The Business Development Manager post asks for "active requests for proposals... for tunneling projects (water, sewer, and transport)" and projects "that could become tunneling projects". But boringcompany.com sells water and sewer to nobody: the Tunnels page lists "Utility" as a use, yet all eight project cards are Loop, R&D or Hyperloop, there is no utility spec or price, and the only way in is one email address. A utility engineer who searches for a faster, cheaper sewer or stormwater tunnel finds a passenger-car system.
First action
Draft the page outline with the business development team using the specs already on the Prufrock and Tunnels pages.
How to measure it
Utility project inquiries
- Now
- –
- Target
- 15 a quarter
- By
- 2 quarters
Steps
Agree the offer
Diameters, depths, ground types and what TBC will bid on.
Business Development Manager 1 week
Gather proof
LVCC cost and schedule, Encore, Nashville hard rock.
Business Development Associate 3 days
Write the page
For utility engineers, not riders.
Business Development Manager 1 week
Build the intake
Project type, length, ground, RFP link and dates.
Web team 3 days
Route
Form answers into the business development CRM.
Business Development Associate 1 day
Promote
Send to water and sewer agencies in Texas, Nevada and Tennessee.
Business Development Manager 1 month
Measure
Inquiries, bid invitations and proposals submitted.
Business Development Manager monthly
Why it works
Build a "Utility tunnels" page for water, sewer, stormwater and power: tunnel diameter and depth range, soft-soil and hard-rock capability (Prufrock-MB in 10,000+ psi limestone), launch without a pit within 24 hours, zero people in the tunnel, and the cost and speed proof from LVCC (1.7 miles, about a year, $47 million firm-fixed) and the Encore connector (under 12 weeks). End with an "Invite us to bid / share your project" form: owner, project type, length, ground conditions, RFP link and dates. Send it to the business development team's CRM.
Utilities and public works departments buy tunnels every year through public RFPs. A page that speaks their language puts The Boring Company on the shortlist before an RFP is written, and the intake form gives the new team a pipeline it can measure.
Ready to use
ChecklistUtility tunnels page
[ ] Uses: water, sewer, stormwater, power, telecom [ ] Diameter and depth range [ ] Soft soil and hard rock (Prufrock-MB) [ ] No launch pit, 24-hour launch, zero people in tunnel [ ] Proof: LVCC firm-fixed price and schedule, Encore under 12 weeks [ ] Intake: owner, type, length, ground, RFP link, dates [ ] Routed to the business development CRM
Risks and how to handle them
Utility work has different specs
State the diameters and conditions TBC will bid on, and say what it will not do.
Inquiries outside capacity
Use the form to rank by fit and timing.
Evidence
- HiringBusiness Development Manager (Bastrop, Las Vegas or Nashville; first posted August 6, 2026): "Identify active requests for proposals in the United States for tunneling projects (water, sewer, and transport) and non-tunneling projects that could become tunneling projects", "Create new revenue-generating tunnel projects... by persuading key stakeholders that a TBC tunnel meets their needs" and "Help write, review, and submit proposals to local, state, and federal entities." 3+ years of marketing experience is preferred. A Business Development Associate role prepares "external facing client briefings".Source
- Your websiteTunnels page: "safe, fast-to-dig, and low-cost transportation, utility, and freight tunnels", with uses listed as Loop, Utility, Freight, Pedestrian and Bare, but all eight project cards are Loop, R&D, Cybertunnel or Hyperloop; there is no water, sewer or utility project, spec or price. The LVCC Loop (1.7 miles) "was built in approximately 1 year" for "approximately $47 million (firm-fixed price)" with "zero disruptions or road closures". The only contact on the site is the email address in the footer.Source
- Your websitePrufrock page: targeting "a speed of 1 mile per week and an all-in cost of a Loop Transportation tunnel of less than $5M/mile"; Prufrock "launches into the ground within 24 hours" with no launch pit; zero people in the tunnel; the hard-rock Prufrock-MB is mining "10,000+ psi limestone in Nashville". The factory tour links go to two videos by Tesla Owners Silicon Valley (July 2026).Source
- Your websiteSeries D announcement (September 9, 2026): $3B led by the United Arab Emirates at a $23 billion valuation, with a partnership for "150+ kilometers of tunnel" in the UAE beyond Dubai Loop; the Encore connector was "completed in less than 12 weeks"; Music City Loop is the first hard-rock project; the money will "significantly increase hiring across engineering, operations, and production".Source