ProgrammableMarketing/smtllcgroup.com (opens in a new tab)
PDF

Views

  • Plan
  • Roadmap
  • Research

On this page

  • The brief
  • Start here
  • Idea portfolio
  • Effort vs impact
  • This week · 6
  • This quarter · 10
  • Big bets · 3
  • Wildcards · 3
  • How we can help
Generated Oct 21, 2026
  1. Programmable
  2. Playbooks
  3. SMT LLC Group
SMT LLC Group logo

growth playbook · Oct 21, 2026

smtllcgroup.com (opens in a new tab)

SMT LLC Group growth playbook

Diagnosis

SMT has the credentials buyers look for (IATF 16949, ISO 9001 and 14001, IPC/WHMA-A-620 staff, AS9102C, a CAGE code and AS9100 on the way) and 35 years of production, but its website works against it. The quote form does not send, the page takes over ten seconds to appear on a phone because images are embedded as text, everything is on one page, and directories still describe an older business.

This playbook fixes the form, speed, search basics and email first, then builds capability, aerospace and EV pages, a line card, reps, case studies and scorecards, and bets on AS9100, a quick-turn prototype lane and kanban programs.

Growth Score

4/10

Biggest Opportunity

Turn strong certifications and 100% testing into visible proof, starting with a quote form that works, so new aerospace, EV and Tier 1 buyers can find SMT and ask for a quote.

Biggest Risk

Buyers who cannot send an RFQ or load the page move to the next harness supplier on their list, and larger interconnect suppliers such as NAI win the searches SMT does not appear in.

01

Start here

The three moves to make first. Each one is written up in full below.

  1. 1

    Make the "Send Request" quote form actually send, and let buyers attach drawings

    Press "Send Request" yourself, confirm nothing arrives, then connect the form to an email handler.

    High impact First result in 1 week
  2. 2

    Cut the homepage from 10.8 seconds to under 3 by moving embedded images into files

    Export the logo as a small SVG or PNG and replace the three embedded copies.

    High impact First result in 1 week
  3. 3

    Fix the search basics: description, share image, favicon, https redirect and the © 2025 footer

    Write the meta description.

    Medium impact First result in 2 weeks

02

Your idea portfolio

22 ideas, grouped by when to run them. Open any idea for how to run it: the steps, who to approach, copy you can use, and how to measure it.

  • 6 ideas are marked Unexpected: plays you are unlikely to have tried.

    2 of these are things Programmable can build and run for you.

Every idea placed by the effort it takes against the impact it could have. Quick wins sit top left; select a number to open that idea. The filters below narrow the list by status, timing, category and what Programmable can build.

Effort vs impactEach number is an idea. Select one to open it.
Impact →
Quick wins · 4Big bets · 7Fill-ins · 7Reconsider · 4
Effort →

Showing 22 of 22 ideas

This week 6

Quick wins with a clear first action.

  • 01

    The quote form at the bottom of smtllcgroup.com looks complete (name, company, phone, email, project details) but the page has no form element and no script behind the button, so a buyer who fills it in and presses "Send Request" sends nothing and gets no message. For a contract manufacturer, that form is the front door for new programs.

    High impactLow effort First result in 1 week Website developer

    First action

    Press "Send Request" yourself, confirm nothing arrives, then connect the form to an email handler.

    How to measure it

    Website RFQs

    Now
    –
    Target
    4 a month
    By
    60 days

    Steps

    1. 1

      Confirm the problem

      Submit a test request and check the inbox and spam.

      General Manager 15 minutes

    2. 2

      Pick a handler

      Form service or server script that emails smtinfo@ and keeps a log.

      Website developer (contract) 1 hour

    3. 3

      Add quote fields

      Drawing/BOM upload, quantity, annual usage, target date, industry.

      Website developer (contract) 2 hours

    4. 4

      Confirmation

      On-page thank-you with "reply within one business day" and a copy to the buyer.

      Website developer (contract) 1 hour

    5. 5

      Spam protection

      A hidden honeypot field or invisible challenge.

      Website developer (contract) 30 minutes

    6. 6

      Route and own

      Name who answers RFQs and the backup when they are out.

      General Manager 1 day

    7. 7

      Test monthly

      A test submission on the first of each month.

      Operations Manager monthly

    First result
    1 week
    Cost
    Under $20 a month for a form service
    Owner
    Website developer (contract)

    Smallest test

    Connect the existing six fields to email today and add uploads next week.

    Why it works

    Connect the form to a real handler (a simple form service or a small server script) that emails smtinfo@ and logs each request, shows a confirmation with the expected reply time, and sends the buyer a copy. Add the fields a harness quote needs: drawing or BOM upload, quantity, annual usage, target date and industry. Test it from a phone and a company network, then check it weekly.

    Engineers and buyers sending RFQs expect an answer within a day; a silent form loses the request and the buyer usually moves to the next supplier on their list without calling.

    Ready to use

    ChecklistRFQ form fields for wire harness quotes

    [ ] Name, company, email, phone
    [ ] Drawing / BOM upload (PDF, DWG, STEP, XLSX)
    [ ] Prototype quantity and annual usage (EAU)
    [ ] Connector / terminal brands if specified
    [ ] Industry (automotive, aerospace, EV, industrial)
    [ ] Required certifications (IATF, AS9102 FAI, IPC class)
    [ ] Target quote date and first delivery date
    [ ] Confirmation page with reply time
    [ ] Copy emailed to the buyer

    Risks and how to handle them

    • Spam floods the inbox

      Honeypot field and a file-type limit on uploads.

    • Large drawing files

      Allow up to 25 MB or offer a secure upload link in the reply.

    Evidence

    • Your websiteThe "Get In Touch" quote form has First Name, Last Name, Company, Phone, Email and Project Details fields and a "Send Request" button, but the page has no form element and its only script handles scroll effects, the menu background and anchor links, so pressing "Send Request" sends nothing. There is no way to attach a drawing or bill of materials. Checked October 20, 2026.Source
    • Your websiteContact details: 2768 Golfview Drive, Naperville; main line (630) 961-3000; [email protected]; hours Monday to Friday 8:00 AM to 5:00 PM CT; the General Manager's direct email. robots.txt asks crawlers to wait 30 seconds between requests.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
  • 02

    Google's phone test shows nothing for 9.9 seconds and the main content at 10.8 seconds. The cause is unusual: seven images are pasted into the HTML as text, making the page about 2.7 MB, and the same 500 KB logo is embedded three times. Browsers cannot cache or compress these the way they handle normal image files.

