grow sales: a Battery Pack Design Engineer for packs from 3.6 V to 800 V with MWh-scale systems planned, and a Battery Pack Manufacturing Engineer/Technician…

  • Battery Pack Design Engineer: Packs up to 800 V and 100 kWh, MWh-scale planned; drones, UGVs, watercraft, storage. Ideas 13, 20.
  • Battery Pack Manufacturing Engineer/Technician: Scaling module and 470 V pack production. Ideas 7, 12, 21.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks first (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence