ProgrammableMarketing/cascadespace.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 12
  • Big bets · 3
  • Wildcards · 1
Generated Nov 10, 2026 1 view
  1. Programmable
  2. Playbooks
  3. Cascade Space
Cascade Space logo

growth playbook · Nov 10, 2026

cascadespace.com (opens in a new tab)

Cascade Space growth playbook

Diagnosis

Cascade Space is a seed-stage Y Combinator company ($5.9 million raised, a team of 7) building a commercial alternative to the Deep Space Network. Its roadmap runs from a Mini S-band array in Q4 2026 to global Deep+ coverage in Q1 2028, and it also sells Designer, a link-budget tool built on its open-source spacelink library.

The site is fast (PageSpeed 99) and publishes detailed performance specs, but it does little to turn readers into customers. It shows no prices and no contact email, the News page has one post, two domains serve the same site, and both product pages end in the same "Book Reservation" button.

This playbook starts by turning the published G/T and EIRP table into a link check, so every reservation arrives as a qualified mission. It then opens Designer to self-serve and fixes the domain and AI-profile confusion. After that it builds proof one milestone at a time, recruits dish owners and mission teams, and ends with a launch-customer program and one per-mission contract covering Design, Test and Operate.

Growth Score

6/10

Biggest Opportunity

Mission comms engineers decide on link margin. If the site answers "does my link close, on which configuration, and from when", the open specs become a ranked, qualified pipeline.

Biggest Risk

Buyers have to trust a network that has not yet served a customer, against established providers such as Goonhilly, KSAT and SSC, and any slip in the hardware roadmap would damage that trust.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Turn the Array's performance table into a "will my link close?" check, and make Book Reservation capture the mission

    Use spacelink to work out one reference case (lunar distance, S-band, 2 Mbps) and check it against the published table.

    High impact First result in 1 month
  2. 2

    Say who Designer is for and let engineers start it themselves, instead of ending the page in a "Book Reservation" button

    Decide the access model: open sign-up, a free tier, or a waitlist.

    High impact First result in 2 weeks
  3. 3

    Give mission teams a way to reach you: a contact page and a missions email

    Create the missions mailbox and add it to the footer.

    Medium impact First result in 2 weeks

02

Your idea portfolio

22 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 8 ideas are marked Unexpected: plays you are unlikely to have tried.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 1Big bets · 8Fill-ins · 10Reconsider · 3
Effort →

Showing 22 of 22 ideas

This week 6

Quick wins with a clear first action.

  • 01

    The Array page publishes G/T and EIRP for five configurations (Mini to Deep+) and a roadmap through 2028, which is rare openness for a ground network. Even so, a mission engineer still has to run their own link budget in a spreadsheet to learn whether Cascade works for their spacecraft. The only action on the page is a "Book Reservation" button, and the site has no prices, no contact email and no customer proof. Designer already models the Cascade Array with pricing per configuration, and spacelink already does the math, so the answer is already in-house. The page just doesn't show it.

    High impactMedium effort First result in 1 month Lead Communication Systems En…

    First action

    Use spacelink to work out one reference case (lunar distance, S-band, 2 Mbps) and check it against the published table.

    How to measure it

    Qualified reservations

    Now
    –
    Target
    5 a month
    By
    90 days

    Steps

    1. 1

      Define inputs

      Five inputs with sensible defaults for LEO, lunar and Mars-distance missions.

      Lead Communication Systems Engineer 2 days

    2. 2

      Write the calculation

      spacelink margin per configuration from the published G/T and EIRP.

      Principal Communication Systems Engineer 3 days

    3. 3

      Validate

      Compare against three link budgets the team has already built.

      Principal Communication Systems Engineer 2 days

    4. 4

      Build the check

      A component on /array/, no sign-in, results in under a second.

      CTO (co-founder) 1 week

    5. 5

      Rebuild the reservation

      Form prefilled with the check's numbers plus mission, target, launch window and contact.

      CTO (co-founder) 2 days

    6. 6

      Link to Designer

      "Open this in Designer" carries the same inputs.

      CTO (co-founder) 2 days

    7. 7

      Reply fast

      Each reservation answered within one business day with a margin note.

      CEO (co-founder) ongoing

    8. 8

      Track

      Checks run, reservations, and configurations requested.

      CEO (co-founder) monthly

    First result
    1 month
    Cost
    About two weeks of engineering time
    Owner
    Lead Communication Systems Engineer

    Smallest test

    Under the performance table, publish a static table of margins for three reference missions (LEO, lunar, Mars distance) and count reservations for a month.

    Why it works

    Add a short check above the performance table with five inputs: band (S, X or Ka), distance (LEO, lunar or a custom range), spacecraft EIRP (downlink) or G/T (uplink), data rate, and coding mode. Using spacelink, show the margin for each configuration, the smallest configuration that closes with 3 dB of margin, and the roadmap date for that configuration. Replace the bare button with a short reservation form prefilled with those numbers, plus mission name, target, launch window and contact. Add an "open this in Designer" link with the same inputs. Every reservation then arrives with its link already sized.

    Comms engineers decide on numbers, and Cascade's own YC launch says they work from datasheets, vendor calls and spreadsheets. If the page answers "does it close, on which configuration, and when", it removes the first round of emails. It also makes the homepage's dynamic-aperture argument concrete and gives the founders a pipeline they can rank by launch date and configuration.

    Ready to use

    ChecklistLink check spec

    Inputs: band (S / X / Ka); distance (LEO, lunar, custom km); spacecraft EIRP (dBW) or G/T (dB/K); data rate; coding mode (CCSDS)
    Outputs: margin per configuration (Mini, Lunar, Lunar+, Deep, Deep+); smallest configuration with 3 dB margin; roadmap date for it
    Reservation form: prefilled numbers + mission name, target body, launch window, contact
    Links: "Open in Designer" with the same inputs
    Disclaimer: first-order estimate; full review in Designer

    Risks and how to handle them

    • Prospects treat a quick estimate as a guarantee

      Label it a first-order estimate and offer a full Designer review for flight design.

    • Deep space ranges don't close on today's configurations

      Show the roadmap date next to each configuration, so the answer reads "closes on Deep+ from Q1 2028" rather than "no".

    Evidence

    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Your websiteHomepage (checked November 9, 2026): H1 "Your Signal. Our Mission." and "New Capacity coming online in 2027"; it says the Deep Space Network is oversubscribed and unavailable for commercial missions and that commercial alternatives are limited, fragmented and unreliable; it argues an array of smaller dishes is cheaper to build and more reliable than one large dish, with dynamic aperture size and pricing; two products, Array and Designer; a newsletter signup; no customers, testimonials, prices, email address or phone number.Source
    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
  • 02

    The seed round was raised to accelerate Designer, yet its page ends with the heading "Schedule Your Demo" above a button labelled "Book Reservation", the same label the Array page uses. The page never says who can use Designer, whether an engineer can try it, or what it costs. Comms engineers who live in spreadsheets want to try a link budget, not book a call.

    High impactLow effort First result in 2 weeks CTO

    First action

    Decide the access model: open sign-up, a free tier, or a waitlist.

    How to measure it

    Designer sign-ups

    Now
    –
    Target
    40 a month
    By
    90 days

    Steps

    1. 1

      Decide access

      Open, free tier or waitlist, and what is paid.

      CEO (co-founder) 1 day

    2. 2

      Write the copy

      Who it's for, what's free, what happens after the click.

      CEO (co-founder) 1 day

    3. 3

      Relabel buttons

      "Start a link budget" and "Talk to an engineer".

      CTO (co-founder) 2 hours

    4. 4

      Build the start path

      Sign-up straight into a sample workspace.

      CTO (co-founder) 3 days

    5. 5

      Add a template

      A sample lunar S-band link budget to edit.

      Lead Communication Systems Engineer 1 day

    6. 6

      Track

      Sign-ups, first budget saved, Array modeled.

      CEO (co-founder) weekly

    First result
    2 weeks
    Cost
    Engineering time
    Owner
    CTO (co founder)

    Smallest test

    Relabel the button "Request Designer access" and count clicks for two weeks.

    Why it works

    Rewrite the end of the page around three choices. First, one line on who Designer is for (any spacecraft team doing link budgets). Second, a "Start a link budget" button that opens a self-serve workspace, or a waitlist that promises access within a week. Third, a separate "Talk to an engineer" link. Label each button with what happens next, and say what is free and what is paid (for example, a free single user, with paid team sharing and API).

    Clear labels remove doubt about what a click does. A self-serve start lets engineers find out how good the tool is on their own mission, and every workspace that models the Cascade Array becomes an early signal for the network's pipeline.

    Risks and how to handle them

    • Support load from self-serve users

      Ship templates and hold a weekly office hour instead of one-to-one calls.

    Evidence

    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • PressSeed round announcement (July 24, 2025): $5.9 million from investors including Y Combinator, Nova Threshold and Undeterred Capital, to accelerate Cascade Designer; spacelink released as open source; the team includes engineers with SpaceX and Astra experience; the CEO: "Communication system design, test, and operation is a major bottleneck for space companies".Source
    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
  • 03

    The site has no contact page (/contact/ returns 404), no phone number, and only one email address, [email removed], on the careers page. The YC launch asks mission teams to "drop us a line", but the site gives them no line to use. Program managers and procurement teams often want to send a spec or ask a question before they book anything.

    Medium impactLow effort First result in 2 weeks CEO

    First action

    Create the missions mailbox and add it to the footer.

    How to measure it

    Mission inquiries

    Now
    –
    Target
    8 a month
    By
    60 days

    Steps

    1. 1

      Create the mailbox

      A shared missions address routed to both founders.

      CEO (co-founder) 1 hour

    2. 2

      Build the page

      /contact with the form and the address.

      CTO (co-founder) 1 day

    3. 3

      Link it

      Footer, Array page and Designer page.

      CTO (co-founder) 1 hour

    4. 4

      Set the promise

      Reply within one business day.

      Executive Assistant ongoing

    5. 5

      Log inquiries

      Mission, target, band and stage in one sheet.

      Executive Assistant ongoing

    6. 6

      Review

      Which questions repeat; answer them on the site.

      CEO (co-founder) monthly

    First result
    2 weeks
    Cost
    $0
    Owner
    CEO (co founder)

    Smallest test

    Add the missions email to the footer today.

    Why it works

    Add a /contact page with a missions email address and a short form (mission, target, launch window, band, question), promise a reply within one business day, and link to it from the footer and both product pages. Put the email address in the footer too.

    Some buyers will never press "Book Reservation" on a new network, but they will send an email. A visible address also signals that a real team stands behind the specs.

    Risks and how to handle them

    • Spam

      Use a form with a simple challenge and keep the address as text.

    Evidence

    • Your websiteSite checks (November 9, 2026): /contact/, /sitemap.xml and /robots.txt return 404; the only email address on the site is [email removed]; cascade.space serves the same site without redirecting to cascadespace.com, and the GitHub repo, spacelink docs and YC Launch post link to cascade.space while the YC company profile lists cascadespace.com; page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"); the News page has one post, "Seed Round Announcement" (July 24, 2025).Source
    • Your websiteHomepage (checked November 9, 2026): H1 "Your Signal. Our Mission." and "New Capacity coming online in 2027"; it says the Deep Space Network is oversubscribed and unavailable for commercial missions and that commercial alternatives are limited, fragmented and unreliable; it argues an array of smaller dishes is cheaper to build and more reliable than one large dish, with dynamic aperture size and pricing; two products, Array and Designer; a newsletter signup; no customers, testimonials, prices, email address or phone number.Source
    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
  • 04

    cascade.space and cascadespace.com both serve the full site, and neither redirects to the other. Outside links are split between them: GitHub, the spacelink docs and the YC Launch post point to cascade.space, while the YC company profile lists cascadespace.com. Neither domain has a sitemap.xml or a robots.txt. A seed-stage company has few inbound links, and right now they are divided across two copies of the same site.

    Medium impactLow effort First result in 1 month CTO

    First action

    Decide the primary domain and add the redirect rule.

    How to measure it

    Pages indexed on the secondary domain

    Now
    –
    Target
    0
    By
    30 days

    Steps

    1. 1

      Choose

      Pick the primary domain, preferably matching email and GitHub.

      CEO (co-founder) 1 hour

    2. 2

      Redirect

      301 every path on the other domain.

      CTO (co-founder) 2 hours

    3. 3

      Canonicals

      Self-referencing canonical on every page.

      CTO (co-founder) 2 hours

    4. 4

      Sitemap and robots

      Generated from the Next.js routes.

      CTO (co-founder) 2 hours

    5. 5

      Search Console

      Verify both domains, submit the sitemap, and record the change of address.

      CTO (co-founder) 1 hour

    6. 6

      Update profiles

      YC, LinkedIn, X, GitHub and PyPI links.

      Executive Assistant 1 day

    First result
    1 month
    Cost
    $0
    Owner
    CTO (co founder)

    Smallest test

    Redirect the secondary domain's homepage today and watch Search Console for a week.

    Why it works

    Pick one primary domain (cascade.space matches the email addresses and GitHub) and 301-redirect every path on the other domain to it at the edge. Set self-referencing canonical tags, generate sitemap.xml and robots.txt from Next.js, and submit both domains in Search Console. Then update the YC profile, social bios and the PyPI project links so they all point to the primary domain.

    One domain gathers all the links, the brand searches and the AI-assistant citations, so the company's own name stops competing with itself.

    Risks and how to handle them

    • Short-term ranking wobble

      Use permanent redirects for every path, not just the homepage.

    Evidence

    • Your websiteSite checks (November 9, 2026): /contact/, /sitemap.xml and /robots.txt return 404; the only email address on the site is [email removed]; cascade.space serves the same site without redirecting to cascadespace.com, and the GitHub repo, spacelink docs and YC Launch post link to cascade.space while the YC company profile lists cascadespace.com; page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"); the News page has one post, "Seed Round Announcement" (July 24, 2025).Source
    • Open sourcespacelink on GitHub: MIT licence, 56 stars, 9 forks, installable with pip install spacelink (docs at version 0.1.12); the README and docs link to cascade.space but do not mention Designer.Source
    • Y CombinatorYC company profile: "Cascade Space is building the commercial alternative to the Deep Space Network." Its first ground station, Earth Station Zero, is expected to downlink lunar data in 2026, with a global network planned by 2028; team size 7; Spring 2025 batch.Source
  • 05

    The site is very fast (PageSpeed 99 on mobile, CLS 0), so the only issues left are basic ones. Page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"), PageSpeed flags "Links do not have descriptive text" (the "Learn More" buttons), and headings are out of order.

    Low impactLow effort First result in 2 weeks CTO

    First action

    Rewrite the homepage, Array and Designer titles.

    How to measure it

    SEO score

    Now
    –
    Target
    100
    By
    30 days

    Steps

    1. 1

      Rewrite titles

      One brand mention, page purpose first.

      CEO (co-founder) 1 hour

    2. 2

      Fix the title template

      Remove the duplicated suffix.

      CTO (co-founder) 1 hour

    3. 3

      Rename links

      Descriptive text instead of "Learn More".