    High impactLow effort First result in 1 week Website developer

    First action

    Export the logo as a small SVG or PNG and replace the three embedded copies.

    How to measure it

    Mobile LCP

    Now
    –
    Target
    under 2.5 s
    By
    30 days

    Steps

    1. 1

      Extract images

      Save the seven embedded images as files.

      Website developer (contract) 1 hour

    2. 2

      Resize and convert

      WebP at display size; SVG for the logo.

      Website developer (contract) 1 hour

    3. 3

      Replace references

      One logo file used in header, hero and footer.

      Website developer (contract) 30 minutes

    4. 4

      Lazy-load

      Images below the first screen.

      Website developer (contract) 30 minutes

    5. 5

      Enable compression and caching

      Gzip/Brotli and cache headers on nginx.

      Website developer (contract) 1 hour

    6. 6

      Retest

      PageSpeed mobile before and after.

      Website developer (contract) 15 minutes

    First result
    1 week
    Cost
    $0 to a few hours of developer time
    Owner
    Website developer (contract)

    Smallest test

    Replace only the logo and retest; that alone removes about 1.5 MB.

    Why it works

    Export each embedded image as a real file, convert to WebP at the size it is shown (the logo needs a few kilobytes, not 500), reference the logo once and let the browser cache it, and lazy-load images below the first screen. Re-run PageSpeed and keep the result on file.

    A buyer opening the site from a link on a phone will leave long before ten seconds; a light page also loads faster for search engines and makes the quote form reachable.

    Risks and how to handle them

    • Images look worse

      Compare side by side before publishing.

    Evidence

    • Your websiteThe homepage HTML is about 2.7 MB because seven images are embedded inside the page as base64 text instead of image files; the same logo image of about 500 KB is embedded three times (header, hero and footer).Source
    • Google PageSpeedHomepage on mobile (October 20, 2026): performance 56/100; nothing appears for 9.9 seconds (first contentful paint) and the main content takes 10.8 seconds (target 2.5 s); the page transfers 1,709 KiB. Google has no real-visitor (Chrome UX Report) data for the site, which usually means low traffic.Source
  • 03

    The homepage has no meta description (so Google writes its own snippet), no share image for LinkedIn or email previews, no favicon, and http:// visitors are not redirected to the secure site. The footer still says © 2025, which buyers read as an unmaintained site.

    Medium impactLow effort First result in 2 weeks Website developer

    First action

    Write the meta description.

    How to measure it

    Google Search Console clicks

    Now
    –
    Target
    +30%
    By
    90 days

    Steps

    1. 1

      Meta description

      Under 155 characters with capabilities and location.

      Sales and Business Development Lead 30 minutes

    2. 2

      Share image

      1200x630 photo with the certifications line.

      Website developer (contract) 1 hour

    3. 3

      Favicon

      From the logo mark.

      Website developer (contract) 15 minutes

    4. 4

      https redirect

      nginx 301 from http to https.

      Website developer (contract) 15 minutes

    5. 5

      Footer year

      Generated automatically.

      Website developer (contract) 5 minutes

    6. 6

      Search Console

      Verify the site and submit it.

      Website developer (contract) 30 minutes

    First result
    2 weeks
    Cost
    $0
    Owner
    Website developer (contract)

    Smallest test

    Add the description and redirect today.

    Why it works

    Write a meta description that names wire harness and cable assembly manufacturing in Naperville with IATF 16949; add a share image of the production floor, a favicon from the logo, an http-to-https redirect and an automatic copyright year.

    These are the first things a buyer sees in search results and when a colleague forwards the link, and they take an hour to fix.

    Risks and how to handle them

    • Snippet ignored by Google

      Keep the H1 and description consistent.

    Evidence

    • Your websiteThe whole site is one page with anchor sections (About, Capabilities, Quality, Industries, Certifications, Contact); other paths such as /about, /capabilities and /sitemap.xml return an error (HTTP 406). The homepage has no meta description, social share image or favicon, the footer says "© 2025", and visitors who type http:// are not sent to the secure site.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
  • 04

    Quotes, first article reports and EDI follow-ups go out by email, but the domain has a neutral SPF record ("?all"), no DMARC and no DKIM. Large OEMs and Tier 1 suppliers filter mail without these, so a quote can land in spam.

    Medium impactLow effort First result in 1 month General Manager

    First action

    List every system that sends mail as smtllcgroup.com.

    How to measure it

    DMARC pass rate

    Now
    –
    Target
    98%
    By
    60 days

    Steps

    1. 1

      List senders

      Mail server, ERP, EDI, website form.

      Operations Manager 1 day

    2. 2

      DKIM

      Generate a key and publish it in DNS.

      Website developer (contract) 2 hours

    3. 3

      SPF

      Real senders and "~all".

      Website developer (contract) 30 minutes

    4. 4

      DMARC

      "p=none" with a reporting address.

      Website developer (contract) 30 minutes

    5. 5

      Read reports

      Weekly for a month.

      Operations Manager weekly

    6. 6

      Enforce

      Move to "quarantine".

      Website developer (contract) 1 month

    First result
    1 month
    Cost
    $0
    Owner
    General Manager

    Smallest test

    Publish a DMARC record at "p=none" and read the first report.

    Why it works

    Add DKIM signing on the mail server, tighten SPF to "~all" or "-all" with the real senders, and publish DMARC at "p=none" with reporting; after a month of clean reports move to "quarantine".

    A quote that never reaches the buyer is the same as no quote; mail authentication is now expected by corporate mail filters.

    Risks and how to handle them

    • Legitimate mail blocked

      Stay at "p=none" until every sender passes.

    Evidence

    • DNS checksmtllcgroup.com email: an SPF record ending in "?all" (neutral), no DMARC record and no DKIM key found; mail is self-hosted.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
  • 05

    ZoomInfo still describes SMT as a coil winding, injection molding and contract manufacturer; the website now leads with wire harness and cable fabrication. Buyers and sourcing tools read these profiles before they ever visit the site.

    Medium impactLow effort First result in 1 month Sales and Business Developmen…

    First action

    Write one 50-word description and paste it into ZoomInfo and LinkedIn.

    How to measure it

    Profiles with the current description

    Now
    –
    Target
    6
    By
    30 days

    Steps

    1. 1

      Write the description

      50 and 150 words.

      Sales and Business Development Lead 1 hour

    2. 2

      ZoomInfo

      Claim and update.

      Sales and Business Development Lead 1 hour

    3. 3

      Thomasnet

      Supplier profile with categories.

      Sales and Business Development Lead 2 hours

    4. 4

      LinkedIn

      About section and specialties.

      Sales and Business Development Lead 30 minutes

    5. 5

      Google Business Profile

      Category, hours, photos.

      Sales and Business Development Lead 1 hour

    6. 6

      Track

      Profile list reviewed every six months.

      Sales and Business Development Lead 6 months

    First result
    1 month
    Cost
    $0
    Owner
    Sales and Business Development Lead

    Smallest test

    Update the ZoomInfo and LinkedIn descriptions this week.

    Why it works

    Claim and update the profiles buyers use (ZoomInfo, Thomasnet, LinkedIn, Google Business Profile, D&B): the same one-line description, certifications, CAGE code, industries and website link. Keep a list of where each profile lives and review it twice a year.

    Sourcing teams build shortlists from these directories; a profile that describes a different business filters SMT out of harness searches.

    Risks and how to handle them

    • Paid upsells from directories

      Use free tiers first and measure leads.

    Evidence

    • Business directoriesZoomInfo describes SMT as a precision manufacturer of coil winding, injection molding and contract manufacturing for aerospace, automotive and military clients, with 51-200 employees; it does not lead with wire harnesses, which is how the website now positions the company.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Competitor researchRivals' own sites: NAI, "Global Leader in Custom Interconnect Solutions", designs and manufactures cable assemblies and harnesses; Consolidated Electronic Wire & Cable (Conwire, Franklin Park, IL) makes standard and custom electronic wire and cable. Directory searches for Naperville-area harness makers return few local results.Source
  • 06

    SMT supports DFM review from prototype to production, but the site never tells buyers what information it needs to quote. Incomplete RFQs cause back-and-forth that slows every quote.

    Medium impactLow effort First result in 1 month Sales and Business Developmen…

    First action

    Ask the engineer who quotes most often what is missing from typical RFQs.

    How to measure it

    Complete RFQs

    Now
    –
    Target
    70%
    By
    90 days

    Steps

    1. 1

      Gather gaps

      Common missing items.

      Engineering Manager 1 day

    2. 2

      Write checklist

      Eight items in buyer language.

      Sales and Business Development Lead 1 day

    3. 3

      Add to site

      Above the form.

      Website developer (contract) 1 hour

    4. 4

      DFM offer

      For incomplete drawings.

      Engineering Manager 1 day

    5. 5

      Use in replies

      Same checklist in email.

      Sales and Business Development Lead ongoing

    6. 6

      Measure

      Track complete vs incomplete RFQs.

      Sales and Business Development Lead monthly

    First result
    1 month
    Cost
    $0
    Owner
    Sales and Business Development Lead

    Smallest test

    Paste the checklist into the next RFQ reply you send.

    Why it works

    Add a short checklist above the form: drawing or wiring diagram, BOM with connector and terminal part numbers, wire gauges, quantities and annual usage, test and certification requirements, and target dates; offer a free DFM review when drawings are incomplete.

    Complete RFQs are quoted faster and with fewer surprises, and the free DFM review invites earlier conversations.

    Risks and how to handle them

    • Too many demands put buyers off

      Mark only drawing and quantity as required.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteThe "Get In Touch" quote form has First Name, Last Name, Company, Phone, Email and Project Details fields and a "Send Request" button, but the page has no form element and its only script handles scroll effects, the menu background and anchor links, so pressing "Send Request" sends nothing. There is no way to attach a drawing or bill of materials. Checked October 20, 2026.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source

This quarter 10

The core plays for the next three months.

  • 07

    Everything sits on one page, and every other path returns an error, so SMT can rank for at most one topic. Buyers search for specific things: "high voltage EV harness manufacturer", "AS9102 cable assembly supplier", "overmolded cable assemblies Illinois".

    High impactMedium effort First result in 1 quarter Website developer

    First action

    Write the EV high-voltage harness page first.

    How to measure it

    Organic sessions

    Now
    –
    Target
    300 a month
    By
    2 quarters

    Steps

    1. 1

      Pick pages

      Seven capability and industry pages.

      Sales and Business Development Lead 1 day

    2. 2

      Collect photos

      Shop floor and products per page.

      Operations Manager 2 weeks

    3. 3

      Write

      Specs, standards, applications.

      Engineering Manager 1 month

    4. 4

      Build

      Templates with the quote form.

      Website developer (contract) 2 weeks

    5. 5

      Sitemap

      Submit to Search Console.

      Website developer (contract) 1 hour

    6. 6

      Fix robots.txt

      Remove the 30-second crawl delay.

      Website developer (contract) 15 minutes

    7. 7

      Measure

      Queries and visits per page.

      Sales and Business Development Lead monthly

    First result
    1 quarter
    Cost
    Developer and writing time
    Owner
    Website developer (contract)

    Smallest test

    Publish one page and watch Search Console for a month.

    Why it works

    Build pages for wire harnesses, cable assemblies, electromechanical assembly, overmolding and insert molding, EV high-voltage harnesses, aerospace and defense, and automotive, each with photos, specifications, certifications and the quote form. Add a sitemap and submit it to Search Console.

    Specific pages match specific searches, and each one gives a buyer the proof they need for their industry.

    Risks and how to handle them

    • Thin pages

      At least 400 words and real photos per page.

    Evidence

    • Your websiteThe whole site is one page with anchor sections (About, Capabilities, Quality, Industries, Certifications, Contact); other paths such as /about, /capabilities and /sitemap.xml return an error (HTTP 406). The homepage has no meta description, social share image or favicon, the footer says "© 2025", and visitors who type http:// are not sent to the secure site.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Google PageSpeedHomepage on mobile (October 20, 2026): performance 56/100; nothing appears for 9.9 seconds (first contentful paint) and the main content takes 10.8 seconds (target 2.5 s); the page transfers 1,709 KiB. Google has no real-visitor (Chrome UX Report) data for the site, which usually means low traffic.Source
  • 08

    SMT is expanding into aerospace and defense: AS9102C compliant, CAGE code registered, AS9100 in progress and already on Embraer Phenom programs. That proof is a single tile on the homepage.