      CTO (co-founder) 1 hour

    4. 4

      Fix headings

      Sequential heading levels.

      CTO (co-founder) 1 hour

    5. 5

      Write descriptions

      A meta description for every page.

      CEO (co-founder) 2 hours

    6. 6

      Re-test

      Run PageSpeed again.

      CTO (co-founder) 15 minutes

    First result
    2 weeks
    Cost
    $0
    Owner
    CTO (co founder)

    Smallest test

    Fix the title template today.

    Why it works

    Rewrite each title to lead with what the page offers (for example "Cascade Array: commercial deep space ground network | Cascade Space"). Change "Learn More" to "See the Array" and "Try Designer", fix the heading levels, and write a meta description for every page.

    Titles and link text are what search results, link previews and AI summaries quote, so clearer wording helps every page get clicked.

    Risks and how to handle them

    • Little traffic to measure

      Track impressions in Search Console rather than clicks at first.

    Evidence

    • PageSpeedGoogle PageSpeed (November 9, 2026), homepage: performance 99 on mobile and 97 on desktop, mobile LCP 1.1s, CLS 0; accessibility 98 (headings not in order); SEO 91 ("Links do not have descriptive text"); no real-visitor data yet.Source
    • Your websiteSite checks (November 9, 2026): /contact/, /sitemap.xml and /robots.txt return 404; the only email address on the site is [email removed]; cascade.space serves the same site without redirecting to cascadespace.com, and the GitHub repo, spacelink docs and YC Launch post link to cascade.space while the YC company profile lists cascadespace.com; page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"); the News page has one post, "Seed Round Announcement" (July 24, 2025).Source
  • 06

    spacelink is MIT-licensed, pip-installable, and has 56 stars and 9 forks, and Designer is built on it. Yet neither the README nor the docs mention Designer. Anyone who installs a link-budget library is exactly the engineer Designer is built for.

    Medium impactLow effort First result in 1 month Principal Communication Syste…

    First action

    Add the Designer section to the README.

    How to measure it

    Share of sign-ups from open source

    Now
    –
    Target
    15%
    By
    90 days

    Steps

    1. 1

      README section

      What Designer adds on top of spacelink.

      Principal Communication Systems Engineer 1 hour

    2. 2

      Docs banner

      On every docs page.

      Principal Communication Systems Engineer 2 hours

    3. 3

      Notebook endings

      "Open this budget in Designer" cell.

      Lead Communication Systems Engineer 1 day

    4. 4

      Tag links

      Source tags for GitHub, docs and PyPI.

      CTO (co-founder) 1 hour

    5. 5

      PyPI links

      Add Designer and the primary domain.

      Principal Communication Systems Engineer 1 hour

    6. 6

      Measure

      Sign-ups by source.

      CEO (co-founder) monthly

    First result
    1 month
    Cost
    $0
    Owner
    Principal Communication Systems Engineer

    Smallest test

    Add the README section and count tagged visits for a month.

    Why it works

    Add a README section, "Want a visual editor and team sharing? Try Cascade Designer", plus a docs banner and a final cell in every example notebook that opens the same budget in Designer. Tag each link so sign-ups from open source can be counted, and add Designer to the PyPI project links.

    Open-source users already trust the math. A visual editor, sharing and Cascade Array modeling are a natural next step for them, not a cold pitch.

    Risks and how to handle them

    • Contributors see it as upselling

      Keep the library fully usable on its own and keep the link to one line.

    Evidence

    • Open sourcespacelink on GitHub: MIT licence, 56 stars, 9 forks, installable with pip install spacelink (docs at version 0.1.12); the README and docs link to cascade.space but do not mention Designer.Source
    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • PressSeed round announcement (July 24, 2025): $5.9 million from investors including Y Combinator, Nova Threshold and Undeterred Capital, to accelerate Cascade Designer; spacelink released as open source; the team includes engineers with SpaceX and Astra experience; the CEO: "Communication system design, test, and operation is a major bottleneck for space companies".Source

This quarter 12

The core plays for the next three months.

  • 07

    The homepage promises "dynamic aperture size and pricing", and Designer already models the Array with pricing per configuration, but the Array page shows no prices at all. Small lunar missions set their comms budget early, and without a number Cascade can't make the shortlist.

    High impactMedium effort First result in 1 month CEO

    First action

    Take the prices Designer already uses and agree which to publish.

    How to measure it

    Budget-qualified reservations

    Now
    –
    Target
    70% of reservations
    By
    90 days

    Steps

    1. 1

      Agree units

      Per pass or per minute, by configuration.

      CEO (co-founder) 2 days

    2. 2

      Set ranges

      Indicative 2027 starting prices.

      CEO (co-founder) 3 days

    3. 3

      Worked example

      One lunar mission across its phases.

      Lead Communication Systems Engineer 2 days

    4. 4

      Publish

      A price row under the performance table.

      CTO (co-founder) 1 day

    5. 5

      Link to Designer

      An exact quote from the mission's own design.

      CTO (co-founder) 1 day

    6. 6

      Review

      Reservation quality before and after.

      CEO (co-founder) monthly

    First result
    1 month
    Cost
    Founder time
    Owner
    CEO (co founder)

    Smallest test

    Add one line, "Lunar missions from $X per pass", and watch reservations.

    Why it works

    Show an indicative starting price for each configuration (per pass, or per minute of contact), with what is included (tracking, ranging, data delivery) and one worked example for a typical lunar mission. Mark the prices indicative for 2027 and link to Designer for an exact figure.

    A price anchor qualifies buyers before the first call and makes the dynamic-aperture story concrete: pay for Deep+ only during the phases that need it.

    Risks and how to handle them

    • Locked into early prices

      Label them indicative and dated.

    • Competitors see the prices

      Publish starting prices only; keep volume terms for quotes.

    Evidence

    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
    • Your websiteHomepage (checked November 9, 2026): H1 "Your Signal. Our Mission." and "New Capacity coming online in 2027"; it says the Deep Space Network is oversubscribed and unavailable for commercial missions and that commercial alternatives are limited, fragmented and unreliable; it argues an array of smaller dishes is cheaper to build and more reliable than one large dish, with dynamic aperture size and pricing; two products, Array and Designer; a newsletter signup; no customers, testimonials, prices, email address or phone number.Source
  • 08

    Designer is where an engineer learns their actual margin against the Cascade Array, so that is the moment of intent. But the reservation lives on a marketing page, so the design and the reservation never meet.

    High impactMedium effort First result in 1 quarter CTO

    First action

    Count how many current Designer projects include a Cascade Array node.

    How to measure it

    Design-to-reservation rate

    Now
    –
    Target
    10%
    By
    2 quarters

    Steps

    1. 1

      Count

      Projects that model the Array today.

      CTO (co-founder) 1 day

    2. 2

      Design the prompt

      Shown only when the margin closes.

      CTO (co-founder) 2 days

    3. 3

      Build

      Send the checkpoint, configuration and dates to the founders.

      CTO (co-founder) 2 weeks

    4. 4

      Digest

      Weekly list of designs using the Array.

      CTO (co-founder) 2 days

    5. 5

      Follow up

      Engineer-to-engineer reply within a day.

      Lead Communication Systems Engineer ongoing

    6. 6

      Measure

      Rate by configuration and band.

      CEO (co-founder) monthly

    First result
    1 quarter
    Cost
    About three weeks of engineering time
    Owner
    CTO (co founder)

    Smallest test

    Email the owners of projects that already model the Array and ask if they want to reserve.

    Why it works

    When a design includes a Cascade Array ground node and its margin is positive, show a "Reserve this configuration" button. It sends the founders the design checkpoint, the configuration, the band and the mission dates. Add a weekly internal digest of every design that uses the Array.