    High impactMedium effort First result in 1 quarter Sales and Business Developmen…

    First action

    Ask Embraer's program contact what can be said publicly.

    How to measure it

    Aerospace RFQs

    Now
    –
    Target
    3 a quarter
    By
    2 quarters

    Steps

    1. 1

      Clear the reference

      Approval for the Phenom mention.

      General Manager 2 weeks

    2. 2

      Write the page

      FAI, traceability, IPC classes.

      Quality Manager 2 weeks

    3. 3

      Sample FAI pack

      Redacted example.

      Quality Manager 2 weeks

    4. 4

      Build

      With the quote form.

      Website developer (contract) 1 week

    5. 5

      Promote

      LinkedIn and outreach to aerospace buyers.

      Sales and Business Development Lead 1 month

    6. 6

      Update

      When AS9100 is granted.

      Quality Manager ongoing

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Sales and Business Development Lead

    Smallest test

    Draft the page from the homepage facts this week.

    Why it works

    Publish an aerospace page with the FAI process, traceability, IPC/WHMA-A-620 class capability, the CAGE code, the AS9100 timeline and an approved description of the Phenom work. Offer a sample FAI package to buyers.

    Aerospace buyers qualify suppliers on documentation; showing it up front shortens supplier approval.

    Risks and how to handle them

    • Over-claiming certification

      Say "in progress" until the certificate is issued.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
  • 09

    The site lists high-voltage cable assemblies, HV harnesses and battery interconnects for EV platforms, and SMT already holds IATF 16949 and runs 100% testing. EV, battery storage and charging companies need domestic harness suppliers for prototypes and low-volume production.

    High impactMedium effort First result in 2 quarters Sales and Business Developmen…

    First action

    List 20 target companies in Illinois, Indiana, Michigan and Ohio.

    How to measure it

    EV prototype orders

    Now
    –
    Target
    2
    By
    2 quarters

    Steps

    1. 1

      Build list

      50 companies and engineering contacts.

      Sales and Business Development Lead 2 weeks

    2. 2

      Capability sheet

      HV-specific one-pager.

      Engineering Manager 1 week

    3. 3

      Sequence

      Three emails and LinkedIn notes.

      Sales and Business Development Lead 1 week

    4. 4

      Prototype offer

      Fixed lead time for samples.

      Engineering Manager 1 week

    5. 5

      Follow up

      Calls to openers.

      Sales and Business Development Lead 1 month

    6. 6

      Review

      Replies and quotes.

      General Manager monthly

    First result
    2 quarters
    Cost
    Sales time and sample costs
    Owner
    Sales and Business Development Lead

    Smallest test

    Email ten companies with the HV capability sheet.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Build a list of 50 EV, battery-storage, charger and electric equipment makers within a day's drive, write an HV capability sheet (cable sizes up to 1,000 MCM, testing, IATF), and run a three-touch email and LinkedIn sequence offering a prototype build.

    Low and mid-volume EV programs are often too small for large offshore harness houses and value a nearby, certified supplier.

    Risks and how to handle them

    • HV safety requirements

      Confirm test equipment ratings before quoting.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
    • Competitor researchRivals' own sites: NAI, "Global Leader in Custom Interconnect Solutions", designs and manufactures cable assemblies and harnesses; Consolidated Electronic Wire & Cable (Conwire, Franklin Park, IL) makes standard and custom electronic wire and cable. Directory searches for Naperville-area harness makers return few local results.Source
  • 10

    SMT's capabilities (30 AWG to 1,000 MCM, coil winding, welding, overmolding, PCB integration, EDI and JIS) and certifications are only on the website. Buyers forward PDFs internally when they add a supplier.

    High impactLow effort First result in 1 month Sales and Business Developmen…

    First action

    Draft the content from the homepage.

    How to measure it

    Downloads

    Now
    –
    Target
    30 a quarter
    By
    2 quarters

    Steps

    1. 1

      Draft content

      From the homepage.

      Sales and Business Development Lead 1 day

    2. 2

      Equipment list

      Key machines and testers.

      Engineering Manager 1 day

    3. 3

      Design

      Two pages, brand colors.

      Graphic designer (contract) 1 week

    4. 4

      Publish

      Link on the site.

      Website developer (contract) 1 hour

    5. 5

      Attach

      To every quote.

      Sales and Business Development Lead ongoing

    6. 6

      Refresh

      When certifications change.

      Quality Manager ongoing

    First result
    1 month
    Cost
    Around $500 for design
    Owner
    Sales and Business Development Lead

    Smallest test

    Make a one-page version in a word processor this week.

    Why it works

    Design a two-page PDF: capabilities, equipment, testing, certifications, CAGE code, industries and contact; link it from the site and attach it to every quote.

    A clean capability sheet is how a supplier gets added to approved vendor lists and passed to engineering.

    Risks and how to handle them

    • Goes out of date

      Date it and review each quarter.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
  • 11

    With 50+ employees and no visible sales team on the site, SMT relies on existing relationships. Independent reps who already sell connectors, components or PCBs to OEMs can introduce a harness supplier into accounts they visit every month.

    High impactMedium effort First result in 2 quarters Sales and Business Developmen…

    First action

    Ask two connector distributors which reps cover your region.

    How to measure it

    Rep-sourced RFQs

    Now
    –
    Target
    6 a quarter
    By
    3 quarters

    Steps

    1. 1

      Find reps

      Complementary lines, Midwest.

      Sales and Business Development Lead 1 month

    2. 2

      Set terms

      Commission and territories.

      General Manager 2 weeks

    3. 3

      Sign two

      Agreements.

      General Manager 1 month

    4. 4

      Train

      Plant tour and samples.

      Engineering Manager 1 day

    5. 5

      Support

      Fast quotes for rep leads.

      Sales and Business Development Lead ongoing

    6. 6

      Review

      RFQs and wins per rep.