    The reservation then arrives with a validated link budget attached, and the digest shows which configurations and dates demand is building around.

    Risks and how to handle them

    • Users feel watched

      State in Designer's terms that Array designs may prompt a reservation, and make the button opt-in.

    Builds on

    Evidence

    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
  • 09

    A third-party AI brand profile describes Cascade Space as a low-Earth-orbit broadband constellation aimed at the Space Force and DoD, with no mention of lunar or deep space. The company used to be called Heliosphere Network, runs two domains, and has published a single news post, so AI assistants have very little first-party text to learn the right story from.

    Medium impactLow effort First result in 2 months CEO

    First action

    Ask three major assistants "what does Cascade Space do?" and save the answers.

    How to measure it

    Correct answers to five test questions

    Now
    –
    Target
    5 of 5
    By
    90 days

    Steps

    1. 1

      Baseline

      Five questions across major assistants and search.

      CEO (co-founder) 1 hour

    2. 2

      Write the facts

      What we are, what we're not, former name.

      CEO (co-founder) 2 hours

    3. 3

      Add structured data

      Organization and FAQ markup.

      CTO (co-founder) 2 hours

    4. 4

      Request corrections

      Profile sites with the wrong description.

      Executive Assistant 1 day

    5. 5

      Align profiles

      LinkedIn, X, YC and GitHub use one description.

      Executive Assistant 1 day

    6. 6

      Re-check

      The same five questions.

      CEO (co-founder) monthly

    First result
    2 months
    Cost
    $0
    Owner
    CEO (co founder)

    Smallest test

    Publish the facts block and re-ask the five questions in a month.

    Why it works

    Add a short facts block to /about: what Cascade is and is not, its former name, its products, the roadmap and locations. Add Organization structured data with sameAs links to LinkedIn, X, GitHub and YC, and an FAQ that answers "commercial alternative to the Deep Space Network" questions. Ask the profile site for a correction, and each month check what the major assistants say in answer to five test questions.

    Engineers increasingly ask assistants for a shortlist. A clear, consistent first-party description is what assistants and search engines quote back.

    Risks and how to handle them

    • Assistants update slowly

      Keep the same wording everywhere so every source agrees.

    Builds on

    Evidence

    • AI and searchA third-party AI brand profile says "Cascade Space is building low-Earth orbit satellite communications infrastructure", describing a LEO broadband constellation aimed at the U.S. Space Force and DoD, with no mention of lunar or deep space.Source
    • PressVia Satellite (July 25, 2025): Cascade Space, formerly Heliosphere Network, plans a ground station network for lunar missions and an online design tool; the CEO previously architected the Crew Dragon communication system at SpaceX.Source
    • Your websiteSite checks (November 9, 2026): /contact/, /sitemap.xml and /robots.txt return 404; the only email address on the site is [email removed]; cascade.space serves the same site without redirecting to cascadespace.com, and the GitHub repo, spacelink docs and YC Launch post link to cascade.space while the YC company profile lists cascadespace.com; page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"); the News page has one post, "Seed Round Announcement" (July 24, 2025).Source
  • 10

    The News page has a single post, the seed announcement from July 2025, while the Array roadmap lists a milestone almost every quarter through 2028 and YC says Earth Station Zero will downlink lunar data in 2026. A mission team that commits to a new network needs to see that the network is actually being built.

    Medium impactLow effort First result in 1 month CEO

    First action

    List the next four milestones and draft the first post's outline.

    How to measure it

    Milestone posts

    Now
    –
    Target
    1 a month
    By
    2 quarters

    Steps

    1. 1

      List milestones

      From the roadmap.

      CEO (co-founder) 1 hour

    2. 2

      Capture

      Photos, video and measured numbers at each step.

      Senior Mechanical Engineer ongoing

    3. 3

      Write

      A 300-word post with one chart.

      CEO (co-founder) 2 hours each

    4. 4

      Check numbers

      Measured against the published table.

      Principal Communication Systems Engineer 1 hour each

    5. 5

      Share

      LinkedIn, X and the newsletter.

      Executive Assistant 1 hour each

    6. 6

      Track

      Reservations the week after.

      CEO (co-founder) monthly

    First result
    1 month
    Cost
    Founder time
    Owner
    CEO (co founder)

    Smallest test

    Publish one post with photos of the current build.

    Why it works

    Publish a short post for each milestone: site chosen, first dish installed, first signal received, measured G/T against the published table, first spacecraft tracked, and Lunar+ transmit. Give each post photos, the measured numbers and a one-minute video, and share it on LinkedIn, X and in the newsletter.

    Measured performance against the published table is the strongest proof Cascade can give before it has customer case studies, and every post gives prospects and investors something to forward.

    Risks and how to handle them

    • A milestone slips publicly

      Post what happened and the new date; honest updates build trust.

    Evidence

    • Your websiteSite checks (November 9, 2026): /contact/, /sitemap.xml and /robots.txt return 404; the only email address on the site is [email removed]; cascade.space serves the same site without redirecting to cascadespace.com, and the GitHub repo, spacelink docs and YC Launch post link to cascade.space while the YC company profile lists cascadespace.com; page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"); the News page has one post, "Seed Round Announcement" (July 24, 2025).Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
    • Y CombinatorYC company profile: "Cascade Space is building the commercial alternative to the Deep Space Network." Its first ground station, Earth Station Zero, is expected to downlink lunar data in 2026, with a global network planned by 2028; team size 7; Spring 2025 batch.Source
  • 11

    Every page asks visitors to subscribe to the newsletter, but the site shows only one news post. Meanwhile the open Senior Mechanical Engineer role will own "field deployment, installation, and commissioning of the first array": integrating vendor dishes with in-house RF hardware, outdoor packaging, thermal design and calibration. That is exactly the story prospects, investors and future hires want to follow.

    Medium impactLow effort First result in 1 month CEO

    First action

    Write the first issue from the current state of the build.

    How to measure it

    Subscribers

    Now
    –
    Target
    +50% in two quarters
    By
    2 quarters

    Steps

    1. 1

      Set the format

      Five short sections, one photo, one number.

      CEO (co-founder) 1 hour

    2. 2

      Rotate authors

      RF, mechanical and systems engineers in turn.

      CEO (co-founder) monthly

    3. 3

      Write from the field

      Install and test notes.

      Senior Mechanical Engineer monthly

    4. 4

      Add RF results

      One measured number per issue.

      Senior RF Hardware Engineer monthly

    5. 5

      Archive

      Each issue becomes a page on the site.

      CTO (co-founder) 1 hour each

    6. 6

      Measure

      Opens, replies and reservations.

      Executive Assistant monthly

    First result
    1 month
    Cost
    Two hours of engineer time a month
    Owner
    CEO (co founder)

    Smallest test

    Send one build-log issue and compare its open rate with past sends.

    Why it works

    Send one issue a month, written by the engineers: what was installed, a test result, a photo, one problem solved and one open question for readers. Archive each issue on the site and repost it on LinkedIn, and end every issue with the link check and the reservation form.

    Subscribers stay warm through the long months before service starts, engineering detail earns trust with technical buyers, and the same issues double as recruiting material.

    Risks and how to handle them

    • Export-sensitive detail

      Have the CTO review each issue before it is sent.