      General Manager quarterly

    First result
    2 quarters
    Cost
    Commission on new business
    Owner
    Sales and Business Development Lead

    Smallest test

    Meet one rep agency this month.

    Why it works

    Find reps that carry complementary lines (connectors, enclosures, PCB assembly) in the Midwest, offer a standard commission on new accounts, and give them the line card, sample harnesses and a quote turnaround promise.

    Reps add sales coverage without salaries and bring warm introductions to engineers.

    Risks and how to handle them

    • Reps carry competing lines

      Exclude direct harness competitors in the contract.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Competitor researchRivals' own sites: NAI, "Global Leader in Custom Interconnect Solutions", designs and manufactures cable assemblies and harnesses; Consolidated Electronic Wire & Cable (Conwire, Franklin Park, IL) makes standard and custom electronic wire and cable. Directory searches for Naperville-area harness makers return few local results.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
  • 12

    SMT's strongest proof is its 100% monitoring: crimp force monitoring that stops the line, sensor-based stripping and 100% continuity testing. Buyers rarely see how suppliers check quality until an audit.

    Medium impactLow effort First result in 1 month Sales and Business Developmen…

    First action

    Film the crimp monitor stopping the line on a bad crimp.

    How to measure it

    Video views

    Now
    –
    Target
    2,000 a quarter
    By
    2 quarters

    Steps

    1. 1

      Plan clips

      Four quality steps.

      Quality Manager 1 day

    2. 2

      Film

      Phone, steady light.

      Operations Manager 1 day

    3. 3

      Edit

      Captions and logo.

      Sales and Business Development Lead 2 days

    4. 4

      Post

      One a week on LinkedIn.

      Sales and Business Development Lead weekly

    5. 5

      Embed

      On the quality page.

      Website developer (contract) 1 hour

    6. 6

      Use in sales

      Link in quote emails.

      Sales and Business Development Lead ongoing

    First result
    1 month
    Cost
    $0
    Owner
    Sales and Business Development Lead

    Smallest test

    Post one clip this month.

    Why it works

    Film four 30-60 second clips on a phone (crimp monitor stopping the line, cross section, pull test, test board) and post them on LinkedIn and the quality page with captions.

    Showing the process builds trust with quality engineers before a supplier audit and stands out from competitors who show only stock photos.

    Risks and how to handle them

    • Customer parts on camera

      Film only SMT test parts.

    Evidence

    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
  • 13

    The site lists industries and capabilities but no projects or results. Buyers want to know SMT has solved a problem like theirs.

    High impactMedium effort First result in 2 quarters Sales and Business Developmen…

    First action

    Pick three programs with measurable results.

    How to measure it

    Case study page views

    Now
    –
    Target
    200 a quarter
    By
    2 quarters

    Steps

    1. 1

      Pick programs

      Three with results.

      General Manager 1 week

    2. 2

      Collect data

      Delivery, quality, lead time.

      Quality Manager 2 weeks

    3. 3

      Write

      One page each.

      Sales and Business Development Lead 2 weeks

    4. 4

      Permissions

      Named or anonymized.

      General Manager 2 weeks

    5. 5

      Publish

      Site and PDF.

      Website developer (contract) 1 week

    6. 6

      Use

      In quotes and outreach.

      Sales and Business Development Lead ongoing

    First result
    2 quarters
    Cost
    Staff time only
    Owner
    Sales and Business Development Lead

    Smallest test

    Write one story about a prototype that went to production.

    Why it works

    Write three one-page stories with the problem, what SMT built, the testing and the result (on-time delivery, zero escapes, lead time). Name customers only with permission.

    Concrete stories turn a capability list into proof and give sales something to send after the first call.

    Risks and how to handle them

    • Confidentiality

      Anonymize by default.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
  • 14

    Few local harness makers show up in Naperville-area searches, and SMT's site has little that Google can index. A full Google Business Profile shows in Maps and local results for "wire harness manufacturer near me".

    Medium impactLow effort First result in 1 month Sales and Business Developmen…

    First action

    Upload 20 photos of the production floor.

    How to measure it

    Profile actions

    Now
    –
    Target
    40 a month
    By
    90 days

    Steps

    1. 1

      Claim/verify

      Profile ownership.

      Sales and Business Development Lead 1 week

    2. 2

      Categories

      Manufacturer and harness categories.

      Sales and Business Development Lead 30 minutes

    3. 3

      Photos

      20 shop-floor images.

      Operations Manager 1 day

    4. 4

      Products

      One per capability.

      Sales and Business Development Lead 2 hours

    5. 5

      Reviews

      Five customers.

      General Manager 1 month

    6. 6

      Posts

      Monthly updates.

      Sales and Business Development Lead monthly

    First result
    1 month
    Cost
    $0
    Owner
    Sales and Business Development Lead

    Smallest test

    Add photos and products this week.

    Why it works

    Complete the profile: category, hours (8 to 5 CT), 20 shop-floor photos, products for each capability with links, and ask five long-term customers for a short review.

    Engineers at nearby OEMs often search locally first for prototypes and quick turns.

    Risks and how to handle them

    • Few reviews in B2B

      Ask customers with long relationships.

    Evidence

    • Competitor researchRivals' own sites: NAI, "Global Leader in Custom Interconnect Solutions", designs and manufactures cable assemblies and harnesses; Consolidated Electronic Wire & Cable (Conwire, Franklin Park, IL) makes standard and custom electronic wire and cable. Directory searches for Naperville-area harness makers return few local results.Source
    • Your websiteContact details: 2768 Golfview Drive, Naperville; main line (630) 961-3000; [email protected]; hours Monday to Friday 8:00 AM to 5:00 PM CT; the General Manager's direct email. robots.txt asks crawlers to wait 30 seconds between requests.Source
    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
  • 15

    SMT has decades-long customer relationships and measures 100% of critical characteristics. Customers measure their suppliers anyway; sending your own scorecard first shows control and opens the door to new part numbers.

    High impactLow effort First result in 1 quarter Quality Manager

    First action

    Make a scorecard for the top account from last quarter's data.

    How to measure it

    New part numbers awarded

    Now
    –
    Target
    +20%
    By
    3 quarters

    Steps

    1. 1

      Pick metrics

      Four measures.

      Quality Manager 1 week

    2. 2

      Build template

      One page.

      Quality Manager 1 week

    3. 3

      Send

      Top ten accounts.

      Sales and Business Development Lead quarterly

    4. 4

      Review call

      30 minutes each.

      General Manager quarterly

    5. 5

      Ask

      Upcoming programs.

      Sales and Business Development Lead quarterly

    6. 6

      Track

      New awards.

      Sales and Business Development Lead quarterly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Quality Manager

    Smallest test

    Send one scorecard this quarter.

    Why it works

    Each quarter, send top accounts a one-page scorecard (on-time delivery, PPM, open corrective actions, upcoming capacity) and use the review call to ask about new programs.

    Most harness growth comes from more part numbers at existing customers, and a quality-led review is a natural time to ask.

    Risks and how to handle them

    • Bad quarter numbers

      Show the corrective action alongside.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
  • 16

    SMT can trade EDI 830 forecasts and 866 sequence schedules and deliver just in sequence, which many small harness shops cannot. It is listed but not explained.

    Medium impactMedium effort First result in 1 quarter Sales and Business Developmen…

    First action

    Ask the EDI coordinator which trading partners are live today.

    How to measure it

    Tier 1 RFQs

    Now
    –
    Target
    3 a quarter
    By
    2 quarters

    Steps

    1. 1

      Document

      EDI and JIS setup.

      Operations Manager 1 week

    2. 2

      Write section

      Plain-language benefits.

      Sales and Business Development Lead 1 week

    3. 3

      Publish

      Automotive page.

      Website developer (contract) 1 day

    4. 4

      Target list

      Regional Tier 1 plants.

      Sales and Business Development Lead 2 weeks

    5. 5

      Outreach

      Purchasing and materials managers.

      Sales and Business Development Lead 1 month

    6. 6

      Review

      RFQs.

      General Manager monthly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Sales and Business Development Lead

    Smallest test

    Add three sentences on EDI and JIS to the automotive section.

    Build the prospect list. The list compiled from public sources, verified, deduplicated and delivered to your CRM. Usually live within days.

    Book a working session

    Why it works

    Write a supply-chain integration section (EDI transactions, JIS, kanban, packaging and labeling) and target automotive and heavy-equipment Tier 1 plants in the region with it.

    Tier 1 plants choose suppliers who fit their scheduling systems; it removes a reason to keep work with larger vendors.

    Risks and how to handle them

    • Capacity for JIS

      Confirm before offering it to new accounts.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source

Big bets 3

Larger plays that can change the trajectory.

  • 17

    AS9100 is "in progress". Many aerospace primes and their Tier 2s require it for approved supplier lists, so certification opens accounts that AS9102C alone cannot.

    High impactHigh effort First result in 3 quarters Quality Manager

    First action

    Confirm the audit date with the registrar.

    How to measure it

    Approved supplier listings

    Now
    –
    Target
    3
    By
    4 quarters

    Steps

    1. 1

      Gap check

      Remaining AS9100 items.

      Quality Manager 1 month

    2. 2

      Audit

      Registrar audit.

      Quality Manager 1 quarter

    3. 3

      Prepare launch

      Pages, sheet, outreach list.

      Sales and Business Development Lead 1 month

    4. 4

      Announce

      LinkedIn, directories, press release.

      Sales and Business Development Lead 1 week

    5. 5

      Outreach

      40 aerospace buyers.

      Sales and Business Development Lead 1 quarter

    6. 6

      Event

      One supplier event.

      General Manager 1 quarter

    First result
    3 quarters
    Cost
    Registrar fees and travel
    Owner
    Quality Manager

    Smallest test

    Build the 40-buyer list now so it is ready on the day.

    Why it works

    Set a date for the certification audit, then plan the launch: announcement, updated pages and directories, outreach to 40 aerospace buyers, and a stand or meetings at one aerospace supplier event.

    Certification is a gate; marketing it at the moment it is granted turns a compliance project into pipeline.

    Risks and how to handle them

    • Audit delays

      Do not announce until the certificate is issued.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Business directoriesZoomInfo describes SMT as a precision manufacturer of coil winding, injection molding and contract manufacturing for aerospace, automotive and military clients, with 51-200 employees; it does not lead with wire harnesses, which is how the website now positions the company.Source
  • 18

    SMT supports prototype to production and runs DFM reviews, but there is no packaged prototype offer. Engineers choose prototype suppliers on speed, and the prototype supplier often wins the production order.

    High impactHigh effort First result in 3 quarters Engineering Manager

    First action

    Measure the current average prototype lead time.

    How to measure it

    Prototype-to-production rate

    Now
    –
    Target
    30%
    By
    4 quarters

    Steps

    1. 1

      Measure today

      Lead times for recent prototypes.

      Engineering Manager 2 weeks

    2. 2

      Define service

      Limits, lead time, pricing.

      General Manager 2 weeks

    3. 3

      Reserve capacity

      A small cell.

      Operations Manager 1 month

    4. 4

      Publish

      Page and order form.

      Website developer (contract) 2 weeks

    5. 5

      Promote

      Engineers and reps.

      Sales and Business Development Lead 1 quarter

    6. 6

      Track

      Conversion to production.

      Sales and Business Development Lead quarterly

    First result
    3 quarters
    Cost
    Capacity set aside
    Owner
    Engineering Manager

    Smallest test

    Offer a fixed prototype lead time to the next three RFQs.

    Why it works

    Define a prototype service (for example, up to 25 harnesses in a set number of days with DFM notes), reserve a small cell for it, publish it with an order form and track how many prototypes become production programs.

    A fast, predictable prototype lane brings engineers in early, when the production supplier is decided.

    Risks and how to handle them

    • Prototype work disrupts production

      Keep a separate cell and cap volume.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
    • Your websiteThe "Get In Touch" quote form has First Name, Last Name, Company, Phone, Email and Project Details fields and a "Send Request" button, but the page has no form element and its only script handles scroll effects, the menu background and anchor links, so pressing "Send Request" sends nothing. There is no way to attach a drawing or bill of materials. Checked October 20, 2026.Source
  • 19

    SMT already integrates with customer scheduling (EDI, JIS). Holding stock of repeat harnesses at the customer or in a kanban loop makes SMT harder to replace.

    Medium impactHigh effort First result in 4 quarters Operations Manager

    First action

    Identify the ten harnesses with the steadiest repeat demand.