    Evidence

    • Your websiteHomepage (checked November 9, 2026): H1 "Your Signal. Our Mission." and "New Capacity coming online in 2027"; it says the Deep Space Network is oversubscribed and unavailable for commercial missions and that commercial alternatives are limited, fragmented and unreliable; it argues an array of smaller dishes is cheaper to build and more reliable than one large dish, with dynamic aperture size and pricing; two products, Array and Designer; a newsletter signup; no customers, testimonials, prices, email address or phone number.Source
    • HiringSenior Mechanical Engineer (San Francisco, on-site, $150k-$190k plus equity), described as the first mechanical engineering hire: integrate vendor-supplied dishes with in-house RF hardware, package ultra-low-noise RF systems for harsh outdoor conditions, support calibration, and own "field deployment, installation, and commissioning of the first array", which combines dishes into one aperture "comparable to a NASA Deep Space Network 34 meter dish". Radio astronomy experience is a bonus; applications go by email; U.S. Persons only.Source
    • Your websiteSite checks (November 9, 2026): /contact/, /sitemap.xml and /robots.txt return 404; the only email address on the site is [email removed]; cascade.space serves the same site without redirecting to cascadespace.com, and the GitHub repo, spacelink docs and YC Launch post link to cascade.space while the YC company profile lists cascadespace.com; page titles repeat the brand ("Cascade Designer - Cascade Space | Cascade Space"); the News page has one post, "Seed Round Announcement" (July 24, 2025).Source
  • 12

    Goonhilly, KSAT and SSC each claim to be first or largest, and Cascade's homepage makes its array-versus-single-dish argument mainly through pictures. Engineers comparing providers have no neutral checklist to work from, and Cascade publishes more specs than most.

    Medium impactMedium effort First result in 2 months Lead Communication Systems En…

    First action

    Write down the ten criteria the team uses to judge a ground station.

    How to measure it

    Checklist downloads

    Now
    –
    Target
    50 a month
    By
    2 quarters

    Steps

    1. 1

      Set criteria

      Ten measurable criteria.

      Lead Communication Systems Engineer 1 day

    2. 2

      Gather public specs

      Only from providers' own published pages.

      Lead Communication Systems Engineer 1 week

    3. 3

      Write

      Explain each criterion, then compare.

      Lead Communication Systems Engineer 1 week

    4. 4

      Review claims

      Accuracy and fairness review.

      CEO (co-founder) 2 days

    5. 5

      Publish

      Guide plus downloadable checklist.

      CTO (co-founder) 1 day

    6. 6

      Refresh

      Re-date and re-check sources.

      Lead Communication Systems Engineer quarterly

    First result
    2 months
    Cost
    Engineer time
    Owner
    Lead Communication Systems Engineer

    Smallest test

    Publish the checklist alone and see whether engineers download it.

    Why it works

    Publish a guide built on the criteria engineers actually use: G/T and EIRP by band, availability and scheduling, ranging, locations and coverage, API access, and test support. Show Cascade's published table next to the public figures other providers give, with dated sources, and add a downloadable checklist.

    A buyer comparing providers is close to a decision, and a fair guide built on criteria where arrays do well (adjustable aperture, more dishes for redundancy) puts Cascade on the shortlist.

    Risks and how to handle them

    • Out-of-date or unfair claims about rivals

      Use only their own published figures, with dates and links.

    Evidence

    • Competitor researchRivals' own sites: Goonhilly calls itself "the world's first private deep space communications network", with a 32m antenna supporting deep-space and lunar missions and radio astronomy services on a 30m antenna; KSAT Lunar is "The world's first commercial lunar comms network"; SSC offers "one of the world's largest, most flexible and dependable ground station networks" and a lunar missions service.Source
    • Your websiteHomepage (checked November 9, 2026): H1 "Your Signal. Our Mission." and "New Capacity coming online in 2027"; it says the Deep Space Network is oversubscribed and unavailable for commercial missions and that commercial alternatives are limited, fragmented and unreliable; it argues an array of smaller dishes is cheaper to build and more reliable than one large dish, with dynamic aperture size and pricing; two products, Array and Designer; a newsletter signup; no customers, testimonials, prices, email address or phone number.Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
  • 13

    Designer's Catalog already includes parts from Plane Wave and Orbital Systems. Component vendors want their parts designed into missions, and their customers are exactly the spacecraft comms teams Cascade wants to reach.

    Medium impactLow effort First result in 2 months CEO

    First action

    Email both vendors with a draft "model it in Designer" page.

    How to measure it

    Vendor-referred sign-ups

    Now
    –
    Target
    20 a quarter
    By
    2 quarters

    Steps

    1. 1

      Draft pages

      One per vendor, with a sample budget.

      Lead Communication Systems Engineer 1 week

    2. 2

      Pitch vendors

      Joint page, datasheet link, webinar.

      CEO (co-founder) 2 weeks

    3. 3

      Run a webinar

      Designing a lunar link with their parts.

      Principal Communication Systems Engineer 1 day

    4. 4

      Open the Catalog

      A page where vendors apply.

      CTO (co-founder) 2 days

    5. 5

      Onboard vendors

      Pattern files and specs in the Catalog.

      Lead Communication Systems Engineer ongoing

    6. 6

      Measure

      Sign-ups by vendor source.

      CEO (co-founder) monthly

    First result
    2 months
    Cost
    Staff time only
    Owner
    CEO (co founder)

    Smallest test

    Publish one "model it in Designer" guide for one vendor's parts.

    Why it works

    Offer each vendor in the Catalog a page showing how to model a link with their parts in Designer, plus a joint webinar, and ask them to link to it from their datasheets. Add a "get your parts in the Catalog" page so more vendors can apply, with each new vendor bringing its own audience.

    Vendors reach the same engineers through their own channels, and the Catalog becomes a reason for both engineers and vendors to come to Designer.

    Risks and how to handle them

    • Vendors decline co-marketing

      Publish the modeling guides anyway; they are useful content on their own.

    Builds on

    Evidence

    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
  • 14

    Cascade's YC launch said the network would start by partnering with owners of unused dishes, and the Array roadmap needs a second location in Q2 2027 and a third in Q4 2027. Yet the site has no page inviting dish owners such as universities, observatories or telecom operators to take part.

    High impactMedium effort First result in 1 quarter CEO

    First action

    Write down the minimum specs a partner dish needs.

    How to measure it

    Partner site candidates

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      Define specs

      Diameter, bands, location, power, connectivity.

      Principal Communication Systems Engineer 2 days

    2. 2

      Set terms

      Revenue share or lease options.

      CEO (co-founder) 1 week

    3. 3

      Publish

      Page and application form.

      CTO (co-founder) 2 days

    4. 4

      List owners

      Known idle or under-used dishes.

      Executive Assistant 2 weeks

    5. 5

      Reach out

      Founder email with the page.

      CEO (co-founder) ongoing

    6. 6

      Site visits

      Mechanical and RF survey.

      Senior Mechanical Engineer per site

    First result
    1 quarter
    Cost
    Staff time and travel
    Owner
    CEO (co founder)

    Smallest test

    Email ten dish owners with a one-page offer.

    Why it works

    Publish a "Host a Cascade node" page listing what qualifies (dish diameter, bands, location, power, connectivity), what Cascade provides (RF backend, beamforming, operations) and how hosts earn (revenue share or lease), with a short application form. Contact known dish owners directly using the page as the pitch.

    A partner dish can bring a new location online faster and with less capital than a site Cascade builds itself, and it gives the network geographic spread for coverage.

    Risks and how to handle them

    • Old dishes need costly refurbishment

      Survey before committing; price refurbishment into the terms.