    How to measure it

    Accounts on VMI/kanban

    Now
    –
    Target
    2
    By
    4 quarters

    Steps

    1. 1

      Find parts

      Steady repeat demand.

      Operations Manager 2 weeks

    2. 2

      Design program

      Min/max, replenishment.

      Operations Manager 1 month

    3. 3

      Propose

      Two customers.

      General Manager 1 month

    4. 4

      Pilot

      One quarter.

      Operations Manager 1 quarter

    5. 5

      Measure

      Stockouts, orders.

      Operations Manager monthly

    6. 6

      Expand

      More parts and accounts.

      General Manager quarterly

    First result
    4 quarters
    Cost
    Inventory carrying cost
    Owner
    Operations Manager

    Smallest test

    Propose kanban for one part at one customer.

    Why it works

    Pick two customers with steady demand, agree a kanban or VMI program (min/max levels, replenishment and pricing), and measure stockouts and order frequency.

    Customers keep suppliers who remove work from their planners, and steady volume improves SMT's own scheduling.

    Risks and how to handle them

    • Inventory risk on design changes

      Agree buy-back terms for obsolete stock.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source

Wildcards 3

Unexpected experiments, each with a cheap way to test it.

  • 20

    All SMT production and quality staff are IPC/WHMA-A-620 certified, and the site has no careers section. Growth into aerospace and EV needs trained assemblers, and recruiting is part of being able to say yes to new programs.

    Medium impactMedium effort First result in 1 quarter General Manager

    First action

    Write a careers page with one open role.

    How to measure it

    Applicants per opening

    Now
    –
    Target
    10
    By
    2 quarters

    Steps

    1. 1

      Write page

      Training, hours, benefits.

      General Manager 1 week

    2. 2

      Post roles

      Indeed and local boards.

      General Manager 1 week

    3. 3

      College links

      Local technical programs.

      General Manager 1 month

    4. 4

      Referral bonus

      For staff.

      General Manager 1 week

    5. 5

      Interview

      Hands-on crimp test.

      Operations Manager ongoing

    6. 6

      Track

      Hires and retention.

      General Manager quarterly

    First result
    1 quarter
    Cost
    Job board costs
    Owner
    General Manager

    Smallest test

    Post one role this month.

    Why it works

    Add a careers page that explains the IPC training SMT provides, shift hours and benefits, post roles on Indeed and with local community colleges, and offer a referral bonus to staff.

    A steady pipeline of trained operators lets SMT accept new programs without stretching lead times.

    Risks and how to handle them

    • Training time

      Pair new hires with certified trainers.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteThe whole site is one page with anchor sections (About, Capabilities, Quality, Industries, Certifications, Contact); other paths such as /about, /capabilities and /sitemap.xml return an error (HTTP 406). The homepage has no meta description, social share image or favicon, the footer says "© 2025", and visitors who type http:// are not sent to the secure site.Source
  • 21

    SMT's 100% testing and its long history are most convincing in person. Few Chicago-area harness suppliers invite buyers in outside of audits.

    Medium impactMedium effort First result in 2 quarters Sales and Business Developmen…

    First action

    Pick a date and draft the invitation list.

    How to measure it

    RFQs within 60 days

    Now
    –
    Target
    5
    By
    2 quarters

    Steps

    1. 1

      Date and plan

      Half-day agenda.

      General Manager 2 weeks

    2. 2

      Invite list

      60 companies.

      Sales and Business Development Lead 2 weeks

    3. 3

      Invitations

      Email and LinkedIn.

      Sales and Business Development Lead 1 month

    4. 4

      Run the day

      Tours and demos.

      Operations Manager 1 day

    5. 5

      Film

      Clips for LinkedIn.

      Sales and Business Development Lead 1 day

    6. 6

      Follow up

      Every attendee.

      Sales and Business Development Lead 2 weeks

    First result
    2 quarters
    Cost
    Under $2,000 for food and materials
    Owner
    Sales and Business Development Lead

    Smallest test

    Invite five customers' engineers for a tour first.

    Why it works

    Host a half-day open house: plant tour, crimp and test demonstrations, a DFM talk and lunch; invite engineers and buyers from 60 nearby companies and film it for LinkedIn.

    A visit shortens supplier approval and gives sales a reason to call every target account.

    Risks and how to handle them

    • Low turnout

      Invite personally and confirm a week before.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source
    • Your websiteContact details: 2768 Golfview Drive, Naperville; main line (630) 961-3000; [email protected]; hours Monday to Friday 8:00 AM to 5:00 PM CT; the General Manager's direct email. robots.txt asks crawlers to wait 30 seconds between requests.Source
  • 22

    SMT manufactures everything in Naperville with full in-process testing. OEMs reviewing offshore supply often want a domestic option for short lead times and engineering changes.

    Medium impactLow effort First result in 1 quarter Sales and Business Developmen…

    First action

    Write the five questions buyers should ask when comparing offshore and domestic harness costs.

    How to measure it

    Comparison quotes

    Now
    –
    Target
    4 a quarter
    By
    2 quarters

    Steps

    1. 1

      Write page

      Lead time, changes, quality.

      Sales and Business Development Lead 1 week

    2. 2

      Cost questions

      Landed-cost checklist.

      Sales and Business Development Lead 1 week

    3. 3

      Publish

      Site and PDF.

      Website developer (contract) 1 day

    4. 4

      Email

      Target buyers.

      Sales and Business Development Lead 1 month

    5. 5

      Quote

      One part comparisons.

      Engineering Manager ongoing

    6. 6

      Review

      Wins and losses.

      General Manager quarterly

    First result
    1 quarter
    Cost
    Staff time only
    Owner
    Sales and Business Development Lead

    Smallest test

    Send the comparison offer to five buyers.

    Why it works

    Write a page and email for buyers considering a domestic harness source: lead times, engineering-change speed, quality data and total landed cost questions to ask. Offer a quote comparison on one part.

    Domestic sourcing decisions are made part by part; making it easy to compare one part opens the conversation.

    Risks and how to handle them

    • Price gap too big

      Lead with lead time and change speed.