    Evidence

    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
    • HiringSenior Mechanical Engineer (San Francisco, on-site, $150k-$190k plus equity), described as the first mechanical engineering hire: integrate vendor-supplied dishes with in-house RF hardware, package ultra-low-noise RF systems for harsh outdoor conditions, support calibration, and own "field deployment, installation, and commissioning of the first array", which combines dishes into one aperture "comparable to a NASA Deep Space Network 34 meter dish". Radio astronomy experience is a bonus; applications go by email; U.S. Persons only.Source
  • 15

    Cascade's market can be counted: missions on public launch manifests that need ground support outside the Deep Space Network, which YC's launch post says is oversubscribed by 40%. Configurations reach the market one at a time (Lunar+ in Q1 2027, Deep+ in Q1 2028), so each mission's timing decides which configuration fits it.

    High impactMedium effort First result in 1 month CEO

    First action

    Build the list from public manifests and mission pages.

    How to measure it

    Mission conversations

    Now
    –
    Target
    15
    By
    1 quarter

    Steps

    1. 1

      Build the list

      Missions launching 2027-2028 that need lunar or deep space comms.

      Executive Assistant 2 weeks

    2. 2

      Add specs

      Public band and data-rate details.

      Lead Communication Systems Engineer 1 week

    3. 3

      Rank

      By roadmap fit and launch date.

      CEO (co-founder) 1 day

    4. 4

      Prefill checks

      One link check per mission.

      Lead Communication Systems Engineer 1 week

    5. 5

      Reach out

      Engineer-to-engineer email.

      CEO (co-founder) ongoing

    6. 6

      Track

      Replies, Designer projects, reservations.

      Executive Assistant weekly

    First result
    1 month
    Cost
    Staff time only
    Owner
    CEO (co founder)

    Smallest test

    Send five prefilled link checks and count the replies.

    Why it works

    Build one sheet of upcoming missions: operator, target, launch window, band, and current ground plan where it is public. Rank them by fit with the roadmap, then send each comms lead a short note with a prefilled link check based on their public specs, along with an invitation to model it in Designer.

    In a market this small, personal outreach that opens with the prospect's own link margin works better than broad marketing.

    Risks and how to handle them

    • Public specs are incomplete

      Say they are estimates and invite the team to correct them in Designer.

    Builds on

    Evidence

    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
    • Y CombinatorYC company profile: "Cascade Space is building the commercial alternative to the Deep Space Network." Its first ground station, Earth Station Zero, is expected to downlink lunar data in 2026, with a global network planned by 2028; team size 7; Spring 2025 batch.Source
  • 16

    spacelink is open source, and Designer is pitched as the replacement for link-budget spreadsheets. University CubeSat and lunar teams build link budgets every year, and their students go on to become the engineers at mission companies.

    Medium impactLow effort First result in 1 quarter Lead Communication Systems En…

    First action

    Write the education plan terms and the lab template.

    How to measure it

    Active university teams

    Now
    –
    Target
    15
    By
    2 quarters

    Steps

    1. 1

      Set terms

      Free team seats for verified programs.

      CEO (co-founder) 1 day

    2. 2

      Build the template

      A CubeSat and a lunar link budget.

      Lead Communication Systems Engineer 1 week

    3. 3

      Write the tutorial

      One hour, from datasheet to margin.

      Lead Communication Systems Engineer 1 week

    4. 4

      Reach programs

      Email faculty advisors.

      Executive Assistant 2 weeks

    5. 5

      Run the challenge

      Yearly, judged by the team.

      Principal Communication Systems Engineer yearly

    6. 6

      Track

      Teams, citations, hires.

      CEO (co-founder) quarterly

    First result
    1 quarter
    Cost
    Hosting costs and staff time
    Owner
    Lead Communication Systems Engineer

    Smallest test

    Offer seats to three university programs.

    Why it works

    Offer free team seats to university spacecraft programs, with a lab template, a short tutorial and a yearly student challenge (close a lunar link with the smallest spacecraft budget). Ask teams to cite Designer or spacelink in their papers and theses.

    It builds familiarity with Designer and Cascade's network a generation early, and it produces citations, content and recruits at little cost.

    Risks and how to handle them

    • Support load from students

      Route questions to a community forum and office hours.

    Builds on

    Evidence

    • Open sourcespacelink on GitHub: MIT licence, 56 stars, 9 forks, installable with pip install spacelink (docs at version 0.1.12); the README and docs link to cascade.space but do not mention Designer.Source
    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
  • 17

    The Designer page shows a Python example for uploading a trajectory CSV through the API, but there is no documentation behind it. The YC launch also promises an Operate API to schedule passes, track spacecraft and stream data, which flight software teams will want to review before they commit to a network.

    Medium impactMedium effort First result in 1 quarter CTO

    First action

    Turn the existing Python example into a docs page with a working sandbox key flow.

    How to measure it

    API-active teams

    Now
    –
    Target
    10
    By
    2 quarters

    Steps

    1. 1

      Document Designer API

      Auth, endpoints, limits, errors.

      CTO (co-founder) 2 weeks

    2. 2

      Add notebooks

      Trajectory analysis end to end.

      Lead Communication Systems Engineer 1 week

    3. 3

      Sandbox

      Test accounts with sample data.

      CTO (co-founder) 1 week

    4. 4

      Draft Operate spec

      Passes, tracking, streams, recordings.

      CTO (co-founder) 2 weeks

    5. 5

      Invite comments

      From teams on the mission list.

      CEO (co-founder) ongoing

    6. 6

      Measure

      First calls and active teams.

      CTO (co-founder) monthly

    First result
    1 quarter
    Cost
    About four weeks of engineering time
    Owner
    CTO (co founder)

    Smallest test

    Publish the Designer API page alone and count sandbox sign-ups.

    Why it works

    Publish a /docs section covering authentication, the trajectory analysis endpoint, limits, error codes, notebook examples and a sandbox. Add a preview spec of the Operate API (passes, tracking, data streams, recordings) and invite comments from mission teams.

    Software teams judge a ground provider partly by how easy it is to integrate, and an early public spec gathers requirements from future customers while the API is still being built.

    Risks and how to handle them

    • The Operate API changes after publishing

      Label it a preview and version it from the start.

    Evidence

    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
  • 18

    The Senior Mechanical Engineer role is the company's first mechanical hire and owns commissioning of the first array, so time-to-hire is a risk to the roadmap. The role is listed only on Cascade's careers page and its YC profile, applications go by plain email, and eligibility is limited to U.S. Persons, which narrows the pool further.

    Medium impactLow effort First result in 2 weeks CEO

    First action

    Add JobPosting markup and post the role on two space-industry boards.

    How to measure it

    Qualified applicants

    Now
    –
    Target
    15
    By
    6 weeks

    Steps

    1. 1

      Add markup

      JobPosting with salary and location.

      CTO (co-founder) 1 hour

    2. 2

      Post widely

      Space-industry boards and LinkedIn.

      Executive Assistant 1 day

    3. 3

      Film the build

      Two minutes on the hardware and site.

      Senior RF Hardware Engineer 1 day

    4. 4

      Ask for referrals

      Investors and the YC network.

      CEO (co-founder) 1 day

    5. 5

      Add a form

      Replace email-only applications.

      CTO (co-founder) 2 hours

    6. 6

      Track

      Applicants by source.

      Executive Assistant weekly

    First result
    2 weeks
    Cost
    Job board fees
    Owner
    CEO (co founder)

    Smallest test

    Post on one space-industry board this week and compare applicants with the careers page alone.

    Why it works

    Add JobPosting structured data with the salary range to the role page so it can show in job search results. Post it on space-industry and hardware job boards and LinkedIn, add a two-minute video of the hardware and the site, and ask investors and the YC network for referrals. Replace the email-only application with a short form so candidates can be tracked.

    Wider, richer listings reach the narrow pool of field-hardware engineers sooner, and every week saved on hiring brings the first-array milestone closer.

    Risks and how to handle them

    • Many unqualified applicants

      Put U.S. Persons and field-travel requirements in the first lines.

    Evidence

    • HiringSenior Mechanical Engineer (San Francisco, on-site, $150k-$190k plus equity), described as the first mechanical engineering hire: integrate vendor-supplied dishes with in-house RF hardware, package ultra-low-noise RF systems for harsh outdoor conditions, support calibration, and own "field deployment, installation, and commissioning of the first array", which combines dishes into one aperture "comparable to a NASA Deep Space Network 34 meter dish". Radio astronomy experience is a bonus; applications go by email; U.S. Persons only.Source
    • Y CombinatorYC company profile: "Cascade Space is building the commercial alternative to the Deep Space Network." Its first ground station, Earth Station Zero, is expected to downlink lunar data in 2026, with a global network planned by 2028; team size 7; Spring 2025 batch.Source

Big bets 3

Larger plays that can change the trajectory.

  • 19

    Lunar+ (S and X bands, transmit/receive and ranging) is on the roadmap for Q1 2027 and Deep+ for Q1 2028, and the site names no customers. Buyers hesitate to be first on a new network, while Cascade needs committed missions to prove demand and shape its build.

    High impactHigh effort First result in 1 quarter CEO

    First action

    Set the number of slots, the price and the deposit terms.

    How to measure it

    Founding customers

    Now
    –
    Target
    3
    By
    2 quarters

    Steps

    1. 1

      Design the offer

      Slots, price, deposit, inclusions.

      CEO (co-founder) 2 weeks

    2. 2

      Write terms

      Service levels and what happens if dates slip.

      CEO (co-founder) 2 weeks

    3. 3

      Publish

      A founding-customer section on the Array page.

      CTO (co-founder) 2 days

    4. 4

      Pitch

      To the top of the mission list.

      CEO (co-founder) ongoing

    5. 5

      Onboard

      Designer seat and a link review for each mission.

      Lead Communication Systems Engineer per mission

    6. 6

      Announce

      Each signing, with permission.

      CEO (co-founder) per signing

    First result
    1 quarter
    Cost
    Discounted early revenue
    Owner
    CEO (co founder)

    Smallest test

    Offer one founding slot to the three best-fit missions.

    Why it works

    Offer a small number of founding slots. Each includes guaranteed pass hours on Lunar+ at a founding price, a Designer team seat, early access to the test kit, and priority scheduling. In return the mission pays a deposit, provides feedback and grants the right to a public case study once it flies.

    Scarcity and a price advantage reward early commitment, deposits fund the build, and the first case studies answer the buyer's biggest question: who else trusts this network?

    Risks and how to handle them

    • Roadmap slips

      Include clear slip terms (refund or credit) so customers are protected.

    Builds on

    Evidence

    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
    • Y CombinatorYC company profile: "Cascade Space is building the commercial alternative to the Deep Space Network." Its first ground station, Earth Station Zero, is expected to downlink lunar data in 2026, with a global network planned by 2028; team size 7; Spring 2025 batch.Source
    • Your websiteHomepage (checked November 9, 2026): H1 "Your Signal. Our Mission." and "New Capacity coming online in 2027"; it says the Deep Space Network is oversubscribed and unavailable for commercial missions and that commercial alternatives are limited, fragmented and unreliable; it argues an array of smaller dishes is cheaper to build and more reliable than one large dish, with dynamic aperture size and pricing; two products, Array and Designer; a newsletter signup; no customers, testimonials, prices, email address or phone number.Source
  • 20

    Cascade's YC launch describes three stages, Design, Test and Operate, but the site sells Array and Designer separately and doesn't mention testing at all. Goonhilly, KSAT and SSC compete on network operations, while none of their homepages pitch a single partner that also covers design and test.

    High impactHigh effort First result in 2 quarters CEO

    First action

    Draft the package and a sample price schedule for one lunar mission.

    How to measure it

    Full-package contracts

    Now
    –
    Target
    2
    By
    3 quarters

    Steps

    1. 1

      Define the package

      What each phase includes.

      CEO (co-founder) 2 weeks

    2. 2

      Price by phase

      Aperture and hours per phase.

      CEO (co-founder) 2 weeks

    3. 3

      Write the test plan

      A standard end-to-end plan.

      Principal Communication Systems Engineer 3 weeks

    4. 4

      Build the page

      Missions page with a sample timeline.

      CTO (co-founder) 1 week

    5. 5

      Sell

      To founding customers first.

      CEO (co-founder) ongoing

    6. 6

      Review

      Margin by phase after the first mission.

      CEO (co-founder) per mission

    First result
    2 quarters
    Cost
    Staff time; test hardware costs
    Owner
    CEO (co founder)

    Smallest test

    Quote one mission both ways and see which it chooses.

    Why it works

    Package one contract per mission: Designer team seats during design, a test-kit loan and test plan before launch, and pass hours across the mission phases at the aperture each phase needs, all on one price schedule. Present it on a "Missions" page with a sample timeline.

    One partner from design to operations reduces risk at handoffs and lowers procurement effort for small teams, and it locks in the operations revenue during the design phase.

    Risks and how to handle them

    • Too complex for small missions

      Keep each part available on its own as well.

    Builds on

    Evidence

    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source
    • Competitor researchRivals' own sites: Goonhilly calls itself "the world's first private deep space communications network", with a 32m antenna supporting deep-space and lunar missions and radio astronomy services on a 30m antenna; KSAT Lunar is "The world's first commercial lunar comms network"; SSC offers "one of the world's largest, most flexible and dependable ground station networks" and a lunar missions service.Source
  • 21

    Cascade's YC launch describes a "ground station in a box", hardware identical to its ground stations, because end-to-end testing of spacecraft with ground hardware is often skipped as too expensive. The website never mentions it. A kit sitting in a customer's integration lab ties that mission to Cascade's network months before launch.

    High impactHigh effort First result in 2 quarters Senior RF Hardware Engineer

    First action

    Cost one kit built from the array's in-house RF hardware.

    How to measure it

    Kits rented

    Now
    –
    Target
    3
    By
    3 quarters

    Steps

    1. 1

      Spec the kit

      Same RF chain as the array.

      Senior RF Hardware Engineer 3 weeks

    2. 2

      Package it

      Rugged, shippable enclosure.

      Senior Mechanical Engineer 1 month

    3. 3

      Write the test plan

      Standard end-to-end procedure.

      Principal Communication Systems Engineer 2 weeks

    4. 4

      Link to Designer

      Measured results update the budget.

      CTO (co-founder) 3 weeks

    5. 5

      Price rentals

      Monthly, credited against passes.

      CEO (co-founder) 1 week

    6. 6

      Launch the page

      A "Test" page alongside Array and Designer.

      CTO (co-founder) 2 days

    First result
    2 quarters
    Cost
    Hardware per kit plus engineering time
    Owner
    Senior RF Hardware Engineer

    Smallest test

    Lend one prototype kit to a founding customer.

    Why it works

    Build a small fleet of test kits that match the array's RF chain. Rent them by the month with a standard end-to-end test plan, and have test results flow back into the mission's Designer project so the link budget reflects measured hardware. Add a "Test" page to the site.

    It solves a real, unmet problem that mission teams skip today, it earns revenue before the network is complete, and a mission that has tested against Cascade's hardware is most likely to fly with it.

    Risks and how to handle them

    • Pulls engineers away from the array build

      Build kits from the same production RF boards, after first-array commissioning.