    Evidence

    • Your websiteHomepage: "Naperville, Illinois · Founded 1989 · 35+ Years"; a U.S. manufacturer of wire harnesses, cable assemblies and electromechanical assemblies with "50+ Employees", "100% In-Process Testing", IATF 16949, ISO 9001, ISO 14001 and IPC/WHMA-A-620 (all staff certified), AS9102C First Article Inspection compliant, CAGE Code 8GFS4, "AS9100 in progress", "Embraer Phenom programs", wire from "30 AWG to 1,000 MCM", and EDI 830/866 with Just-In-Sequence delivery.Source
    • Competitor researchRivals' own sites: NAI, "Global Leader in Custom Interconnect Solutions", designs and manufactures cable assemblies and harnesses; Consolidated Electronic Wire & Cable (Conwire, Franklin Park, IL) makes standard and custom electronic wire and cable. Directory searches for Naperville-area harness makers return few local results.Source
    • Your websiteCapabilities list: coil winding, resistance and ultrasonic welding, insert molding, overmolding, heat shrink, smart harness assembly boards, PCB integration, custom packaging and labeling; Electric Vehicles section: "High voltage cable assemblies, HV harnesses, and battery interconnect systems for EV platforms". Quality section: 100% crimp force monitoring, 100% cut and strip monitoring, cross sectioning on every setup, pull testing, and 100% continuity testing.Source

03

How Programmable can help

Where an idea in this playbook is something Programmable builds or runs, it's listed here with what we'd do. Everything else is yours to run.

Have it built

ProgrammableAgency

2 of the 22 ideas are things Programmable builds and runs for its customers: pages, outreach, prospect lists, booking flows and monitors. Pick one, or send the whole list.

Prospect lists2The list compiled from public sources, verified, deduplicated and delivered to your CRM.

A 30-minute session with the engineer who would build it, not a sales call. You leave with a plan whether or not you hire us.

Book a working session

Usually live within days.

Tools for the rest

ProgrammableDigital

Show it, don't just describe it

These ideas need something to show: a demo, a video, an animation, graphics or a deck. Digital turns screenshots or the site into all of them, in the company's own brand.

Make a demo (opens programmable.digital in a new tab)
More example playbooks and reviews

More growth playbooks

Other companies we have researched, each read from what they are hiring for.

  • Rubrik growth strategyA security and AI operations company: Rubrik Security Cloud protects, monitors and recovers data, identities and workloads across clouds…22 growth ideas
  • Simplifi Networks growth strategyA master distributor of networking and communications equipment (Ubiquiti, MikroTik, Huawei eKit, Ruijie/Reyee, Teltonika, Sopto and more)…21 growth ideas
  • OneGTM growth strategyA founder-led GTM engineering agency in New York that builds outbound, signal, enrichment, RevOps and AI systems inside the client's own…22 growth ideas
  • Close growth strategyA sales CRM with built-in calling, email, SMS, workflows, reporting and Chloe, an AI sales agent that calls and qualifies leads, books…20 growth ideas
  • MindFort growth strategyAn autonomous pentesting platform: swarms of AI security agents attack a company's live web apps and APIs, prove each exploit, open a…23 growth ideas
  • Smartly growth strategyAn AI advertising platform that produces, personalizes and runs creative and media across social, CTV, open web and other channels, with…21 growth ideas
  • Thirdlove growth strategyA design-led bra and underwear brand that invented half-cup sizes and the Fitting Room quiz, selling online, in its own fitting-led…22 growth ideas
  • Develop Health growth strategyAI software that automates prior authorization and benefit verification: it drafts answers from chart notes, submits, follows up and…20 growth ideas

See every playbook and website review

Independent research. Programmable wrote this playbook from public sources, as they stood on October 21, 2026, and cites them throughout. SMT LLC Group did not commission, review or endorse it, and Programmable is not affiliated with SMT LLC Group. Company and product names are trademarks of their owners, used only to identify them. The ideas are suggestions and opinion, not professional, legal or financial advice, and not statements about how SMT LLC Group runs its business.

Something wrong, or do you represent SMT LLC Group? Email [email protected] and we will correct it or take it down.

30/60/90 roadmap

What to focus on in each month, and the ideas that carry it.

  1. Days 1 to 307 ideas

    Working quote form, a faster page, search basics, email authentication, directory profiles and the RFQ checklist; start the careers page.

  2. Days 31 to 6012 ideas

    Capability and aerospace pages, EV outreach, the line card, reps, videos, case studies, Google profile, scorecards and EDI; the open plant day and the domestic sourcing pitch.

  3. Days 61 to 903 ideas

    Commit to AS9100 and its launch, a quick-turn prototype lane and kanban programs.

The research behind the plan

2 research areas, each summarised in a few lines. Open any of them for the full detail.

Customers

What customers say

Customers value 100% testing with zero escapes. The most cited problem: slow or incomplete quotes from suppliers.

  • One accountable partner from prototype to production
  • Quality escapes in harnesses
  • In their words: “build to print”

Market

Competitive landscape

3 competitors compared: NAI, Consolidated Electronic Wire & Cable (Conwire) and Offshore harness suppliers.

  • Gap to exploit: Certified domestic harness supply for low and mid-volume EV programs
  • NAI: Less local and personal for small programs
  • Consolidated Electronic Wire & Cable (Conwire): Wire and cable more than finished harness programs

From the team that wrote this playbook

All products
  • ProgrammableAgencyWorking AI systems in days, not quarters (opens programmable.agency in a new tab)
  • ProgrammableInfoAn agent that finds, researches and asks firstNew accounts get 100,000 free enrichment credits with code BETA100K (opens programmable.info in a new tab)
  • ProgrammableDigitalScreenshots in, an animated product demo out (opens programmable.digital in a new tab)
  • ProgrammableWatchKnow the day a supplier falls out of compliance (opens programmable.watch in a new tab)
  • ProgrammableTalkGet registrants for your events, and know who’s coming (opens programmable.talk in a new tab)
  • ProgrammableMediaAn AI note taker, interpreter and webinar host for your calls (opens programmable.media in a new tab)
  • ProgrammablePageText what you need, your customer gets a page that works (opens programmable.page in a new tab)
  • ProgrammableCommunityForums with labelled AI members, never empty (opens programmable.community in a new tab)
ProgrammableMarketing
ExamplesLeaderboardsProductsTermsPrivacyCookiesDPALegalContact

© 2026 AI-Powered Growth Intelligence