    Evidence

    • Y CombinatorYC Launch post: NASA's Deep Space Network is oversubscribed by 40% and most commercial missions can't use it; comms design is done from datasheets, vendor calls and spreadsheets; the plan is Design (real-time performance against Cascade's network, cutting iteration "from weeks to hours"), Test (a "ground station in a box" identical to Cascade's ground hardware, because end-to-end testing is often skipped as cost-prohibitive) and Operate (an API to schedule passes, track spacecraft and stream data); the network starts by partnering with owners of unused dishes; "drop us a line".Source
    • HiringSenior Mechanical Engineer (San Francisco, on-site, $150k-$190k plus equity), described as the first mechanical engineering hire: integrate vendor-supplied dishes with in-house RF hardware, package ultra-low-noise RF systems for harsh outdoor conditions, support calibration, and own "field deployment, installation, and commissioning of the first array", which combines dishes into one aperture "comparable to a NASA Deep Space Network 34 meter dish". Radio astronomy experience is a bonus; applications go by email; U.S. Persons only.Source
    • Your websiteDesigner page (checked November 9, 2026): a drag-and-drop link-budget editor whose Catalog has parts "from suppliers such as Plane Wave and Orbital Systems", 3D antenna patterns, CCSDS demodulators that compute Eb/N0 and margin, Cascade Array modeling with pricing per configuration, team sharing, and an API for trajectory analysis shown with a Python example; "Designer is built on top of spacelink, our open source library for modeling space communications." The page ends with the heading "Schedule Your Demo" above a "Book Reservation" button, and does not say who can use Designer, whether it is free or what it costs.Source

Wildcards 1

Unexpected experiments, each with a cheap way to test it.

  • 22

    Goonhilly already sells radio astronomy services on a 30m antenna alongside its deep space work, and Cascade's own job post lists radio astronomy as bonus experience. An array whose aperture can be split up will have idle dishes between spacecraft passes, especially in the early years before demand fills the schedule.

    Medium impactMedium effort First result in 2 quarters CTO

    First action

    Estimate idle hours per week on the first array.

    How to measure it

    Booked science hours

    Now
    –
    Target
    40 hours a month
    By
    3 quarters

    Steps

    1. 1

      Estimate idle time

      Hours per week after spacecraft passes.

      CTO (co-founder) 1 day

    2. 2

      Check fit

      Bands and receivers useful for science.

      Principal Communication Systems Engineer 1 week

    3. 3

      Find a partner

      One university group.

      CEO (co-founder) 1 month

    4. 4

      Build booking

      Calendar with automatic stops for passes.

      CTO (co-founder) 2 weeks

    5. 5

      Deliver data

      Recordings and calibration notes.

      Senior RF Hardware Engineer per booking

    6. 6

      Publish

      Joint results and a news post.

      CEO (co-founder) per result

    First result
    2 quarters
    Cost
    Engineering time; little added hardware
    Owner
    CTO (co founder)

    Smallest test

    Offer one week of idle time to one university group.

    Why it works

    Pilot with one university radio astronomy group: book idle dish time through a simple calendar, deliver recorded data, and co-publish the results. Price it by the hour, with academic rates, and stop observations automatically when a spacecraft pass needs the dishes.

    It turns idle hours into revenue, gives the array scientific credibility and press, and opens relationships with universities that may later host dishes.

    Risks and how to handle them

    • Distraction from spacecraft customers

      Spacecraft passes always take priority, and science time is sold only as interruptible.

    Evidence

    • Competitor researchRivals' own sites: Goonhilly calls itself "the world's first private deep space communications network", with a 32m antenna supporting deep-space and lunar missions and radio astronomy services on a 30m antenna; KSAT Lunar is "The world's first commercial lunar comms network"; SSC offers "one of the world's largest, most flexible and dependable ground station networks" and a lunar missions service.Source
    • HiringSenior Mechanical Engineer (San Francisco, on-site, $150k-$190k plus equity), described as the first mechanical engineering hire: integrate vendor-supplied dishes with in-house RF hardware, package ultra-low-noise RF systems for harsh outdoor conditions, support calibration, and own "field deployment, installation, and commissioning of the first array", which combines dishes into one aperture "comparable to a NASA Deep Space Network 34 meter dish". Radio astronomy experience is a bonus; applications go by email; U.S. Persons only.Source
    • Your websiteArray page (checked November 9, 2026): roadmap Q4 2026 Mini array with S-band receive at a US location; Q1 2027 Lunar+ array with S and X bands, transmit/receive and ranging; a second location in Q2 2027 and a third in Q4 2027; Q1 2028 global coverage and Deep+ performance. A table gives G/T and EIRP for five configurations, Mini, Lunar, Lunar+, Deep and Deep+ (S-band G/T from 25.6 dB/K to 42.6 dB/K), and says "Dynamically select your performance level throughout your mission." No prices; the only action is "Reserve Your Spot Today" with a "Book Reservation" button.Source
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Synthetic growth strategyAn AI agent and rebuilt finance stack that runs the books, contracts, billing, invoicing and payments for software companies, producing…21 growth ideas
  • itD growth strategyA woman-owned technology consulting firm that helps enterprises become AI-ready: data foundations, AI governance, AI adoption and change…21 growth ideas
  • Luminary growth strategyAI software that turns estate planning and ownership documents into structured data, diagrams, analysis and client-ready reports, for the…21 growth ideas
  • CircleCI growth strategyA CI/CD platform repositioned around "autonomous validation for the AI era": cloud and self-hosted (Server) pipelines, Smarter Testing…22 growth ideas
  • Extend growth strategyAn AI post-purchase platform, "Shopper Operations", for retailers and brands: product protection, shipping protection, returns and…20 growth ideas
  • TFTPay growth strategyA SoftPOS app that turns a phone or any NFC-enabled device into a payment terminal: tap to charge, instant approval and a digital receipt…20 growth ideas
  • Stacket growth strategyA cloud warehouse management system for 3PLs and fulfillment centers: receiving, putaway, inventory by bin, picking, shipping, returns…22 growth ideas
  • EMBR growth strategyAn online store for durable, affordable wedding bands in tungsten, ceramic, Damascus steel, titanium and silicone, with matching couples…21 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on November 10, 2026, and cites them throughout. Cascade Space did not commission, review or endorse it, and Programmable is not affiliated with Cascade Space. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how Cascade Space runs its business.

Something wrong, or do you represent Cascade Space? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 306 ideas

    Link check on the Array page, a self-serve start for Designer, a contact path, one domain with a sitemap, clean titles, and links from spacelink to Designer.

  2. Days 31 to 609 ideas

    Starting prices, reserving from inside Designer, correcting the AI profile, milestone posts, the build-log newsletter, a provider guide, vendor co-marketing, API docs and recruiting.

  3. Days 61 to 907 ideas

    Dish-owner partners, the mission list, university seats, then the big bets: a launch-customer program, the Design-Test-Operate contract, rental test kits and idle-time sales.

The research behind the plan

3 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value ground capacity outside the oversubscribed Deep Space Network. The most cited problem: no access to the Deep Space Network for most commercial missions.

  • Design iteration in hours instead of weeks of spreadsheets
  • A patchwork of dish operators with different hardware and interfaces
  • In their words: “link budget”

Market

Competitive landscape

4 competitors compared: NASA Deep Space Network, Goonhilly, KSAT Lunar and SSC.

  • Gap to exploit: Commercial deep space capacity beyond lunar distance
  • NASA Deep Space Network: Oversubscribed and largely unavailable to commercial missions
  • Goonhilly: Single large dishes with a fixed aperture

Hiring signals

Cascade Space has one open role, and it shows the company moving from software into hardware.

  • Senior Mechanical Engineer: First mechanical hire to commission the first array. Ideas 10, 11, 14, 18, 21, 22.

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks first (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence